U.S. NUCLEAR REGULATORY COMMISSION i
REGION III
Report No. 50-461/82-01 Docket No. 50-461 License No. CPPR-137 Licensee:
Illinois Power Company
>
500 South 27th Street
,
Decatur, IL 62525 (
<
Facility Name: Clinton Power Station, Unit 1 Inspection At: Clinton Site, Clinton, IL
!
Inspection Conducted: January 1 through February 15, 1982 Inspector:
H. H. Livermore 83)#d k
g Approved By:
R. D. Walker, Chief h-Reactor Projects Section 1C
!
Inspection Summary Inspection on January 1 through February 15, 1982 (Report No. 50-461/82-01(DPRP))
Areas Inspected: Routine, resident inspector's inspection of construction activities including material laydown and storage areas, program control, and
,
investigation activities in the electrical and welding areas. The inspection involved a total of 100 inspector-hours onsite by one NRC inspector, including 0 inspector-hours onsite during off-shifts.
Results: Of the areas inspected, no items of noncompliance or deviations were identified for this report.
Items of noncompliance in the aforementioned investigative areas will be included in Report No. 82-02.
.
8203310193 820311 oDR ADOCK 05000461
.
,-
~
,
,
DETAILS 1.
Persons Contacted Priacipal Licensee Employees W. C. Gerstner, Executive Vice President
- J. O. McHood, Vice President, Project Manager
- R. J. Canfield, Director-Construction A. J. Budnick, Director-QA
- E.
E. Connon, Director-Compliance
- L. W. Dozier, Assistant Director-Construction R. W. Folck, Station QA Engineer
- J. S. Spencer, Director, Design Engineering NSED J. Geier, Manager-General Engineering W. L. Calhoun, Electrical Construction Supervisor B. Spicer, QA Engineer
- M. C. Hollon, Supervisor, Construction QA G. N. Motsegood, Engineering
- R. Morgenstern, Station QA Engineer
- D.
G. Tucker, Operations Compliance Supervisor
- J. M. King, Assistant Director, Construction
- C. E. Calhoun, Operations QA
- M. E. D' Haem, Supervisor, Operations QA L. V. Koch, Vice President M. D. Tindill, Engineer T. F. Plunkett, Plant Manager
- R. J. Backen, QA Specialist Baldwin Associates
- J. W. Smart, QA Manager
- T.
Selva, Manager, Quality and Technical Services W. J. Harrington, Project Manager and Vice President
- J. E. Findley, Resident Engineer
- H. R. Swift, Project Engineer
- L. A. Gelbert, QC Manager G. B. Browne, Manager, Subcontracts B. Curby, Asst. Project Manager
- G. Chapman, Manager, Technical Services J. C. Wilson, Assistant Manager, QC
- T.
Yearick, Assistant Project Manager H. J. Harris, Sr. QC Electrical D. R. Murphy, Sr. Electrical Engineer
- W.
L. Atkins, Asst. Project Engineer Other staff and personnel were contacted during the reporting period.
- Denotes those attending at least one of the exit meetings.
,
,.. -
2.
Functional or Program Areas Inspected a.
Site Tours At periodic intervals during the report period, tours of areas of the site were performed. These tours were intended to assess the cleanliness of the site; storage conditiens of equipment and material being used in site construction; the potential for fire or other hazards which might have a deleterious effect on personnel and equipment; and to witness construction activities in progress, No items of noncompliance or deviations were identified.
b.
Electrical Stop Work A Region III team has been performing an investigation ant inspection in the area of electrical cable tray installation and related quality control inspection. The licensee issued a Stop Work in this area and Region III followed up with a Confirmatory Action Letter. The Resident Inspector has been assisting with the investigation. All items of noncompliance and deviation will be included in report 50-461/82-02.
c.
Program Control At periodic intervals the inspector reviewed Nonconformance Reports (NCRs), change implemented Field Change Requests (FCRs),
selected audit findings, construction procedure revisions, Quality Control procedure revisions, and plant problems identi-fled by the licensee and contractor Baldwin Associates (BA).
The inspector attended selected weekly schedule meetings and startup/ turnover meetings.
No items of noncompliance or deviation were identified.
3.
Exit Meetings The Resident Inspector attended an exit meeting conducted by Region
'III personnel R. Knop and C. Norelius on January 22, 1982 and in addition the resident inspector met with licensee representatives (denoted under Persons Contacted) on January 8 and February 12, 1982.
The inspector summarized the scope and findings of the inspections performed at these meetings.