IR 05000483/1990004

From kanterella
Jump to navigation Jump to search
Partially Withheld Physical Security Insp Rept 50-483/90-04 on 900122-0208 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Security Plans & Procedures,Assessment Aids,Access Control,Vital Area Detection Aids & Security Program Audit
ML20006F827
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/15/1990
From: Creed J, Greger L, Pirtle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20006F825 List:
References
50-483-90-04, 50-483-90-4, EA-90-028, EA-90-28, GL-89-07, GL-89-7, NUDOCS 9003010226
Download: ML20006F827 (2)


Text

{{#Wiki_filter:vm .

G A

.

. g U.S. NUCLEAR REGULATORY COMMISSION ,

'

REGION III

i Report No. 50-483/90004 , Docket No. 50-483 License No. NPF-30 Licensee: Union Electric Company P.O. Box 149 - Mail Code 400 L St. Louis, MO 63166 - L Facility Name: Callaway County Nuclear Power Station, Unit 1 Inspection At: Callaway Site, Callaway County, Missouri NRC Region III Office, Glen Ellyn, Illinois Inspection Conducted: January 22-25, 1990, onsite January 29 to February 8,.1990, in NRC Region III Office Inspector: _ km1 IM 0 fgl$g.

Gary L 4Plrtle _ te l Physical Security Inspector e Reviewed By: kt ['M <8 /([ [[ . . 'JamesR. Creed, Chief [g Date' i Safeguards Section Apprn"ed By: (16h J -/5 -90 ' " L.~ Robl W Gre#er, Chief Date Reactor Programs Branch Inspection Summary Inspection on January 22 to February 8,1990 (Report No. 50-483/90004(DRSS)) Areas Inspected: Unannounced, routine physical security inspection of ' management effectiveness; security plans and procedures; assessment aids;

access control - Personnel; vital area detection aids; contingency plan implementation; security program audits; protection of Safeguards Information; training and qualification; followup on previous inspection findings; and - review of Generic Letter 89-07, " Land Vehicle Bomb Contingency Procedures" f-(SIMS Item MPA L9-07).

i ! Results: The licensee was found to be in compliance with NRC requirements within the areas examined, except as noted below. An apparent violation was noted in reference to the protection of some Safeguards Information, protection of Safeguards Information: On three specific occasions, containers with Safeguards Information were not adequately secured during specified non-duty hours.

Enclosure Contains D SAFECUARDS INFORMATION 900301022k $ $ h s3 Upon Separation This ADOC jDR PDC

Page Is Decontrolled

. . _ -. -- . ' . Planning for the land vehicle bomb threat had been completed by the licensee.

An open item pertaining to 4 modification of a portion of the protected area fence was reviewed and closed.

Management of the security organization continues to be effective. The security section was very responsive to inspection findings requiring staff action.

(Details: ) . P , }}