IR 05000456/1981014

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-456/81-14 & 50-457/81-14
ML20027B267
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/13/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20027B269 List:
References
NUDOCS 8209160596
Download: ML20027B267 (1)


Text

e

.

SEP 13 1982 Docket No. 50-456 Docket No. 50-457 Commonwealth Edison Company ATrN:

Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

Thank you for your letter dated August 18, 1982, as an interim report, informing us of the revised schedule for steps you plan to take to correct the noncompliance which we brought to your attention in Inspection Reports No. 50-456/81-14 and No. 50-457/81-14 forwarded by our letter dated January 5, 1982.

k'e will examine these matters during a subsequent inspection after receiving your final report.

Your cooperation with us is rppreciated.

Sincerely,

" Original Signed by C.E. Morellus" C. E. Norelius, Director Division of Engineering and Technical Programs cc:

Louis 0. DelGeorge, Directo of Nuclear Licensing V.

I. Schlosser Project Manager R. Cosaro, Project Superintendent J. F. Gadac, Station Superintendent cc w/ltr dtd 8/18/82:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Karen Borgstadt, Office of Assistant Attorney General f