IR 05000483/1982020
| ML20023B766 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 05/03/1983 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20023B767 | List: |
| References | |
| NUDOCS 8305060284 | |
| Download: ML20023B766 (1) | |
Text
.
..
MAY 3 883 Docket No. 50-483 Union Electric Company ATTN:
Mr. Donald F. Schnell Vice President - Nuclear Post Office Box 149 - Mail Code 400 St. Louis, MO 63166 Gentlemen:
Thank you for your letter dated April 13, 1983, informing us of the steps you have taken to correct the noncompliance which we brought to your attention in Inspection Report No. 50-483/82-20 forwarded by our letter dated March 15, 1983. We will examine these matters during a subsequent inspection.
For the item of noncompliance involving deficient design control we consider your request to respond no later than June 1, 1983, to be acceptable.
Your cooperation with us is appreciated.
Sincerely, K
3w R. L. Spessard, Director Division of Engineering cc:
-W. H. Weber, Manager, Nuclear Construction S. E. Miltenberger, Plant Manager cc w/1tr dtd 4/13/83:
,
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Region IV K. Drey Ronald Fluegge, Utility Divison
!
Missouri Public Service Commission 8305060284 830503 PDR ADOCK 05000483 a
'
r$o RI RII RIII RIIN.*pa,(ntelson RIII v
g'I W:, -
dn L1 le Spessard Yin /jp l
04/29/83 (,
S/3
/Got
.