L-16-217, Submittal of Revision 47 to Emergency Plan

From kanterella
Jump to navigation Jump to search
Submittal of Revision 47 to Emergency Plan
ML16203A182
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/12/2016
From: Hamilton D
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16207A312 List:
References
L-16-217
Download: ML16203A182 (2)


Text

FENOC' Perry Nuclear Power Plant P.O. Box 97 10 Center Road Perry, Ohio 44081 RrstEnergy Nuclear Operating Company David B. Hamilton 440-280-5382 Vice President July 12, 2016 10CFR50.4,10CFR50.54(q),1 OCFR72.44(f)

L-16-217 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001 Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58

.EMERGENCY PLAN FOR PERRY NUCLEAR POWER PLANT DOCKET No's. 50-440 Pursuant to 10CFR50.4, enclosed is EP-0000 Rev. 47 to the Emergency Plan for the Perry Nuclear Power Plant (PNPP). This revision constitutes a reissue of the entire document. Please follow the updating instructions per the attached Controlled Document Instruction Sheet, and return the signed Acknowledgment of Receipt form.

The changes have been reviewed in accordance with 10CFR50.54 (q), and it has been determined that the changes do not result in a reduction of the effectiveness of the Emergency Plan. It has also been determined that the Plan, as changed, continues to meet the standards of 10CFR50.47 (b) and 10CFR50 Appendix E.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Rick O'Connor, Manager, Emergency Response Section, at (440) 280-5693.

Sincerely, David Hamilton

Enclosures:

A. Emergency Plan, Rev. 4 7 B. Acknowledgement of Receipt C. Summary of Changes

Perry Nuclear Power Plant L-16-217 Page2 cc: United States Regulatory Commission ,

United States Nuclear Regulatory Commission Document Control Desk U.S. Nuclear Regulatory Commission NRC Project Manager Village of Perry - Vicky Stevens Mayor Perry Township Board of Trustees, Rick Amos - Chairman Village of North Perry, Mayor Ed Klco Perry Joint Fire District, Mr. James McDonald, Fire Chief Lake West Hospital, Mr. Ken Winter EP Coordinator Lake County Emergency Management Agency, Mr. Larry Greene, Director Geauga County Emergency Services, Mr. Dale Wedge, Director Ashtabula County Emergency Management Agency, Mr. Mike Fitchet, Director Ohio Emergency Management Agency, Ms. Dragani Ohio Department of Health, Pamela Hintz, Health Physicist United States Environmental Protection Agency, Mr. Steve Ostrodka, Chief Tri Point Medical Center, Mr.Ken Winter EP Coordinator ,

Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety And Safeguards NRC Regional Response Center