IR 05000483/1982003
| ML20058J134 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 08/04/1982 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20058J137 | List: |
| References | |
| NUDOCS 8208090173 | |
| Download: ML20058J134 (1) | |
Text
.
U6 G82 Docket No. 50-483 Union Electric Company ATTN:
Mr. Donald F. Schnell Vice President - Nuclear Post Office Box 149 - Mail Code 400 St. Louis, MO 63166 Gentlemen:
Thank you for your letter dated July 21, 1982, informing us of the steps you have taken to correct the items of noncompliance which we brought to your attention in Inspection Report No. 50-483/82-03 forwarded by our letter dated June 15, 1982. We will examine these matters during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely, U rIhf5I~$IEf5EOy~0. O o3 I5" d
~
C. E. Norelius, Director Division of Engineering and Technical Programs cc:
W. H. Weber, Manager Nuclear Construction cc w/1tr dtd 7/21/82:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Region IV l
K. Drey Ronald Fluegge, Utility Division, Missouri Public Service Commission
.
'ac RIII RI I RI I RI RIII R
RIII Q
e.
((}{isler
'Qh
[
Q
$br511us Konkli jp Ne key Naidu Hawkins Holzmer L
e f)
ft <TL 7/ /82 8208090173 820804
~
h/
PDR ADOCK 05000483 O
PDR L.