Text
.
.
__ _
_-
__-
_
_-.
_
e f
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-483/87003(DRSS)
License No NPF-30 Docket No. 50-483 Licensee: Union Electric Company P.O. Box - Mail Code 400 St. Louis, MO 63166 Facility Name. Callaway County Nuclear Power Station, Unit 1 Inspection Conducted: January 5-12, 1987 Date of Last Physical Security Inspection:
March 10-21, 1986 Type of Inspection:
Unannounced Physical Security Inspection
Inspectors:
- /
v Ol[:23[87
.
. R. Kniceley (/
Date'
Physical Security Inspector
/u v'
O1/Z:bl8 *7 T. J. Madeda Date
'
Physical Security Inspector Approved By:
f
/ 38[
[ R. Creed, Chief Date 5afeguards Section Inspection _ Summary
Inspection on January _5-12,1987 (Report No. 50-483/87003(ORSS)J I
Areas Inspected:
Included a review o? the Security PTan and Implementing
~
Procedures; Mana'gement Effectiveness; Security Organization; Security Program i
Audit; Records and Reports; Physical Barriers - Protected and Vital Areas;
'
Compensatory Measures; Lighting; Assessment Aids; Detection Aids - Protected and Vital Areas; Alarm Stations; Communications; Personnel Training and Qualifications - General Requirements; Safeguards Contingency Plan Implementation Review and Safeguards.
The inspection began during the day shift.
Results: The Itcensee was found to be in compliance with NRC requirements within the areas examined.
,
_
.
i t
Enclosure contains SAFEGUARDS INFOR!tATIO!!
0702020063 070122
-
Upon separation thic PDR ADOCK 05000403 page is Decontrolled
O PDH