L-14-188, Response to NRC Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
Response to NRC Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations
ML14160A700
Person / Time
Site: Beaver Valley
Issue date: 06/05/2014
From: Emily Larson
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-14-188, RIS-14-005
Download: ML14160A700 (2)


Text

FENOC -- I

  • V Beaver Valley Power Station P.O. Box 4 FirstEnergyNuclear OperatingCompany Shippingport, PA 15077 Eric A. Larson 724-682-5234 Site Vice President Fax: 724-643-8069 June 5, 2014 L-14-188 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Response to NRC Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations The purpose of this letter is to provide the NRC with a response to NRC Regulatory Issue Summary (RIS) 2014-05 for Beaver Valley Power Station Unit No. 1 and Unit No. 2. The RIS requested licensees to voluntarily submit a response using NRC Form 536 to provide data for scheduling and preparation of operator licensing examinations. Attached is the completed NRC Form 536, which addresses our proposed operator licensing examination schedule for calendar years 2016 through 2019.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. William C. Cothen, Manager, Regulatory Compliance at 724-682-4284.

Sincerely, Eric A. Larson Attachment cc: Mr. W. M. Dean, NRC Region I Administrator Mr. J. C. Nance, NRC Acting Senior Resident Inspector Mr. J. A. Whited, NRR Project Manager Mr. D. E. Jackson, Chief, Operations Branch, Division of Reactor Safety 00`3

..---~- 4 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES:O 9/30/2014 (9-2011) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIAiPrivacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by EXAMINATION DATA internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY Beaver Valley Power Stations Unit 1 (BVPS-1) and Unit 2 (BVPS-2). Information provided for year NRC REGION 1 2016 and 2018 is for BVPS-1. Information provided for year 2017 and 2019 is for BVPS-2.

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2016 CY 2017 CY2018 CY 2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 FYAMINATINNR ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS I _I B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER

_________________________I CYInif

?1r 1

CY I2017 anNt0 CY_2D.1.

I Init 1 CYmmn,,;

2.1219 NUMBER OF REACTOR OPERATORS 14 12 12 12 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 6 6 6 6 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 2 2 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/3/16 10/9/2017 10/8/2018 10/7/2019 ALTERNATE DATE 10/10/16 10/16/2017 10/15/2018 10/14/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I

NRC FORM 536 (9-2011I) PRINTED ON RECYCLED PAPER