IR 05000483/1982001
| ML20054D113 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 04/12/1982 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20054D114 | List: |
| References | |
| NUDOCS 8204220354 | |
| Download: ML20054D113 (1) | |
Text
- _ _ _
.
.
APR 1 2 I302'
fD r
Docket No. 50-483 z
'\\,
Union Electric Company
[/
^
-
-
N'
g ATTN:
Mr. Donald F. Schnell
.if Vice President - Nuclear
-
n a q 2, R FJ T
'
i w ;c# 3 'S Post Office Box 149 - Mail Code 400 M.! #d$c,a. ' '#
St. Louis, MO 63166 Q
p Gentlemen:
N/
g Thank you for your letter dated April 2,1982, informing us of the steps you have taken to correct the noncompliance which we brought to your attention in Inspection Report No. 50-483/82-01 forwarded by our letter dated March 8, 1982. We will examine these matters during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely, Origjaag gg Y CNs !!Orcif ug's C. E. Norelius, Director
-
--
Division of Engineering and Technical Programs cc:
W. H. Weber, Manager Nuclear Construction cc: w/1tr dtd 4/2/82:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Region IV K. Drey Ronald Fluegge, Utility Division, Missouri Public Service Commission RIII RIII R II RI RIII RIII
~~ W M G&q i
M Ring /jp @ h y/g/ 4
,$' p
[gfIh QM JacKiw fe in le
-
4/8/82 o
duTTOWIM 8204220354 820412 PDR ADOCK 05000483 I hl)/
G PDR