L-17-015, Submittal of Revised October 2016 Discharge Monitoring Report

From kanterella
Jump to navigation Jump to search
Submittal of Revised October 2016 Discharge Monitoring Report
ML18017A230
Person / Time
Site: Beaver Valley
Issue date: 01/05/2018
From: Grabnar J
FirstEnergy Nuclear Operating Co
To: Clerk D
Document Control Desk, Office of Nuclear Reactor Regulation, State of PA, Dept of Environmental Protection, Bureau of Water Quality Management
References
L-17-015, PA0025615
Download: ML18017A230 (61)


Text

Beaver Valley Power Station FENOC FirstEnergy Nuclear Operating Company ~

Route 168 P.O. Box4 Shippingport, PA 15077-0004 January 5, 2018 L-17-015 Department of Environmental Protection Bureau of Water Quality Management Attention: DMR Clerk 400"Waterfront Drive

  • Pittsburgh, PA 15222

SUBJECT:

Beaver Valley Power Station Discharge Monitoring Report (NPDES) Permit No.

PA0025615 Enclosed is the Revised October 2016 NPDES Discharge Monitoring Report (DMR) for FirstEnergy Nuclear Operating Company (FENOC), Beaver Valley Power Station, in accordance with the requirements of the Permit. Attachment 1 to this letter is supplemental monitoring data for Outfall 001 (dissolved oxygen). Attachment 2 is the explanation of NODI codes. Attachment 3 is the quarterly storm water results.

Revisions to the report include flow at Outfall 001, addition of"<" to Monthly Average of TSS at Outfall 103, and deletion of"<" for Daily Max TSS at Outfall 111. Additionally, the NAME/TITLE PRINCIPAL EXECUTIVE OFFICER was updated to reflect the current signee, John Grabnar.

A revie\!V of the data indicates no permit parameters were exceeded during the month.

Included with the report are two Supplemental Laboratory Accreditation Forms for analyses performed to support permit requirements as required by 25 Pa. Code § 252.

Should you have any questions regarding the attached and enclosed documents, please direct them to Ms. Amy Savage, at 724-682-4209.

Sincerely,

,John J. Grabnar General Plant Manager

Beaver Valley Power Station, Unit Nos. 1 and 2 L-17-015 Page 2 Attachment(s):

1. Weekly Dissolved Oxygen Monitoring Results at Outfall 001
2. Explanation of NODI Codes
3. Quarterly Stormwater Report Enclosure(s)

A. Discharge Monitoring Report B. Supplemental Laboratory Accreditation Form cc: Document Control Desk US NRC (NOTE: No new us NRC commitments are contained in this letter.)

US Environmental Protection Agency Ms. Amanda Schmidt, PA DEP/Bureau of Water Quality Management

Discharge Monitoring Report Attachment for NPDES Permit No. PA0025615 L-17-015 FirstEnergy Nuclear Operating Company (FENOC)

Beaver Valley Power Station ATTACHMENT 1 Weekly Dissolved Oxygen Monitoring Results at Outfall 001 The following supplemental dissolved oxygen monitoring data for Outfall 001 is provided as agreed.

SAMPLE DATE SAMPLE TIME VALUE UNITS 03-0ct-16 11:50:00AM 7 mg/L 09-0ct-16 12:40:00 PM 7 mg/L 17-0ct-16 08:15:00 AM 7 mq/L 23-0ct-16 08:30:00AM 8 mq/L 30-0ct-16 10:00:00 AM 7 mq/L

- Attachment 1 END -

Discharge Monitoring Report Attachment for NPDES Permit No. PA0025615 L-17-015 FirstEnergy Nuclear Operating Company (FENOC)

Beaver Valley Power Station ATTACHMENT 2 Explanation of NODI Codes SAMPLE SAMPLE DOMI COMMENT PARAMETER CODE 001A CT-1 GG Clamicide not performed 010A CT-1 GG Clamicide not performed

-Attachment 2 END -

Discharge Monitoring Report Attachment for NPDES Permit No. PA0025615 L-17-015 FirstEnergy Nuclear Operating Company (FENOC)

Beaver Valley Power Station ATTACHMENT 3 Permit Part C.21 Iron and Zinc Stormwater Monitoring Results Sample Sample Date Time Outfall Parameter Result Units 20-0ct-16 0955 Outfall #003 Zinc 0.0748 mg/I 20-0ct-16 0955 Outfall #003 Iron 0.3460 mg/I 20-0ct-16 0955 Outfall #008 Zinc 0.0144 mg/I 20-0ct-16 0955 Outfall #008 Iron 0.0514 mg/I 20-0ct-16 1605 Outfall #011 Zinc 0.0964 mg/I 20-0ct-16 1605 Outfall #011 Iron 0.0994 mg/I

- Attachment 3 END -

',4 3800-FM-WSFR0189 Rev. 3/2009 COMMONWEALTH OF PENNSYLVANIA g ~-~!!~~~~~.~!~. DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER STANDARDS AND FACILITY REGULATION SUPPLEMENTAL LABORATORY ACCREDITATION FORM 1 Permittee Name: FirstEnergy Nuclear Operating Company Address: P.O. Box4 Shippingport. PA 15077 Beaver Valley Power Station PERMIT NUMBER MONITORING PERIOD Year/Month/Day PA0025615 2016 10 01 TO 2016 10 31 Quaternary Amine Photometric Determination Beaver Valley Power Station Compounds Yz-CHM-ANA-4.23H I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete, I am aware that there are significant penalties for submitting false information, including the possibly of fine and imprisonment for knowing violations, Signature of Principal Executive Officer or Name/Title Principal Executive Officer Phone: 724-682-7773

~izedAgent John J. Grabnar General Plant Manager Date: 12-28-2017 1

Submit this form with the first Discharge Monitoring Report (DMR), Annual Report or Recordkeeping and Reporting Form, where sample results are submitted to the Department for compliance purposes. You do not need to send this form to the Department again UNLESS there has been a change to the lab or method of analysis.

2 For parameter(s) covered under accreditation-by-rule, submit the lab's registration number in lieu of an accreditation number.

. 3800-FM-WSFR0189 Rev. 3/2009 COMMONWEALTH OF PENNSYLVANIA C ~-~!!~~1~.~-~!,!.00 DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER STANDARDS AND FACILITY REGULATION SUPPLEMENTAL LABORATORY ACCREDITATION FORM 1 Permittee Name: FirstEnergy Nuclear.Operating Company Address: P.O. Box4 Shippingport, PA 15077 Beaver Valley Power Station PERMIT NUMBER MONITORING PERIOD Year/Month/Day PA0025615 2016 10 01 TO 2016 10 31

  • 2012 EPA Method Update Rule (MUR) no longer cites Standard Method editions I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibly of fine and imprisonment for knowing violations.

Signature of Principal Executive Officer or Name/Title Principal Executive Officer Phone: 724-682-7773 Authorized Agent John J. Grabnar General Plant Manager Date: 12-28-2017 A '

~

1 Submit this form with the first Discharge Monitoring Report (DMR), Annual Report or Recordkeeping and Reporting Form, where sample results are submitted to the Department for compliance purposes. You do not need to send this form to the Department again UNLESS there has been a change to the lab or method of analysis.

2 For parameter(s) covered under accreditation-by-rule, submit the lab's registration number in lieu of an accreditation number.

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved .,

DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004**

PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 001A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNITS 1&2 COOLG. TOWER BLWDN LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY I I MM/DD/YYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Nitrogen, ammonia total (as N)

MEASUREMENT 00610 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE CLAMTROL CT-1, TOTAL WATER MEASUREMENT 04251 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free available MEASUREMENT 50064 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Hydrazine MEASUREMENT 8131310 PERMIT Effluent Gross REQUIREMENT 1 certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE John J. Grabnar, GENERAL PLANT MANAGER properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. the 1nformatron submitted is. to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,

~o SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR 724 682-7773 12/ 28/ 2017 TYPED OR PRINTED including the poss1b1lity of fme and imprisonment for knowing violations.

AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

HYDRAZINE/ AMMONIA MONITORING APPLY DURING PERIODS OF WET LAYUP. REPORT DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING. THE LIMIT IS 35 MG/LAS A DAILY MAX.

10/27/16-10/31 /16 Twice daily grab samples for FAG were subsitiuted for continuous monitoring due to the unavailability of the monitor.

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 2 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 002A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION INTAKE SCREEN BACKWASH LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MM/DDNYYY I I MM/DDNYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROMI 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Flow, in conduit or thru treatment plant 0.006 0.046 MGD N/A N/A NIA NIA 1 / 7 EST MEASUREMENT 50050 1 0 Effluent Gross PERMIT REQUIREMENT !Xf1:;~~--

I certify under penalty of law that this document and all attachments were prepared under my NAMErrlTLE PRINCIPAL EXECUTIVE OFFICER direction or supervision In accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT MANAGER persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,

)\JU\A.fl 724 682-7773 12/ 28/ 2017 SIGMITURE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREA Code I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) oMB No. 2040.0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 3 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 003A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 003 LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY I I MM/DD/YYYY No DischargeD ATIN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Flow, in conduit or thru treatment plant 0.170 1.054 MGD NIA N/A NIA N/A 29 I 31 EST MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE A~A-o properly gather and evaluate the "information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, 724 682-7773 12/ 28/ 2017 MANAGER and complete. I am aware that there are significant penalties for submitting false information, S1GNA'1JRE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

THE FLOWS FOR OUTFALLS 103,203, 303, AND 403 ARE TO BE TOTALED AND REPORTED AS THE 003 FLOW.

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 4 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 004A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT ONE COOLG TOWER OVERFLOW LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A 7.9 N/A 8.0 pH 0 1 / 7 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free available MEASUREMENT 50064 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE 1------------'-"-'-C::....::::..C::C.:....C..;.:.:.c:....;:..:....:.-'-'-C:c..c..._----ldireclion or supervision in accordance with a system designed lo assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, 724 682-7773 12/ 28/ 2017 MANAGER and complete. I am aware that there are significant penalties for submitting false information, 1 - - - - - - - - - - - - - - - - - - - - - - - - l i n c l u d i n g the possibility of fine and imprisonment for knowing violations.

TYPED OR PRINTED AUTHORIZED AGENT AREA Code NUMBER MM/DDNYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 5 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 006A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION AUX. INTAKE SCREEN BACKWASH LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DDNYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Flow, in conduit or thru treatment plant 0.002 0.016 MGD N/A N/A N/A NIA 1 / 7 EST MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT l certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT MANAGER persons who manage the system, or those persons directly responsible for gathermg the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information. A~ 0 724 682-7773 12/ 28/ 2017 TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations. SIGN\TURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT AREA Code I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 6 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 007A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION AUX. INTAKE SYSTEM LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MM/DDNYYY I I MM/DDNYYY I No Discharge[XJ ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 101 011 2016 I TO I 101 31/ 2016 I NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free available MEASUREMENT 50064 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all atlachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE

~

properly gather and evaluate the information submitted. Based on my inquiry of lhe person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 12/ 28/ 2017 information, the information submitted is, to the best of my knowledge and belief, true. accurate, MANAGER and complete. I am aware thal there are significant penalties for submitting false information, SIGN1'TURE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the poss1bi11ty or fine and imprisonment for knowing violations AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

MONITORING FOR FLOW, FREE AVAILABLE CHLORINE, AND TOTAL RESIDUAL CHLORINE ARE REQUIRED ONLY DURING THOSE PERIODS OF DISCHARGE FROM THE ALTERNATE FLOW PATH OF THE REACTOR PLANT RIVER WATER SYSTEM.

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 7 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 008A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 1 COOLING TOWER PUMPHOUSE LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY I I MM/DD/YYYY No Discharge[XJ ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penally of law that this document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - - - - - - - - - - - ; d i r e c t i o n or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathermg the 724 682-7773 12/ 28/ 2017 information, the information submitted is, to the best of my knowledge and belief, true, accurate, MANAGER and complete. 1am aware that there are significant penalties for submitting false information, t - - - - - - - - - - - - - - - - - - - - - - - l m c l u d i n g the possibility of fine and imprisonment for knowing violations.

TYPED OR PRINTED AREA Code NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 8 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 010A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 2 COOLING WATER LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DischargeD ATIN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A 7.7 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE CLAMTROL CT-1, TOTAL WATER MEASUREMENT 04251 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free available MEASUREMENT 500641 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER 1 certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE t - - - - - - - - - - - - - - - - - - - - - l d i r e c t i o n or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry or the person or John J. Grab nar, GEN ERA L p LANT persons who manage the system. onhose persons d;"'"Y ,espons,bre 10, gathe,;ng the 724 682-7773 12/ 28/ 2017 information, the information submitted is, to the best of my knowledge and belief, true, accurate, t-M_A_N_A_G_E_R----------------<~n:~u~~:P:~!\ols::n~t;:,\~:~~~~~:~e5~;~:~t~:tk~n0:i~; ~~;1:~i~~~~ing false information, rsic~~~~~m':=~~~~iiiiiFnmCFIWR"'i------.--------+-----------l TYPED OR PRINTED AUTHORIZED AGENT AREA Code NUMBER MM/DDNYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35 MG/LAS A DAILY MAX)

Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 9 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 011A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION DIESEL GEN & TURBINE DRAINS LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY 1 1 MM/DD/YYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT MANAGER persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, AJ._JA.() 724 682-7773 12/ 28/ 2017 TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations. SIGNAT~E OF PRINCIPAL EXECOllVE OFFICER OR AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 10 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 012A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT. PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION SLOWDOWN FROM THE HVAC UNIT LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY I I MM/DD/YYYY No DischargeD ATIN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Copper. total (as Cu)

MEASUREMENT 01042 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Zinc, total (as Zn)

MEASUREMENT 01092 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total dissolved MEASUREMENT 702951 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT A-1.AAf?

persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, 724 682-7773 12/ 28/ 2017 MANAGER and complete. I am aware that there are significant penalties for submitting false Information, including the possibility of fine and imprisonment for knowing violations. S1GNATl1RE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED AUTHORIZED AGENT AREACode J NUMBER MM/DDNYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 11 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 013A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION OUTFALL 013 LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A 7.1 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Cyanide, total (as CN)

MEASUREMENT 00720 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Copper, total (as Cu)

MEASUREMENT 01042 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorobenzene <0.005 MEASUREMENT 34301 1 0 PERMIT ., R~q. -Mon.. ; *,;

Effluent Gross REQUIREMENT " DAILY, MX} ".:

SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all altachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervis1on in accordance with a system designed to assure that qua lifted personnel TELEPHONE DATE properly gather and evaluate the information submitted Based on my mqu1ry of the person or John J. Grabnar, GENERAL PLANT MANAGER persons who manage the system, or those persons directly responsible for gathering lhe information. the information submitted is. to the best of my knowledge and belief, true, accurate, and complete, I am aware that there are significant penalties for submitting false information, A__, /I.Ao 724 682-7773 12/ 28/ 2017 including the possibihty of fine and imprrsonment for knowing violations. SIGNAl'URE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED AUTHORIZED AGENT AREACode / NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

THERE SHALL BE NO DISCHARGE OF FLOATING SOLIDS OR VISIBLE FOAM IN OTHER THAN TRACE AMOUNTS.

Computer Generated Version of EPA fom, 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OM B No. 2040-0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 12 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 101A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 101 CHEMICAL WASTE TREATMENT LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DDNYYY No Discharge[KJ ATIN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Nitrogen, ammonia total (as N)

MEASUREMENT 0061010 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Hydrazine MEASUREMENT 81313 1 0 PERMIT Effluent Gross REQUIREMENT 1certify under penally of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE A~

properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 12/ 28/ 2017 information, the information submitted is, to the best of my knowledge and belief, true, accurate, MANAGER and complete. I am aware that there are significant penalties for submitting false information, SIGN'VURE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. SAMPLES SHALL BE TAKEN AT THE DISCHARGE FROM THE CHEMICAL WASTE SUMP PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 13 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 102A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 102 INTAKE SCREEN HOUSE LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DDNYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A 7.9 2 I 31 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE John J. Grabnar, GENERAL PLANT MANAGER property gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is. to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Iv-AA Q_ -

SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR 724 682-7773 12/ 28/ 2017 TYPED OR PRINTED AUTHORIZED AGENT AREACode j NUMBER MMIDD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT THE DISCHARGE OF COLLECTED PUMP BEARING LEAKAGE PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 14 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 103A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION SLUDGE SETTLING BASIN LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DDNYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH 2 I 31 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penally or law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER d1reclion or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE John J. Grabnar, GENERAL PLANT MANAGER properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, Jv.A~o SIGNATllRE OF PRINCIPAL EXECUTIVE OFFICER OR 724 682-7773 12/ 28/ 2017 TYPED OR PRINTED including the possibihty of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREACode I NUMBER MM/DDNYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT THE OVERFLOW FROM THE BASIN PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 15 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 111A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 111 DIESEL GENERATOR BLDG LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DD/YYYY No DischargeD ATIN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE 1 / 7 pH GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT MANAGER persons who manage the system, or those persons direclly responsible for gathering the information, the information submitted is. to the best of my knowledge and belief, trlle. acctJrate, and complete. I am aware that there are significant penalties for Sllbmitting false mformalion,

~AO 724 682-7773 12/ 28/ 2017 TYPED OR PRINTED includmg the possibility of fine and imprisonment for knowing violations. SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 16 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 113A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 2 SEWAGE TMT PLANT LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY I 1 MM/DD/YYYY No Discharge[KJ ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Coliform, fecal general MEASUREMENT 74055 1 1 PERMIT Effluent Gross REQUIREMENT SAMPLE BOD, carbonaceous, 05 day 20 C MEASUREMENT 80082 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE

~ {)

properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 12/ 28/ 2017 information, the information submitted is, to the best of my knowledge and belief. true, accurate, MANAGER and complete. I am aware that there are significant penalties for submitting false information, SIGNAiURE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations AUTHORIZED AGENT AREA Code I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT OVERFLOW FROM THE CHLORINE CONTACT TANK PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 17 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 203A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION MAIN SEWAGE TMT PLANT LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY I I MM/DD/YYYY No Discharge[K]

ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 101 011 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Coliform, fecal general MEASUREMENT 74055 1 1 PERMIT Effluent Gross REQUIREMENT SAMPLE BOD, carbonaceous, 05 day 20 C MEASUREMENT 80082 1 0 PERMIT Effluent Gross REQUIREMENT J certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT MANAGER persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true. accurate.

and complete. I am aware that there are significant penalties for submitting false information.

A..J\ho 724 682-7773 12/ 28/ 2017 TYPED OR PRINTED including the possibihty of fine and imprisonment for knowing violations. S1GNA1rURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT AREA Code I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT OVERFLOW FROM THE CHLORINE CONTACT TANK PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 18 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004

. PA0025615 211A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 211 TURBINE BLDG LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MMIDD/YYYY I I MM/DD/YYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM! 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT t certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or superv1s1on in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT A1.AA.~

persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate. 724 682-7773 12/ 28/ 2017 MANAGER and complete. I am aware that there are significant penalties for submitting fatse information, SIGNI\TURE OF-PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREA Code I NUMBER MM/DDNYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 19 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 213A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 2 COOL TOWER PUMPHOUSE LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MM/DD/YYYY I I MM/DD/YYYY No Discharge[KJ ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROMI 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the lnformatlon submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT MANAGER persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. ram aware that there are significant penalties for submitting false information,

~o SIGNAllJRE OF PRINCIPAL EXECUTIVE OFFICER OR 724 682-7773 12/ 28/ 2017 TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT DISCHARGE FROM THE PUMP HOUSE PRIOR TO MIXING WITH ANY OTHER WATER. NOTE: THE MONITORING OF THIS DISCHARGE IS NOT REQUIRED WHEN EFFLUENT FROM UNIT NO. 2 COOLING TOWER PUMP HOUSE FLOOR & EQUIPMENT DRAINS IS BEING RECYCLED TO THE UNIT NO. 2 WATER RECIRCULATION SYSTEM.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 20 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 301A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 2 AUX BOILER SLOWDOWN LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MM/DDNYYY I I MM/DDNYYY I No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 I TO I 10/ 31/ 2016 I NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance wrth a system designed to assure that qualified personnel TELEPHONE DATE

~

properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directlY responsible for gathering the 724 682-7773 12/ 28/ 2017 information, the information submitted is, to the best of my knowledge and belief, true, accurate, MANAGER and complete. I am aware that !here are significant penalties for submitting false information, SIGNAiURE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT THE DISCHARGE OF BOILER BLOWN DOWN PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 21 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 303A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 1 OIL WATER SEPARATOR LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY I I MM/DDNYYY No Discharge[KJ ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE

~

properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 12/ 28/ 2017 information, the information submitted is, to the best of my knowledge and belief, true, accurate, MANAGER and complete. I am aware that there are significant penalties fer submitting false information, SIGN~TURE OF PRINCIPAL E?;ECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations AUTHORIZED AGENT AREACode I NUMBER MM/DDIYYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT THE OVERFLOW FROM THE OIL WATER SEPARATOR PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 22 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 313A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 313 TURBINE BLDG DRAIN LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MMIDDNYYY No DischargeD ATIN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 Effluent Gross I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervtsion in accordance with a system designed to assure that qualified personnel TELEPHONE DATE

~

properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the information, the mformat1on submitted is, to the best of my knowledge and belief, true, accurate, 724 682-7773 12/ 28/ 2017 MANAGER and complete. I am aware that there are significant penalties for submitting false Information.

SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT DISCHARGE FROM OWS #21 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 23 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 401A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION CHEM.FEED AREA OF AUX BOILERS LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DDNYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT

. Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the informaf1on submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT

~

persons who manage lhe system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief. true, accurate, 724 682-7773 12/ 28/ 2017 MANAGER and complete. I am aware that there are significant penalties for submitting false information, SIGNATtlRE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREA Code I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT CHEMICAL FEED AREA DRAINS PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 24 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 403A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION CONDENSATE SLOWDOWN & RIVR WAT LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY I I MM/DD/YYYY No Discharge[ZJ ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 011 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 005561 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Nitrogen, ammonia total (as N)

MEASUREMENT 00610 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE CLAMTROL CT-1, TOTAL WATER MEASUREMENT 04251 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted. Based on my inquiry of the person or

~~n John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 12/ 28/ 2017 information, the information submitted is, to the best of my knowledge and belief, true, accurate, MANAGER and complete. I am aware that there are significant penalties for submitting false information, SIGNATl!-RE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREACode I NUMBER MM/DDNYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35 MG/LAS A DAILY MAX.) SAMPLES SHALL BE TAKEN AT MP 403 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 25 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 403A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION CONDENSATE BLOWDOWN & RIVR WAT LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MM/DD/YYYY \ \ MM/DD/YYYY \

No Discharge[K]

ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 \ TO \ 10/ 31/ 2016 \

NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Hydrazine MEASUREMENT 81313 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE .DATE 1---___.;..c.cc.=..c;.;.;c;;;;..c..:.c~.c..:..=.c=c:c......c.--'-------ldirection or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or John J . Gra bna r, GEN ERA L p LA NT pe,soas who maaage the system. octho,e ,e..oas .,,e,uy ,.,,on,ibte 1or gathering the 724 682-7773 12/ 28/ 2017 information, the information submitted is, to the best of my knowledge and belief, true, accurate, 1-M_A_N_A_G_E_R______________--i~:C~u~~:pt!~:e~~s::il~t;:f\~=~~~~~:~~:;~:~ta:rpke;::i;~ :~~,:~i:~~~1ng false information, l-sii~~JRF:ni~iii"NiFii~~~iii'Tii;IVij:E'<O'iiF=i=FTIIC~E:i:R!IO~RR--j_------.-------_j~-----------l TYPED OR PRINTED AUTHORIZED AGENT AREA Code NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35 MG/L AS A DAILY MAX.) SAMPLES SHALL BE TAKEN AT MP 403 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01106) Page 2

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 26 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 413A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION BULK FUEL STORAGE DRAIN LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DD/YYYY No Discharge[XJ ATIN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared lmder my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision m accordance with a system designed to assure that qualified personnel TELEPHONE DATE

~

properly gather and evaluate the informaf1on submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief. true. accurate, 724 682-7773 12/ 28/ 2017 MANAGER and complete. J am aware that there are significant penalties for submitting false information.

TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT DISCHARGE FROM OWS #24 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 27 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 501A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 1 GENRTR BLWDWN FILT BW LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDIYYYY MM/DDNYYY ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER No Discharge[ZJ FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE

~

properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 12/ 28/ 2017 information, the information submitted is, to the best cf my knowledge and belief, true, accurate, MANAGER and complete. I am aware that there are significant penalties for submitting false information.

SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT INTERNAL MP 501 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 001A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNITS 1&2 COOLG. TOWER BLWDN LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MM/DDNYYY I I MM/DD/YYYY I No DischargeD ATIN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 101 011 2016 I TO I 101 31/ 2016 I NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE GRAB pH N/A 8.1 MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Nitrogen, ammonia total (as N)

MEASUREMENT 00610 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE CLAMTROL CT-1, TOTAL WATER MEASUREMENT 04251 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free available MEASUREMENT 50064 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Hydrazine MEASUREMENT 81313 1 0 PERMIT Effluent Gross REQUIREMENT 1 certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER TELEPHONE DATE

~~o direction or supervision In accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the information, the mformat1on submitted 1s. to the best of my knowledge and belief, true, accurate, 724 682-7773 12/ 28/ 2017 MANAGER and complete. I am aware that there are significant penalties for submitting false information, SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREACode I NUMBER MM/DDNYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

HYDRAZINE / AMMONIA MONITORING APPLY DURING PERIODS OF WET LA YUP. REPORT DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING. THE LIMIT IS 35 MG/LAS A DAILY MAX.

10/27/16-10/31/16 Twice daily grab samples for FAC were subsitiuted for continuous monitoring due to the unavailability of the monitor.

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) OM B No. 2040-0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 2 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 002A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION INTAKE SCREEN BACKWASH LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MM/DDNYYY I I MM/DDNYYY No DischargeD ATIN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROMI 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Flow, in conduit or thru treatment plant 0.006 0.046 MGD N/A N/A N/A N/A 1 / 7 EST MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT MANAGER persons who manage the system, or those persons direclly responsible for gathering lhe information, lhe information submitted is, to the best of my knowledge and belief, true. accurate, and complete. I am aware Iha! there are significant penalties for submitting false information, AJl-1\AJl 724 682-7773 12/ 28/ 2017 TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations. SIGM\TURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT AREACode I NUMBER MMIDD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 3 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 003A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 003 LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DischargeD ATIN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Flow, in conduit or thru treatment plant 0.170 1.054 MGD NIA N/A N/A N/A 29 I 31 EST MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT l certify under penally of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed lo assure that qualified personnel TELEPHONE DATE A~AO_

properly gather and evaluate the informaf1on submitted_ Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is. to the best of my knowledge and belief, true, accurate.

724 682-7773 12/ 28/ 2017 MANAGER and complete. I am aware that there are significant penalties for submitting false information, SIGNA"'-'RE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

THE FLOWS FOR OUTFALLS 103,203, 303, AND 403 ARE TO BE TOTALED AND REPORTED AS THE 003 FLOW.

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 4 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 004A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT ONE COOLG TOWER OVERFLOW LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, iotal residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free available MEASUREMENT 500641 0 PERMIT Effluent Gross REQUIREMENT TELEPHONE DATE TYPED OR PRINTED AREA Code NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Fonn 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 5 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 006A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION AUX. INTAKE SCREEN BACKWASH LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Flow, in conduit or thru treatment plant 0.002 0.016 MGD N/A N/A NIA N/A 1 / 7 EST MEASUREMENT 50050 1 0 PERMIT

.Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE A~

properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT MANAGER persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best ol my knowledge and be!ief. true, accurate, and complete. 1am aware that there are significant penalties for submitting false information, 0 724 682-7773 12/ 28/ 2017 TYPED OR PRINTED including the possibihty of fine and imprisonment for knowing violations. SIGN\TURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT AREA Code I NUMBER MM/DD/YYYY COMMENTS ANO EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Fann 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 6 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 007A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION AUX. INTAKE SYSTEM LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DischargeOO ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free available MEASUREMENT 50064 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE t - - - - - - - - - - - - - - - - - - - - - - < d i r e c t i o n or supervision in accordance with a system designed lo assure that qualified personnel property gather and evaluate the information submitted. Based on my inquiry of lhe person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 12/ 28/ 2017 information, the information submitted is. to the best of my knowledge and belief, true. accurate, MANAGER and complete. I am aware that there are significant penalties for submitting false information, t - - - - - - - - - - - - - - - - - - - - - - l i n c l u d i n g t h e p o s s 1 b i l ! t y oflme and imprisonment for knowing violations TYPED OR PRINTED AUTHORIZED AGENT AREA Code NUMBER MM/DDNYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

MONITORING FOR FLOW, FREE AVAILABLE CHLORINE, AND TOTAL RESIDUAL CHLORINE ARE REQUIRED ONLY DURING THOSE PERIODS OF DISCHARGE FROM THE ALTERNATE FLOW PATH OF THE REACTOR PLANT RIVER WATER SYSTEM.

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 7 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 008A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 1 COOLING TOWER PUMPHOUSE LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM MM/DD/YYYY 10/ 01/ 2016 TO MM/DD/YYYY 10/ 31/ 2016 No Discharge [KJ NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE f------------C-----'------'---~ direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathermg the 724 682-7773 12/ 28/ 2017 information. the information submitted is, to the best of my knowledge and behef, true, accurate, MANAGER and complete ram aware that there are significant penalties for submitting false information, 1 - - - - - - - - - - - - - - - - - - - - - ~ m d u d i n g the possibility of fine and imprisonment for knowing violations.

AREA Code NUMBER MM/DD/YYYY TYPED OR PRINTED AUTHORIZED AGENT COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Form 3320-1 (rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 8 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 010A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 2 COOLING WATER LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM MM/DD/YYYY 10/ 01/ 2016 MONITORING PERIOD TO MM/DD/YYYY 10/ 31/ 2016 No Discharge D NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE CLAMTROL CT-1, TOTAL WATER MEASUREMENT 04251 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, free available MEASUREMENT 50064 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - - - - - - - - - - - - - , d i r e c t i o n or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, 724 682-7773 12/ 28/ 2017 MANAGER and complete. I am aware that there are significant penalties for submitting false information, I---L-4fo""'-=:........:11-=-~----------I 1 - - - - - - - - - - - - - - - - - - - - - - - - i i n c l u d i n g the possibility of fine and imprisonment for knowing violations. 1------,---------;------------i TYPED OR PRINTED AUTHORIZED AGENT AREA Code NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35 MGIL AS A DAILY MAX)

Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 9 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 011A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION DIESEL GEN & TURBINE DRAINS LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MMIDDNYYY MM/DDNYYY ATTN: JOHN J GRABNARIGENERAL PLANT MANAGER FROM No DischargeD 101 011 2016 TO 101 311 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Flow, in conduit or thru treatment plant 0.004 0.004 MGD NIA NIA NIA NIA 1 I 7 EST MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - - - - - - - - - - - - t d i r e c t i o n or supervision fn accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 12/ 28/ 2017 information. the information submitted is, lo the best of my knowledge and belief. true, accurate, MANAGER and complete. I am aware that there are significant penalties for submitting false information.

1 - - - - - - - - - - - - - - - - - - - - - l i n c l u d i n g the possibility of fine and imprisonment for knowing violations. IVE OFFICER OR TYPED OR PRINTED AUTHORIZED AGENT AREA Code NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARG.E MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 10 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 012A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION SLOWDOWN FROM THE HVAC UNIT LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DDNYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH NIA 8.5 2 I 31 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Copper, total (as Cu)

MEASUREMENT 01042 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Zinc, total (as Zn)

MEASUREMENT 01092 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total dissolved MEASUREMENT 70295 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE Ju..AAn properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 12/ 28/ 2017 information, the information submitted is, to the best of my knowledge and belief, true, accurate, MANAGER and complete. I am aware that there are significant penalties for submitting false information, SIGNAT~RE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 11 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 013A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION OUTFALL 013 LOCATION: PA ROUTE 168 External Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DDNYYY No DischargeD ATIN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A 7.1 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Cyanide, total (as CN)

MEASUREMENT 00720 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Copper, total (as Cu)

MEASUREMENT 01042 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorobenzene MEASUREMENT 34301 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 Effluent Gross I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT MANAGER persons who manage the system, or those persons directly responsible for gathering the information. the information submitted is. to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, A..-e~O-SIGNM'URE OF PRINCIPAL EXECUTIVE OFFICER OR 724 682-7773 12/ 28/ 2017 TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

THERE SHALL BE NO DISCHARGE OF FLOATING SOLIDS OR VISIBLE FOAM IN OTHER THAN TRACE AMOUNTS.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 12 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 101A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 101 CHEMICAL WASTE TREATMENT LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY I I MM/DDNYYY No Discharge[KJ ATIN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Nitrogen, ammonia total (as N)

MEASUREMENT 0061010 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT ,;

SAMPLE Hydrazine MEASUREMENT 8131310 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER J certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - - - - - - - - - - - - - l d i r e c t i o n or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the information. the mformation submitted is, to the best of my knowledge and belief. true, accurate. 724 682-7773 12/ 28/ 2017 MANAGER and complete. Jam aware that there are significant penalties for submitting false informa11on, 1--4--'1""---'-----=::c_--------l 1 - - - - - - - - - - - - - - - - - - - - - - - < i n c l u d i n g the possibility of fine and imprisonment for knowing violations. I-----~-------+-----------<

TYPED OR PRINTED AUTHORIZED AGENT AREA Code NUMBER MMIDD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. SAMPLES SHALL BE TAKEN AT THE DISCHARGE FROM THE CHEMICAL WASTE SUMP PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form. Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 13 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 102A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 102 INTAKE SCREEN HOUSE LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DD/YYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION EX OF ANALYSIS TYPE PARAMETER VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A 7.9 2 / 31 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the

~Q_ 724 682-7773 12/ 28/ 2017 MANAGER information, the information submitted is, to !he best of my knowledge and belief, true. accurate.

and complete. I am aware !hat there are significant penalties for submitting false information. -

TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations. SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT THE DISCHARGE OF COLLECTED PUMP BEARING LEAKAGE PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 14 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 103A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION SLUDGE SETILING BASIN LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DischargeD ATIN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH 2 I 31 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the mformaf1on subm"1tted. Based on my inquky of the person or John J. Grabnar, GENERAL PLANT

~

persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, 724 682-7773 12/ 28/ 2017 MANAGER and complete. 1 am aware that there are significant penalties for submitting false information, SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREA Code I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT THE OVERFLOW FROM THE BASIN PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 15 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 111A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 111 DIESEL GENERATOR BLDG LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DD/YYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed lo assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT MANAGER persons who manage the system, or those persons directly responsible for gathering the information. the information submitted is, to the best of my knowledge and belief, true. accurate, and complete. I am aware that there are significant penalties for submitting false information,

~AO SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR 724 682-7773 12/ 28/ 2017 TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Form 3320-1 {Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 16 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 113A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT. PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 2 SEWAGE TMT PLANT LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MMIDDNYYY I I MM/DDNYYY No Discharge[XJ ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 I TO I 101 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Coliform, fecal general MEASUREMENT 74055 1 1 PERMIT Effluent Gross REQUIREMENT SAMPLE BOD, carbonaceous, 05 day 20 C MEASUREMENT 80082 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted. Based on my inquiry of lhe person or John J. Grabnar, GENERAL PLANT MANAGER persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief. true, accurate.

and complete. I am aware that there are significant penalties for submitting false information, including the possibility of f,ne and imprisonment for knowing violations Iv-AA {)

SIGNA'l'URE OF PRINCIPAL EXECOTIVE OFFICER OR 724 AREA Code I 682-7773 NUMBER 12/ 28/ 2017 MM/DD/YYYY TYPED OR PRINTED AUTHORIZED AGENT COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT OVERFLOW FROM THE CHLORINE CONTACT TANK PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 17 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 203A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION MAIN SEWAGE TMT PLANT LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MM/DD/YYYY I I MM/DD/YYYY I No Discharge[XJ ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 I TO I 10/ 31/ 2016 I NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS pH 00400 1 0 Effluent Gross SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Coliform, fecal general MEASUREMENT 74055 1 1 PERMIT Effluent Gross REQUIREMENT SAMPLE BOD, carbonaceous, 05 day 20 C MEASUREMENT 80082 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - ' - - - - - - - - - - - - - i d i r e c t i o n or supervision in accordance with a system designed lo assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or John J . G rabna r, GENERAL p LANT pe,sons who manage the system. or those pe,sons directly respoosible ror gathering the 724 682-7773 12/ 28/ 2017 information, the Information submitted is, to the best of my knowledge and belief. true, accurate.

MANAGER and complete. I am aware that there are significant penalties for submitting false information, 1 - - - - - - - - - - - - - - - - - - - - - - i i n c l u d i n g t h e possibility of fine and Imprisonment for knowing violations.

TYPED OR PRINTED AUTHORIZED AGENT AREA Code NUMBER MM/DDNYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT OVERFLOW FROM THE CHLORINE CONTACT TANK PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Fann 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 18 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 211A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 211 TURBINE BLDG LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH 7.7 SU 1 / 7 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate lhe information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the MANAGER information, the information submitted is. to the best of my knowledge and belief, true, accurate.

and complete. 1 am aware that there are significant penalties for submit1ing false information, A. J.../\A!J 724 682-7773 12/ 28/ 2017 TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations. SIG°NI\TURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT AREA Code I NUMBER MM/DDNYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 19 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 213A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 2 COOL TOWER PUMPHOUSE LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MM/DDNYYY I I MM/DDNYYY No Discharge[XJ ATTN: JOHN J GRABNARIGENERAL PLANT MANAGER FROM! 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penally of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the MANAGER Information, the information submitted is, lo the best of my knowledge and belief. true, accurate.

and complete. I am aware Iha! there are significant penalties for submitting false information,

~Q 724 682-7773 12/ 28/ 2017 SIGNAlllRE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations.

AUTHORIZED AGENT AREA Code I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT DISCHARGE FROM THE PUMP HOUSE PRIOR TO MIXING WITH ANY OTHER WATER. NOTE: THE MONITORING OF THIS DISCHARGE IS NOT REQUIRED WHEN EFFLUENT FROM UNIT NO. 2 COOLING TOWER PUMP HOUSE FLOOR & EQUIPMENT DRAINS IS BEING RECYCLED TO THE UNIT NO. 2 WATER RECIRCULATION SYSTEM.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 20 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 301A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 2 AUX BOILER SLOWDOWN LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY I I MM/DD/YYYY No DischargeD ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 101 011 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Solids, total suspended <4 <4 2 I 31 GRAB MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT ~ .,, . Req::Mon:~

Effluent Gross REQUIREMENT i\: ~d,,t'\)~ff? *::*--oAmY: Mx:i:

I certify under penalty of !aw that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that quahf1ed personnel TELEPHONE DATE

~

properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 12/ 28/ 2017 information, the information submitted is, to the best of my knowledge and belief. true, accurate, MANAGER and complete. I am aware that there are significant penalties for submitting false information, SIGNAi"URE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations AUTHORIZED AGENT AREA Code I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT THE DISCHARGE OF BOILER BLOWN DOWN PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Farm Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 21 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 303A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 1 OIL WATER SEPARATOR LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MM/DD/YYYY I I MM/DD/YYYY No Discharge[ZJ ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM! 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or ttiru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that quahfied personnel TELEPHONE DATE

~

properly gather and evaluate the information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 12/ 28/ 2017 inlormation, the information submitted is, to the best of my knowledge and belief, true, accurate, MANAGER and complete I am aware that there are significant penalties fer submitting false information, including the possibility of fine and imprisonment !or knowing violations. SIGNATURE OF PRINCIPAL c~CUTIVE OFFICER OR TYPED OR PRINTED AUTHORIZED AGENT AREA Code j NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT THE OVERFLOW FROM THE OIL WATER SEPARATOR PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMIITEE NAME/ADDRESS (include Facility Name/Location if Different) Page 22 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 313A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION 313 TURBINE BLDG DRAIN LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY MM/DDNYYY No DischargeD AITN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH N/A 7.1 1 / 7 GRAB MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I cert1f)' under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE

~

properly gather and evaluate !he information submitted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 12/ 28/ 2017 information, the lnformat1on submitted is, to the best of my knowledge and belief, true, accurate.

MANAGER and complete. I am aware that there are significant penalties for submitting false information, TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations. SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT DISCHARGE FROM OWS #21 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITIEE NAME/ADDRESS (include Facility Name/Location if Different) Page 23 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 401A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION CHEM.FEED AREA OF AUX BOILERS LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No DischargeD ATIN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted. Based on my inquiry of the person or

~

John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the -

information, the information submitted is, to the best of my knowledge and belief. true, accurate, 724 682-7773 12/ 28/ 2017 MANAGER and complete. I am aware that there are significant penalties for submitting false information, TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations. SIGNATtlRE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT AREACode I NUMBER MM/DDNYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT CHEMICAL FEED AREA DRAINS PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 24 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 403A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION CONDENSATE BLOWDOWN & RIVR WAT LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DDNYYY I I MM/DD/YYYY No Discharge[XJ ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 011 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Nitrogen, ammonia total (as N)

MEASUREMENT 00610 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE CLAMTROL CT-1, TOTAL WATER MEASUREMENT 04251 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Chlorine, total residual MEASUREMENT 50060 1 0 PERMIT Effluent Gross REQUIREMENT 1 certify under penalty ol law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that qualified personnel TELEPHONE DATE properly gather and evaluate the information submitted. Based on my inquiry of the person or

~

John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the 724 682-7773 12/ 28/ 2017 information, the information submitted is, to the best or my knowledge and belief, true, accurate.

MANAGER and complete. I am aware that there are significant penalties for submitting false rnformation.

TYPED OR PRINTED including the possibility of fine and imprisonment for knowing violations SIGNAT~RE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT AREA Code I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35 MG/LAS A DAILY MAX.) SAMPLES SHALL BE TAKEN AT MP 403 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 25 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 403A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION CONDENSATE SLOWDOWN & RIVR WAT LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY I I MM/DD/YYYY No Discharge[XJ ATIN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Hydrazine MEASUREMENT 813131 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all atta"chments were prepared under my TELEPHONE .DATE l-------'=.:=;.;..;..:=.;....;.;;c..:..c.;.;....;..=.c=;._:c...;.c.;_;;::_:..c...:._;_;_:::c..:..._----1 direction or supervision in accordance with a system designed lo assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or John J . Grab na r, GEN ERA L p LA NT pe,sons who manage the system, or those pe,son, d"ec11y ,,,,onsibte ro, gathering the 724 682-7773 12/ 28/ 2017 information, the information submitted Is, to the best of my knowledge and belief, true, accurate, MANAGER and complete. I am aware that there are significant penalties for submitting false information, f---===~=:-=e!-=:=:-=::~-==:=:c=::::-::-::=c=::--J t - - - - - - - - - - - - - - - - - - - - - t i n c l u d i n g t h e possibility of fine and imprisonment for knowing violations. TIVE OFFICER OR l------~-------+------------1 TYPED OR PRINTED AUTHORIZED AGENT AREA Code NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

HYDRAZINE AND AMMONIA MONITORING TO APPLY DURING PERIODS OF WET LAYUP. REPORT THE DAILY MAXIMUM FOR BETZ DT-1 WHEN DISCHARGING (24 HR. COMP.): MG/L. (THE LIMIT IS 35 MG/L AS A DAILY MAX.) SAMPLES SHALL BE TAKEN AT MP 403 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 2

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 26 NAME:. FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 413A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION BULK FUEL STORAGE DRAIN LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD MM/DD/YYYY MM/DD/YYYY No Discharge[KJ ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROM 10/ 01/ 2016 TO 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE pH MEASUREMENT 00400 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Oil & grease MEASUREMENT 00556 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I certify under penalty of law that this document and all attachments were prepared under my TELEPHONE DATE 1 - - - - - - - - - - - - - - - - - - - - - - < d i r e c t i o n or supervision in accordance with a system designed to assu1e that quahf1ed personnel properly gather and evaluate the information subm*1tted. Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT pe,sonswho m,n,gethe system. orthosepecsons directly rnsponsible '" 9,th"in9 the 724 682-7773 12/ 28/ 2017 information, the information submitted is, to the best of my knowledge and beJ1ef, true. accurate, t-M_A_N_A_G_E_R______________----1~n"c~u~~:pi':!\0 1s:;j1~t;:tri~:~~de:~:~:~~~~~t:rpk:n0~ii~~ :~:,:~~;~~ting ra1se information. t-sii~~iRF'Dl~iwii~~7i:"EcmiVE"oi'FK:"FJ;i"niRi-------.--------1------------l TYPED OR PRINTED AUTHORIZED AGENT AREA Code NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT DISCHARGE FROM OWS #24 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) Form Approved DISCHARGE MONITORING REPORT (DMR) 0MB No. 2040-0004 PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) Page 27 NAME: FIRST ENERGY NUCLEAR OPERATING DMR MAILING ZIP CODE: 150770004 PA0025615 501A ADDRESS: PA ROUTE 168 MAJOR SHIPPINGPORT, PA 150770004 PERMIT NUMBER DISCHARGE NUMBER (SUBR05)

FACILITY: BEAVER VALLEY POWER STATION UNIT 1 GENRTR BLWDWN FIL T BW LOCATION: PA ROUTE 168 Internal Outfall SHIPPINGPORT, PA 150770004 MONITORING PERIOD I MM/DD/YYYY I I MM/DDNYYY No Discharge[ZJ ATTN: JOHN J GRABNAR/GENERAL PLANT MANAGER FROMI 10/ 01/ 2016 I TO I 10/ 31/ 2016 NO. FREQUENCY SAMPLE QUANTITY OR LOADING QUALITY OR CONCENTRATION PARAMETER EX OF ANALYSIS TYPE VALUE VALUE UNITS VALUE VALUE VALUE UNITS SAMPLE Solids, total suspended MEASUREMENT 00530 1 0 PERMIT Effluent Gross REQUIREMENT SAMPLE Flow, in conduit or thru treatment plant MEASUREMENT 50050 1 0 PERMIT Effluent Gross REQUIREMENT I certify under penalty of law that this document and all attachments were prepared under my NAME/TITLE PRINCIPAL EXECUTIVE OFFICER direction or supervision in accordance with a system designed to assure that quallffed personnel TELEPHONE DATE

/\-uvu2.__

properly gather and evaluate the information submitted Based on my inquiry of the person or John J. Grabnar, GENERAL PLANT persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best cf my knowledge and belief, true, accurate, 724 682-7773 12/ 28/ 2017 MANAGER and complete. I am aware that there are significant penalties for submitting false information, SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR TYPED OR PRINTED including the possibility of fme and imprisonment for knowing violations AUTHORIZED AGENT AREACode I NUMBER MM/DD/YYYY COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)

SAMPLES SHALL BE TAKEN AT INTERNAL MP 501 PRIOR TO MIXING WITH ANY OTHER WATER.

Computer Generated Version of EPA Form 3320-1 (Rev. 01/06) Page 1