L-13-403, Physical Security Plan, Revision 17

From kanterella
Jump to navigation Jump to search
Physical Security Plan, Revision 17
ML14030A056
Person / Time
Site: Beaver Valley
Issue date: 01/23/2014
From: Emily Larson
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-13-403
Download: ML14030A056 (4)


Text

SAFEGUARDS INFORMATION Beaver Valley Power Station When Separated From Enclosure, P.O. Box 4 FirstEnergy Nuclear Operating Company Handle This Document As Decontrolled Shippingport, PA 15077 Eric A. Larson 724-682-5234 Site Vice President Fax: 724-643-8069 January 23, 2014 L-13-403 10 CFR 50.54(p)(2)

ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station Physical Security Plan (Revision 17)

This letter forwards Revision 17 of the Beaver Valley Power Station (BVPS) Physical Security Plan (PSP) which was effective on December 13, 2013, Attachment A provides a summary of the Revision 17 changes. The changes were reviewed and determined not to decrease the safeguards effectiveness of the.BVPS Physical Security Plan. Accordingly, these revisions are being submitted in accordance with 10 CFR 50.54(p)(2). .

The enclosed revision of the BVPS Physical Security Plan is Safeguards Information and must be withheld from public disclosure under the provisions of 10 CFR 73.21.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Daniel L. Craine, Manager-Site Protection, at (724) 682-7812.

Sincerely,

~0t--

Eric A. Larson Attachments:

A. Summary of BVPS Physical Security Plan, Revision 17 Changes SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled

SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled Beaver Valley Power Station, Unit Nos. 1 and 2 L-13-403 Page 2

Enclosure:

BVPS Physical Security Plan, Revision 17 Changes cc: NRC Region I Administrator NRC Resident Inspector (w/o enclosure)

NRR Project Manager (w/o enclosure)

Director BRP/DEP (w/o enclosure)

Site BRP/DEP Representative (w/o enclosure)

SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled

SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled ATTACHMENT A L-13-403 Summary of BVPS Physical Security Plan, Revision 17 Changes Page 1 of 1 The following summarizes the BVPS Physical Security Plan (PSP), Revision 17 Changes:

Revision 17 of the BVPS PSP includes revisions to Chapter 11, Physical Barriers, as well as Appendix C, BVPS Safeguards Contingency Plan to remove the size of the Barrier One Drop Arm Swing Gate Vehicle Barrier. The necessity of this change was in response to a corrective action to widen the entrance to the channeling barriers for safety reasons. Part of the process of widening the entrance to the channeling barriers included the purchase and installation of a longer Barrier One Drop Arm Swing Gate Vehicle Barrier.

Revision 17 of the BVPS PSP is being submitted utilizing the criteria described in NRC Generic Letter 95-08 and NEI 11-08, Guidance on Submitting Security Plan Changes. The 10 CFR 50.54(p) screening process determined that the Revision 17 changes do not decrease the effectiveness of the BVPS PSP.

SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled

SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled Enclosure L-1 3-403 BVPS Physical Security Plan, Revision 17 Changes SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled