MONTHYEARL-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-23-085, 1 to Emergency Plan2023-03-10010 March 2023 1 to Emergency Plan L-22-271, Emergency Plan2022-12-20020 December 2022 Emergency Plan L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 222022-11-18018 November 2022 Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 L-20-129, Emergency Plan Amendment Request2020-12-28028 December 2020 Emergency Plan Amendment Request L-19-234, Transmittal of Emergency Plan, Revision 542019-10-0909 October 2019 Transmittal of Emergency Plan, Revision 54 L-19-168, Enclosure - Perry Nuclear Power Plant EP0000 Revision 53 Change Summary and Emergency Plan, Rev. 532019-07-0101 July 2019 Enclosure - Perry Nuclear Power Plant EP0000 Revision 53 Change Summary and Emergency Plan, Rev. 53 L-18-168, Emergency Plan Amendment Request2018-11-28028 November 2018 Emergency Plan Amendment Request ML18022A2922018-01-0505 January 2018 Emergency Plan Summary of Changes, Revision 52 ML17216A0402017-07-19019 July 2017 Emergency Plan Summary of Changes, Revision 51 L-16-276, Submittal of Revision 48 to Emergency Plan2016-09-16016 September 2016 Submittal of Revision 48 to Emergency Plan ML16274A0622016-09-16016 September 2016 Revision 48 to Emergency Plan ML16207A3112016-07-12012 July 2016 Revision 47 to Emergency Plan L-16-217, Submittal of Revision 47 to Emergency Plan2016-07-12012 July 2016 Submittal of Revision 47 to Emergency Plan ML15316A5082015-10-29029 October 2015 Request for Licensing Action to Revise the Emergency Plan ML15316A5112015-02-18018 February 2015 Calculation EP-EALCALC-PNPP-1401, Rev. 0, Perry Nuclear Power Plant - Radiological Effluent EAL Values. ML15316A5122014-12-0505 December 2014 Calculation EP-EALCALC-PNPP-1402, Rev. 0, Perry Nuclear Power Plant - Containment Radiation EAL Values. ML15316A5142014-01-17017 January 2014 Calculation PRDC-0014, Rev. 5, Division 1, 125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation. ML15316A5132011-09-15015 September 2011 Calculation PRDC-0015, Rev. 2, Addendum A03, Division 2,125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation. L-15-257, Calculation PRDC-0015, Rev. 2, Addendum A02, Division 2,125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation.2008-08-0808 August 2008 Calculation PRDC-0015, Rev. 2, Addendum A02, Division 2,125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation. ML15316A5162008-07-22022 July 2008 Calculation PRDC-0015, Rev. 2, Addendum A01, Division 2,125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation. ML15316A5152008-03-26026 March 2008 Calculation PRDC-0015, Rev. 2, Division 2,125 Vdc System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation. ML0531104272004-12-0808 December 2004 Enclosure B, Section 6.0, Emergency Measures, of the Perry Emergency Plan, Page 6-3 of the Perry Evacuation Time Estimate Study Perry Operations Manual Emergency Plan Implementing Instruction, Protective Actions & Guides, Dated December 8, ML0409805002004-03-30030 March 2004 Plan - Emergency Plan Changes, Revision 19 2024-05-06
[Table view] |
Text
Enclosure L-17-232 Summary of Changes
ENCLOSURE Perry Nuclear Power Plant EP 0000 Revision 51 Change Summary Revision 51 of the Emergency Plan for Perry Nuclear Power Plant Docket Nos. 50-440 contained the following changes.
Several changes were made to the Emergency Plan to replace the obsolete seismic monitoring system with a new state of the art seismic monitoring system. These changes were evaluated in 10CFR50.54(q) PY-2017-014-00 and found to be compliant with 10CFR50.47(b) and 10CFR50, Appendix E.
Step 7.5.5 2nd paragraph was revised to incorporate the use of digitized time stamped information stored at each monitors location each monitor will trip an annunciator in the Control Room if an Operating Basis Earthquake (QBE) seismic signal is detected. Upon receiving a signal, the plant operators will verify that the plant is still in a safe operating condition, or take steps to return the plant to a safe condition.
Brief replacement system description:
The replacement system is a completely active system which utilizes six (6) new, Bartec'-Syscom, MS2008+ Microelectromechanical Systems (MEMS) Triaxial Accelerometers and six (6) new, Bartec-Syscom, MR2002-SM24-K Strong Motion Recorders. Accelerometers and recorders are to detect and record seismic activity in the following locations:
- Unit 1 Reactor Building foundation (Intermediate Building elevation 574')
- Two (2) non-foundation elevations (644' and 664') of Unit 1 Reactor Building mounted on the Reactor Building internal structure
- An independent seismic cat. 1 structure foundation (Intermediate Building elevation 574')
- A non-foundation elevation of an independent seismic cat. 1 structure (Intermediate Building elevation 599')
- One (1) free field location away from the structures near the microwave tower The new system has the same range and sensitivity, same power supply, set points of the monitors are equivalent to an QBE, and is more accurate and more reliable.