L-13-125, Physical Security Plan (Revisions 13, 14 and 15)

From kanterella
(Redirected from L-13-125)
Jump to navigation Jump to search
Physical Security Plan (Revisions 13, 14 and 15)
ML13142A206
Person / Time
Site: Beaver Valley
Issue date: 05/16/2013
From: Emily Larson
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-13-125
Download: ML13142A206 (2)


Text

FENOC SAFEGUARDS INFORMATION Beaver Valley Power Station When Separated From Enclosure, P.O. Box 4 FirstEnergyNuclear OperatingCompany Shippingport,PA 15077 Handle This Document As Decontrolled Eric A. Larson 724-682-5234 Site Vice President Fax: 724-643-8069 May 16, 2013 L-13-125 10 CFR 50.54(p)(2)

ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station Physical Security Plan (Revisions 13, 14 and 15)

This letter forwards Revisions 13, 14 and 15 of the Beaver Valley Power Station (BVPS) Physical Security Plan (PSP) which were effective on March 21, April 2, and April 19, 2013, respectively. Attachment A provides a summary of the Revision 13 changes. Attachment B provides a summary of Revision 14 changes. Attachment C provides a summary of Revision 15 changes. The changes were reviewed and determined not to decrease the safeguards effectiveness of the BVPS Physical Security Plan. Accordingly, these revisions are being submitted in accordance with 10 CFR 50.54(p)(2).

The enclosed revisions of the BVPS Physical Security Plan are Safeguards Information and must be withheld from public disclosure under the provisions of 10 CFR 73.21.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Daniel L. Craine, Manager -

Site Protection, at (724) 682-7812.

_]M1jj 4joyr-i, &~-

SAFEGUARDS INFORMATION When Separated From Enclosure, S 0-(::) 1 Handle This Document As Decontrolled Li a((

SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled Beaver Valley Power Station, Unit Nos. 1 and 2 L-13-125 Page 2 Attachments:

A. Summary of BVPS Physical Security Plan, Revision 13 Changes B. Summary of BVPS Physical Security Plan, Revision 14 Changes C. Summary of BVPS Physical Security Plan, Revision 15 Changes

Enclosures:

BVPS Physical Security Plan, Revision 13 Changes BVPS Physical Security Plan, Revision 14 Changes BVPS Physical Security Plan, Revision 15 Changes cc: NRC Region I Administrator NRC Resident Inspector (w/o enclosure)

NRR Project Manager (w/o enclosure)

Director BRP/DEP (w/o enclosure)

Site BRP/DEP Representative (w/o enclosure)

SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled