L-11-346, 10 CFR 50.55a Request Regarding Motor Operated Valve Testing

From kanterella
Jump to navigation Jump to search

10 CFR 50.55a Request Regarding Motor Operated Valve Testing
ML113360483
Person / Time
Site: Beaver Valley
Issue date: 12/02/2011
From: Harden P
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-11-346
Download: ML113360483 (12)


Text

Beaver Valley Power Station PO Box 4 FtotEnewNuclearOperaUngCompany Shlpplngport, PA' 15077 Paul A. Harden 724-682-5234 Site Vice President Fax: 724-643-8069 December 2, 2011 L-11-346 10 CFR 50.55a ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 10 CFR 50.55a Request Regarding Motor Operated Valve Testing Pursuant to 10 CFR 50.55a, FirstEnergy Nuclear Operating Company (FENOC) hereby requests Nuclear Regulatory Commission (NRC) approval of Valve Relief Request VRR1, Revision 1 for the Beaver Valley Power Station, Unit No.1 (BVPS-1) fourth interval Inservice Testing Program for Pumps and Valves (1ST Program) and the Beaver Valley Power Station, Unit No. 2 (BVPS-2) third interval 1ST Program. Request VRR1 is associated with testing of motor-operated valve assemblies included in the Beaver Valley Motor-Operated Valve Program and was previously authorized for BVPS-1 by NRC letter dated September 27, 2007 (Accession Number ML072420376) and for BVPS-2 by NRC letter dated February 14, 2008 (Accession Number ML080140299).

Revision 1 of VRR1 for both BVPS-1 and BVPS-2, specifies the version of Code Case OMN-1 to be implemented and provides a list that identifies affected motor-operated valve assemblies. In addition, wording is changed to make the text of VRR1, Revision 1, consistent for both BVPS-1 and BVPS-2, and includes additional applicable code requirements.

FENOC requests approval of VRR1, Revision 1, by December 15,2012. There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Supervisor - Fleet Licensing, at (330) 315-6808.

Paul A. Harden

Beaver Valley Power Station, Unit Nos. 1 and 2 L-11-346 Page 2

Enclosure:

Beaver Valley Power Station, Unit Nos. 1 and 2,10 CFR 50.55a Request Number: VRR1, Revision 1 cc: NRC Region I Administrator NRC Resident Inspector NRR Project Manager Director BRP/DEP Site BRP/DEP Representative

Beaver Valley Power Station, Unit Nos. 1 and 2 10 CFR 50.55a Request Number: VRR1, Revision 1 Proposed Alternative In Accordance with 10CFR50.55a(a)(3)(l)

Pagei of 10

-Alternative Provides An Acceptable Level Of Quality And Safety-ASME Code Motor-operated valve (MOV) assemblies included in the Beaver Valley Component(s) MOV Program and listed in the attached table.

Affected:

Applicable Code American Society of Mechanical Engineers (ASME) Operation and Edition and Maintenance (OM) Code-2001 Edition, with Addenda through OMb-Addenda: 2003.

Applicable Code ISTA-3130, "Application of Codes Cases," ISTA-3130(b) states that Requirements): Code Cases shall be applicable to the edition and addenda specified in the test plan.

ISTC-3100, "Preservice Testing," states in part that any valve that has undergone maintenance that could affect its performance after the preservice test shall be tested in accordance with ISTC-3310.

ISTC-3310, "Effects of Valve Repair, Replacement, or Maintenance on Reference Values," states in part that when a valve has been replaced, repaired, or has undergone maintenance that could affect the valve's performance, a new reference value shall be determined, or the previous reference value reconfirmed by an inservice test (1ST) run before the time it is returned to service.

ISTC-3510, "Exercising Test Frequency," states in part that active Category A, Category B, and Category C check valves shall be exercised nominally every 3 months.

ISTC-3520, "Exercising Requirements," ISTC-3521 states in part that active Category A and B valves shall be exercised during cold shutdowns if it is not practicable to exercise the valves at power, or that active Category A and B valves shall be exercised during refueling outages if it is not practicable to exercise the valves during cold shutdowns.

ISTC-3700, "Position Verification Testing," states in part that valves with remote position indicators shall be observed locally at least once every two years to verify that valve operation is accurately indicated.

ISTC-5120, "Motor-Operated Valves," ISTC-5121(a) states that active valves shall have their stroke times measured when exercised in accordance with ISTC-3500.

Reason for NUREG-1482, Revision 1, Section 4.2.5 states in part:

Request:

... As an alternative to MOV stroke-time testing, ASME developed Code Case OMN-1, "Alternative Rules for Preservice and Inservice Testing of Certain Electric

Beaver Valley Power Station, Unit Nos. 1 and 2 10 CFR 50.55a Request Number: VRR1, Revision 1 Page 2 of 10 Motor-Operated Valve Assemblies in LWR [Light Water Reactor] Power Plants," which provides periodic exercising and diagnostic testing for use in assessing the operational readiness of MOVs.,.

The following Nuclear Regulatory Commission (NRC) staff recommendation is also provided in Section 4.2.5:

The NRC staff recommends that licensees implement ASME Code Cases OMN-1 ... as accepted by the NRC (with certain conditions) in the regulations or [Regulatory Guide] RG 1.192, as alternatives to the stroke-time testing provisions in the ASME Code for applicable

[power operated valves] POVs.

Section 4.2.5 provides a basis for the recommendation that states in part:

RG 1.192 allows licensees with an applicable Code of record to implement ASME Code Case OMN-1 (in accordance with the provisions in the regulatory guide) as an alternative to the Code provisions for MOV stroke-time testing, without submitting request for relief from their code of record.... Licensees with a code of record that is not applicable to the acceptance of these Code Cases may submit a request for relief to apply those Code Cases consistent with indicated conditions to provide an acceptable level of quality and safety.

The Code of record for Beaver Valley Power Station, Unit No. 1 (BVPS-1) fourth 10-year inservice test interval, and Beaver Valley Power Station, Unit No. 2 (BVPS-2) third 10-year inservice test interval is ASME OM Code-2001 Edition through OMb-2003 Addenda and the applicable Code for OMN-1, as stated in RG 1.192, was only reaffirmed through the OMa-1999 Addenda.

Proposed Implement Code Case OMN-1 from the ASME OMb Code, 2006 Alternative and Addenda, in lieu of MOV stroke-time provisions specified in ISTC-5120, Basis for Use: preservice testing provisions of ISTC-3100, reference value provisions of ISTC-3310, exercising test frequency provisions of ISTC-3510, and exercising provisions of ISTC-3520. Code Case OMN-1 has been determined by the NRC to provide an acceptable level of quality and safety when implemented in conjunction with the conditions imposed in RG 1.192. Also, implement the provisions specified in ISTC-3700 in conjunction with the MOV diagnostic test frequency (specified in the 1ST Program Valve Tables) in lieu of the ISTC-3700 frequency of once every two years.

Using the provisions of this relief request as an alternative to MOV stroke-time testing provisions of ISTC-5120, preservice testing

Beaver Valley Power Station, Unit Nos. 1 and 2 10 CFR 50.55a Request Number: VRR1, Revision 1 Page 3 of 10 provisions of ISTC-3100, reference value provisions of ISTC-3310, exercising test frequency provisions of ISTC-3510, exercising provisions of ISTC-3520, and position verification frequency provisions of ISTC-3700, provides an acceptable level of quality for the determination of valve operational readiness. Code Case OMN-1 from the ASME OMb Code, 2006 Addenda, should be considered acceptable for use with ASME OM Code-2001 through OMb-2003 as the Code of record.

Duration of The proposed alternative identified in this relief request shall be utilized Proposed during the BVPS-1 fourth 10-year inservice test Interval, and BVPS-2 Alternative: third 10-year inservice test interval.

References:

NUREG-1482, Revision 1, Section 4.2.5, "Alternatives to Stroke-Time Testing."

Regulatory Guide 1.192, "Operation and Maintenance Code Case Acceptability, ASME OM Code," Table 2, "Conditionally Acceptable OM Code Cases."

Code Case OMN-1, "Alternative Rules for Preservice and Inservice Testing of Active Electric Motor-Operated Valve Assemblies in Light-Water Reactor Power Plants," from the ASME OMb Code, 2006 Addenda.

Beaver Valley Power Station, Unit Nos. 1 and 2 10 CFR 50.55a Request Number: VRR1, Revision 1 Page 4 of 10 BVPS-1 ASME Code Component(s) Affected Valve Number Description Class Category MOV-1RC-535 PORV PCV-1RC-455C BLOCK 1 B MOV-1RC-536 PORV PCV-1RC-456 BLOCK 1 B MOV-1RC-537 PORV PCV-1RC-455D BLOCK 1 B MOV-1CH-115B RWST TO CH PUMP SUCTION HEADER 2 A MOV-1CH-115C VCT TO CH PUMP SUCTION HEADER 2 B MOV-1CH-115D RWST TO CH PUMP SUCTION HEADER 2 A MOV-1CH-115E VCT TO CH PUMP SUCTION HEADER 2 B MOV-1CH-142 RHR LETDOWN ISOLATION 2 A MOV-1CH-289 CHARGING INLET ISOLATION 2 A MOV-1CH-308A RC PUMP A SW INLET ISOLATION 2 A MOV-1CH-308B RC PUMP B SW INLET ISOLATION 2 A MOV-1CH-308C RC PUMP C SW INLET ISOLATION 2 A MOV-1CH-310 REGEN HX DISCHARGE ISOLATION 1 B MOV-1CH-350 EMERGENCY BORATION ISOLATION 3 B MOV-1CH-378 RCP SW RETURN ISOLATION 2 A MOV-1CH-381 RCP SW RETURN ISOLATION 2 A MOV-1SI-836 RCL COLD LEG SUPPLY FROM CH PUMP 1 A MOV-1SI-842 1SI-TK-1A.B.C TEST RET TO RWST 2 A MOV-1SI-860A 1SI-P-1A SUCTION ISOLATION 2 A MOV-1SI-860B 1SI-P-1A SUCTION ISOLATION 2 A MOV-1SI-862A 1SI-P-1A RWST SUCTION ISOLATION 2 B MOV-1SI-862B 1SI-P-1B RWST SUCTION ISOLATION 2 B MOV-1SI-863A 1SI-P-1A TO CH PUMP SUCTION HEADER 2 B MOV-1SI-863B 1SI-P-1B TO CH PUMP SUCTION HEADER 2 B MOV-1SI-864A 1SI-P-1B INJ TO RCS COLD LEG 2 B MOV-1SI-864B 1SI-P-1A INJ TO RCS COLD LEG 2 B MOV-1SI-865A SI ACC 1A OUTLET TO RCS COLD LEG 2 B MOV-1SI-865B SI ACC 1B OUTLET TO RCS COLD LEG 2 B MOV-1SI-865C SI ACC 1C OUTLET TO RCS COLD LEG 2 B MOV-1SI-867A BORON INJ (1SI-TK-2) INLET ISOLATION 2 B MOV-1SI-867B BORON INJ (1SI-TK-2) INLET ISOLATION 2 MOV-1SI-867C BORON INJ (1SI-TK-2) INLET ISOLATION 1 A MOV-1SI-867D BORON INJ (1SI-TK-2) INLET ISOLATION 1 A MOV-1SI-885A 1SI-P-1A MINIFLOW ISOLATION 2 A

Beaver Valley Power Station, Unit Nos. 1 and 2 10 CFR 50.55a Request Number: VRR1, Revision 1 Page 5 of 10 BVPS-1 ASME Code Component(s) Affected Valve Number Description Class Category MOV-1SI-885B 1SI-P-1B MINIFLOWISOLATION 2 A MOV-1SI-885C 1SI-P-1B MINIFLOW ISOLATION 2 A MOV-1SI-885D 1SI-P-1A MINIFLOW ISOLATION 2 A MOV-1SI-890A 1A LHSI PUMP INJ TO RCS HOT LEGS 1 A MOV-1SI-890B 1B LHSI PUMP INJ TO RCS HOT LEGS 1 A MOV-1SI-890C LHSI PUMP INJ TO RCS COLD LEGS 1 A MOV-1QS-101A 1QS-P-1A DISCHARGE ISOLATION 2 A MOV-1QS-101B 1QS-P-1B DISCHARGE ISOLATION 2 A MOV-1QS-104A CHEM INJ PUMP4A DISCH ISOLATION 2 B MOV-1QS-104B CHEM INJ PUMP4B DISCH ISOLATION 2 B MOV-1RS-156A OUTSIDE 1RS-P-1A DISCH ISOLATION 2 B MOV-1RS-156B OUTSIDE 1RS-P-1B DISCH ISOLATION 2 B MOV-1FW-151A AUX FEED PUMP DISCHARGE THROTTLE 2 B MOV-1FW-151B AUX FEED PUMP DISCHARGE THROTTLE 2 B MOV-1FW-151C AUX FEED PUMP DISCHARGE THROTTLE 2 B MOV-1FW-151D AUX FEED PUMP DISCHARGE THROTTLE 2 B MOV-1FW-151E AUX FEED PUMP DISCHARGE THROTTLE 2 B MOV-1FW-151F AUX FEED PUMP DISCHARGE THROTTLE 2 B MOV-1RW-102A2 1WR-Pr1A DISCH ISOLATION 3 B MOV-1RW-102B1 1WR-P-1B DISCHARGE ISOLATION 3 B MOV-1RW-102C1 1WR-P-1C DISCHARGE ISOLATION 3 B MOV-1RW-102C2 1WR-P-1C DISCHARGE ISOLATION 3 B MOV-1RW-103A 1RS-E-1A & C HEADER SUPPLY ISOLATION 3 B MOV-1RW-103B 1RS-E-1A & C HEADER SUPPLY ISOLATION 3 B MOV-1RW-103C 1RS-E-1B & D HEADER SUPPLY ISOLATION 3 B MOV-1RW-103D 1RS-E-1B & D HEADER SUPPLY ISOLATION 3 B MOV-1RW-104A 1RS-E-1A INLET ISOLATION 2 B MOV-1RW-104B 1RS-E-1B INLET ISOLATION 2 B MOV-1RW-104C 1RS-E-1C INLET ISOLATION 2 B MOV-1RW-104D 1 RS-E-1 D INLET ISOLATION 2 B MOV-1RW-105A 1 RS-E-1 A OUTLET ISOLATION 2 B MOV-1RW-105B 1 RS-E-1 B OUTLET ISOLATION 2 B MOV-1RW-105C 1 RS-E-1 C OUTLET ISOLATION 2 B MOV-1RW-105D 1 RS-E-1 D OUTLET ISOLATION 2 B MOV-1RW-106A 1CC-E-1A.B.C RW SUPPLY ISOLATION 3 B

Beaver Valley Power Station, Unit Nos. 1 and 2 10 CFR 50.55a Request Number: VRR1, Revision 1 Page 6 of 10 BVPS-1 ASME Code Component(s) Affected Valve Number Description Class Category MOV-1RW-106B 1CC-E-1A.B.C RW SUPPLY ISOLATION 3 B MOV-1RW-113A 1EE-E-1A RW SUPPLY ISOLATION 3 B MOV-1RW-113B 1EE-E-1A RW SUPPLY ISOLATION 3 B MOV-1RW-113C 1 EE-E-1 B RW SUPPLY ISOLATION 3 B MOV-1RW-113D1 1 EE-E-1 B RW SUPPLY ISOLATION 3 B MOV-1RW-114A 1CC-E-1A.B.C RW SUPPLY ISOLATION 3 B MOV-1RW-114B 1CC-E-1A.B.C RW SUPPLY ISOLATION 3 B MOV-1RW-116A EMERGENCY RW PUMP 9A DISCH ISOL 3 B MOV-1RW-116B EMERGENCY RW PUMP 9B DISCH ISOL 3 B 1VS-D-5-3A CNMT PURGE EXHAUST ISOLATION 2 A 1VS-D-5-3B CNMT PURGE EXHAUST ISOLATION 2 A 1VS-D-5-5A CNMT PURGE SUPPLY ISOLATION 2 A 1VS-D-5-5B CNMT PURGE SUPPLY ISOLATION 2 A Abbreviated Terms AUX -Auxiliary RHR - Residual Heat Removal CH - Charging RW -River Water CHEM - Chemical RWST - Refueling Water Storage Tank CNMT - Containment SW -Seal Water DISCH - Discharge VCT - Volume Control Tank HX - Heat Exchanger 1SI-P - Safety Injection Pump INJ - Injection 1SI-TK - Safety Injection Accumulator ISOL - Isolation PCV-1RC - Pressurizer Pressure Control Valve PORV - Power Operated Relief Valve 1QS-P - Quench Spray Pump RC - Reactor Coolant 1RS-P - Recirculation Spray Pump RCL - Reactor Coolant Loop 1WR-P -River Water Pump RCP - Reactor Coolant Pump 1RS-E - Recirculation Spray Heat Exchanger RCS - Reactor Coolant System 1CC-E - Component Cooling Water REGEN - Regenerative Heat Exchanger RET - Return 1EE-E - Diesel Generator Heat Exchanger

Beaver Valley Power Station, Unit Nos. 1 and 2 10 CFR 50.55a Request Number: VRR1, Revision 1 Page 7 of 10 BVPS-2 ASME Code Components) Affected Valve Number Description Class Category 2RCS*MOV535 RCS PORV ISOLATION BLOCK 1 B 2RCS*MOV536 RCS PORV ISOLATION BLOCK 1 B 2RCS*MOV537 RCS PORV ISOLATION BLOCK 1 B 2CHS*LCV115B CHG PUMP HEADER SUPPLY FROM RWST A 2CHS*LCV115C CHG PUMP HEADER SUPPLY FROM VCT IISS))

B 2CHS*LCV115D CHG PUMP HEADER SUPPLY FROM RWST A 2CHS*LCV115E CHG PUMP HEADER SUPPLY FROM VCT B 2CHS*MOV289 CHARGING LINE ISOLATION A 2CHS*MOV308A 2RCS*P21A SEAL WATER SUPPLY ISOL 2 A 2CHS*MOV308B 2RCS*P21B SEAL WATER SUPPLY ISOL A 2CHS*MOV308C 2RCS<<P21C SEAL WATER SUPPLY ISOL A IISS))

2CHS*MOV310 CHARGING TO RCS ISOLATION 2 B 2CHS*MOV350 BORIC AClD TANK TO CHARGING PUMP B 2CHS*MOV378 RCP SEAL WATER HEADER ISOLATION 2 A 2CHS*MOV381 RCP SEAL WATER HEADER ISOLATION 2 A 2CHS*MOV8130A CHG PUMP MINI-FLOW HEADER ISOL 2 B 2CHS*MOV8130B CHG PUMP SUCTION HEADER ISOLATION 2 B 2CHS<<MOV8131A CHG PUMP SUCTION HEADER ISOLATION 2 B 2CHS*MOV8131B CHG PUMP SUCTION HEADER ISOLATION 2 B 2CHS*MOV8132A CHG PUMP SUCTION HEADER ISOLATION 2 B 2CHS*MOV8132B CHG PUMP DISCHARGE HEADER ISOL B 2CHS*MOV8133A CHG PUMP DISCHARGE HEADER ISOL 2 B 2CHS*MOV8133B CHG PUMP DISCHARGE HEADER ISOL 2 B 2RHS*MOV701A RHS PUMP SUPPLY ISOLATION 1 A 2RHS*MOV701B RHS PUMP SUPPLY ISOLATION 1 A 2RHS*MOV702A RHS PUMP SUPPLY ISOLATION 1 A 2RHS*MOV702B RHS PUMP SUPPLY ISOLATION 1 A 2RHS*MOV720A RHS TO SIS RETURN LINE ISOLATION 1 A 2RHS*MOV720B RHS TO SIS RETURN LINE ISOLATION 1 A 2SIS*MOV836 CHS TO RCS COLD LEG INJECTION ISOL 2 A 2SIS*MOV840 CHS TO RCS COLD LEG INJECTION ISOL 2 A 2SIS1>MOVB41 CHS TO RCS COLD LEG INJECTION ISOL 2 B 2SIS*MOV842 SIS ACCUMULATOR TEST LINE 2 A 2SIS*MOV863A SIS PUMP DISCHARGE ISOLATION 2 B

Beaver Valley Power Station, Unit Nos. 1 and 2 10 CFR 50.55a Request Number: VRR1, Revision 1 Page 8 of 10 BVPS-2 ASME Code Component(s) Affected Valve Number Description Class Category 2SIS*MOV863B SIS PUMP DISCHARGE ISOLATION 2 B 2SIS*MOV867A BORON INJECTION TANK INLET ISOLATION 2 B 2SIS*MOV867B BORON INJECTION TANK INLET ISOLATION 2 B 2SIS*MOV867C BORON INJECTION TANK OUTLET ISOL 2 A 2SIS*MOV867D BORON INJECTION TANK OUTLET ISOL 2 A 2SIS*MOV869A SIS TO RCS HOT LEG HEADER ISOLATION 2 A 2SIS*MOV869B SIS TO RCS HOT LEG HEADER ISOLATION 2 A 2SIS*MOV8809A SIS PUMP SUCTION ISOLATION 2 A 2SIS*MOV8809B SIS PUMP SUCTION ISOLATION 2 A 2SIS*MOV8811A RSS PUMP DISCH TO SIS PIPING ISOL 2 B 2SIS*MOV8811B RSS PUMP DISCH TO SIS PIPING ISOL 2 B 2SIS*MOV8887A SIS PUMP DISCH TO RCS HOT LEG ISOL 2 B 2SIS*MOV8887B SIS PUMP DISCH TO RCS HOT LEG ISOL 2 B 2SIS*MOV8888A SIS PUMP DISCHARGE ISOLATION 2 A 2SIS*MOV8888B SIS PUMP DISCHARGE ISOLATION 2 A 2SIS*MOV8889 SIS PUMP DISCHARGE ISOLATION 2 A 2SIS*MOV8890A SIS PUMP MINI-FLOW 2 A 2SIS*MOV8890B SIS PUMP MINI-FLOW 2 A 2QSS*MOV101A QSS PUMP DISCHARGE ISOLATION 2 A 2QSS*MOV101B QSS PUMP DISCHARGE ISOLATION 2 A 2RSS*MOV154C RSS PUMP MINI-FLOW ISOLATION 2 B 2RSS*MOV154D RSS PUMP MINI-FLOW ISOLATION 2 B 2RSS*MOV155A RSS PUMP SUCTION ISOLATION 2 B 2RSS*MOV155B RSS PUMP SUCTION ISOLATION 2 B 2RSS*MOV155C RSS PUMP SUCTION ISOLATION 2 B 2RSS*MOV155D RSS PUMP SUCTION ISOLATION 2 B 2RSS*MOV156C RSS PUMP DISCHARGE ISOLATION 2 B 2RSS*MOV156D RSS PUMP DISCHARGE ISOLATION 2 B 2CCP*MOV112A 2RHS*E21A & E22A SUPPLY ISOLATION 3 B 2CCP*MOV112B 2RHS*E21B & E22B SUPPLY ISOLATION 3 B 2CCP*MOV118 CNMTINST AIR HX INLET ISOLATION 3 B 2CCP*MOV119 CNMT INST AIR HX INLET ISOLATION 3 B 2CCP*MOV120 CNMT INST AIR HX INLET ISOLATION 3 B 2CCP*MOV150-1 CCP HEADER CNMT ISOLATION 2 A 2CCP*MOV150-2 CCP HEADER CONTAINMENT ISOLATION 2 A

Beaver Valley Power Station, Unit Nos. 1 and 2 10 CFR 50.55a Request Number: VRR1, Revision 1 Page 9 of 10 BVPS-2 ASME Code Component(s) Affected Valve Number Description Class Category 2CCP*MOV151-1 CCP HEADER CONTAINMENT ISOLATION 2 A 2CCP*MOV151-2 CCP HEADER CONTAINMENT ISOLATION 2 A 2CCP*MOV156-1 CCP HEADER CONTAINMENT ISOLATION 2 A 2CCP*MOV156-2 CCP HEADER CONTAINMENT ISOLATION 2 A 2CCP*MOV157-1 CCP HEADER CONTAINMENT ISOLATION 2 A 2CCP*MOV157-2 CCP HEADER CONTAINMENT ISOLATION 2 A 2CCP*MOV175-1 AUX BLDG HEADER SC-3/NNS ISOLATION 3 B 2CCP*MOV175-2 AUX BLDG HEADER SC-3/NNS ISOLATION 3 B 2CCP*MOV176-1 AUX BLDG HEADER SC-3/NNS ISOLATION 3 B 2CCP*MOV176-2 AUX BLDG HEADER SC-3/NNS ISOLATION 3 B 2CCP*MOV177-1 AUX BLDG HEADER SC-3/NNS ISOLATION 3 B 2CCP*MOV177-2 AUX BLDG HEADER SC-3/NNS ISOLATION 3 B 2CCP*MOV178-1 AUX BLDG HEADER SC-3/NNS ISOLATION 3 B 2CCP*MOV178-2 AUX BLDG HEADER SC-3/NNS ISOLATION 3 B 2SWE*MOV116A AUX SERVICE WATER PUMP DISCHARGE 3 B 2SWE*MOV116B AUX SERVICE WATER PUMP DISCHARGE 3 B 2SWS*MOV102A SWS PUMP DISCHARGE ISOLATION 3 B 2SWS*MOV102B SWS PUMP DISCHARGE ISOLATION 3 B 2SWS*MOV102C1 SWS PUMP DISCHARGE ISOLATION 3 B 2SWS*MOV102C2 SWS PUMP DISCHARGE ISOLATION 3 B 2SWS*MOV103A SWS TO RSS HX SUPPLY HEADER ISOL 3 B 2SWS*MOV103B SWS TO RSS HX SUPPLY HEADER ISOL 3 B 2SWS*MOV105A SWS DISCHARGE FROM RSS HX A ISOL 3 B 2SWS*MOV105B SWS DISCHARGE FROM RSS HX B ISOL 3 B 2SWS*MOV105C SWS DISCHARGE FROM RSS HX C ISOL 3 B 2SWS*MOV105D SWS DISCHARGE FROM RSS HX D ISOL 3 B 2SWS*MOV106A SWS SUPPLY TO RSS HX ISOLATION 3 B 2SWS*MOV106B SWS SUPPLY TO RSS HX ISOLATION 3 B 2SWS*MOV107A SWS SUPPLY TO CCS HX ISOLATION 3 B 2SWS*MOV107B SWS SUPPLY TO CCS HX ISOLATION 3 B 2SWS*MOV107C SWS SUPPLY TO CCS HX ISOLATION 3 B 2SWS*MOV107D SWS SUPPLY TO CCS HX ISOLATION 3 B 2SWS*MOV113A SWS SUPPLY TO D/G HX ISOLATION 3 B 2SWS*MOV113D SWS SUPPLY TO D/G HX ISOLATION 3 B 2SWS*MOV152-1 SWS SUPPLY TO CNMT RECIRC COlL ISOL 2 A

Beaver Valley Power Station, Unit Nos. 1 and 2 10 CFR 50.55a Request Number: VRR1, Revision 1 Page 10 of 10 BVPS-2 ASME Code Components) Affected Valve Number Description Class Category 2SWS*MOV152-2 SWS SUPPLY TO CNMT RECIRC COIL ISOL 2 A 2SWS*MOV155-1 SWS RETURN FROM CNMT RECIRC COIL 2 A 2SWS*MOV155-2 SWS RETURN FROM CNMT RECIRC COIL 2 A 2IAC*MOV130 CNMT INSTRUMENT AIR ISOLATION 2 A 2IAC*MOV133 CNMT INSTRUMENT AIR ISOLATION 2 A 2IAC*MOV134 CNMT INSTRUMENT AIR ISOLATION 2 A 2HVR*MOD23A CNMT PURGE EXHAUST ISOLATION 2 A 2HVR*MOD23B CNMT PURGE EXHAUST ISOLATION 2 A 2HVR*MOD25A CNMT PURGE SUPPLY ISOLATION 2 A 2HVR*MOD25B CNMT PURGE SUPPLY ISOLATION 2 A Abbreviated Terms AUX -Auxiliary CCP - Primary Component Cooling Water System CCS - Turbine Plant Component Cooling Water System CHS - Chemical and Volume Control System CHG - Charging CNMT - Containment DISCH - Discharge D/G - Diesel Generator HX - Heat Exchanger INST - Instrument ISOL - Isolation PORV - Power Operated Relief Valve QSS - Quench Spray System RCP - Reactor Coolant Pump RCS - Reactor Coolant System RECIRC - Recirculation RHS - Residual Heat Removal System (BVPS-2)

RSS - Recirculation Spray System RWST - Refueling Water Storage Tank SIS - Safety Injection System SWS - Service Water System VCT - Volume Control Tank 2RCS*P - Reactor Coolant Pump 2RHS*E - Residual Heat Removal System Heat Exchanger