| 50-456-81-13, 50-457-81-13, IEB-76-04, IEB-77-02, IEB-77-03, IEB-77-07, IEB-78-10, IEB-78-12A, IEB-78-12B, IEB-79-03, IEB-79-06, IEB-79-07, IEB-79-12, IEB-79-16, IEB-79-17, IEB-79-18, IEB-79-21, IEB-79-24, IEB-79-26, IEB-80-04, IEB-80-06, IEB-80-10, IEB-80-18, IEB-80-19, IEB-80-24, IEB-81-01, IEB-81-01-R1, IEB-81-03, NUDOCS 8112210286 | |
| Download: ML20039A768 (5) | |
Text
.- -,
-.
.
-
_
.
-.-
.
..
U.S. NUCLEAR REGULATORY COMMISSION REGION III-Report No. 50-456/81-13; 50-457/81-13
-
Docket No. 50-456; 50-457 License No. CPPR-132; CPPR-133
. Licensee: Commonwealth Edison Company P.O.-Box 767 Chicago, IL 60690 Facility Name: Braidwood Station, Units 1 and 2 Inspection At: Braidwood, IL Inspection Conducted: November 4-5, 1981
.
/ Y/[f/
Inspectors:
J.
fry /
f'
'
/2 /
J.
.
/
.
,
Accompanied By:
R. C. Knop ( November 5,- 1981)
Approved By:
D.
ayes,'C Y
/ M /, M/
.
'
Reactor Projects Section IB Inspection Summary Inspection on November 4-5, 1981 (Report No. 50-456/81-13; 50-457/81-13)
. Areas Inspected: Control panel welding activities; followup licensee action relative to IE Bulletins and Circulars.
Installation of safety related-
<
tanks and heat exchangers. Welding activities relative to safety related
,.
. piping system,. The inspection involved a total of 24 inspector-hours on-site by two NRC inspectors including 0 inspector-hours onsite during off-i shifts.
Results: No items of noncompliance or deviations were identified during
'
this inspection.
!
8112210286 811208 PDR ADOCK 05000456 G
,
-
PM.
~_
,
'
....
-..--.-
..
..m.....
...
m
-
.
.
..
m
.
-
'
m--- a
.
-
.
DETAILS 1.
Persons Contacted Principal Licensee Employees
- R. Cosaro, Site Construction Su,)erintendent T. Sommerfield, Site QA Superint ndent
- D. Brown, QA Supervisor
- S. Hunsader, QA Supervisor
- C. Memecke, Lead Electrical Engineer
- J. Merwon, Lead Mechanical Engineer M. Gorski, QA Engineer Contractor and Other Personnel R. Brown, QC Manager L.K. Comstock Co.
J. Barnes, Area Engineer L.K. Comstock Co.
V. Kilgone, Foreman, L.K. Comstock Co.
- Denotes those personnel attending the exit interview.
2.
Licensee Action on Previously Reported Items (Closed) Unresolved item (50-456/81-05-01)
Clarity of procedures for control of welding activities. Procedure QCP-B8 has been revised to specify disposition of welding electrodes in puncture or unsealed containers. This matter is considered resolved.
3.
Program or Functional Areas Inspected a.
Main Control Board Welding The inspectors observed rework welding in progress on panels in the control room. Rework procedures and checklists were at the work location in the control room.
Weld procedures and welders had been qualified. One quality control inspector was assigned to inspect welding on the panels as it was completed.
Instru-ments and wiring had been removed from the panel, tagged, and temporarily stored until the panel was ready for reinstallation of the instrumentation.
b.
Pipe Welding The inspectors examined completed field welds in the component cooling and chemical and volume control systems. Specific welds examined included CC43-FW22, CC43-FW21, CC43-FW25, CV33-FW8A and CV33-FW8B. The welds were completed and the required nondestruc-tive examinations (NDE) had been performed.
NDE results indicated that the final welds were acceptable.
-2-
- -
-
- - -
. -
.
.
Weld material issue receipts indicating materials were controlled in accordance with procedures were filed with the weld joint data packages. Weld travelers indicate that quality control inspection were performed at the various holdpoints that had been established and that the final weld had been inspected and accepted by the Authorized Nuclear Inspector.
No items of noncompliance or deviations were identified in the welding area.
c.
Inspection and Enforcement Bulletins The inspectors examined the licensee's actions relative to the following IE Bulletins (IEB) received by CECO to determine whether timely responses were sent to the NRC when required.
Whether the responses addressed the appropriate technical questions, and whether the required actions had been accom-plished.
IEB 76-04, March 31, 1976 IEB 77-02, September 12, 1977 IEB 77-03, September 12, 1977 IEB 77-07, December 19, 1977 IEB 78-10, June 27, 1978 IEB 78-12, September 29, 1978 IEB 78-12A, November 24, 1978 IEB 78-12B, IEB 79-03, March 12, 1979 IEB 79-06, April 14, 1979 IEB 79-07, April 14, 1979 IEB 79-12, May 31, 1979 IEB 79-16, July 26, 1979 IEB 79-17, October 29, 1979, Revision 1 IEB 79-18, August 7, 1979 IEB 79-21, August 13, 1979 IEB 79-24, September 27, 1979 IEB 79-26, November 20, 1979 IEB 80-04, February 8, 1980 IEB 80-06, March 13, 1980 IEB 80-10, May 6, 1980 IEB 80-18, July 24, 1980 IEB 80-19, August 20, 1980, Revision 1 IEB 80-24, November 21, 1980 IEB 81-01, January 27, 1981 IEB 81-01, January 27, 1981, Revision 1 IEB 81-03, April 10, 1981 The inspection indicates that licensee action relative to the above bulletins has been accomplished in accordance with the requirements of the bulletins. These bulletins are considered closed for both units.
-3-
-
.
.
d.
Inspection and Enforcement Circulars The inspectors examined licensee action relative to IE Circulars-(IEC) received by CECO. The following circulars have been re-viewed by the licensee, responsibilities for action have been assigned and the action accomplished in accordance with require-ments of the circular. These circulars are closed for both units.
IEC 76-03, September 13, 1976 IEC 76-05, October 8, 1976 IEC 77-03, March 4, 1977 IEC 77-06, April 5, 1977 IEC 77-13, September 23, 1977 IEC 77-16, December 13, 1977 IEC 78-03,.May 12, 1978 IEC 78-07, May 13, 1978 IEC 78-08, June 2, 1978 IEC 78-09, June 8, 1978 IEC 78-18, November 6, 1978 IEC 79-02, January 16, 1979 IEC 79-05, Mar ch 20,1979 IEC 79-17, August 14, 1979 IEC 79-20, September 24, 1979 IEC 79-21, October 19, 1979 IEC 79-25, January 31, 1980, Supplement A IEC 80-02, February 1, 1980 IEC 80-03, March 6, 1980 IEC 80-14, June 24, 1980 IEC 80-15, June 20, 1980 IEC 80-16, June 27, 1980 IEC 80-17, July 23, 1980 IEC 80-18, August 22, 1980 IEC 80-21, September 10, 1980 IEC 80-22, October 2, 1980 IEC 80-23, October 31, 1980 IEC 81-01, January 23, 1981 IEC 81-02, February 9, 1981 IEC 81-03, March 2, 1981 IEC 81-04, April
~0, 1981
IEC 81-05, March 31, 1981 IEC 81-06, April 14, 1981 IEC 81-07, May 14, 1962 IEC 81-08, May 29, 1981 IEC 81-09, July 10, 1981 IEC 81-10, July 2, 1981 IEC 81-11, July 24, 1981 IEC 81-12, July 22, 1981
.
4-
-
-
-
.
-
- -- - -
...
,
e.
Safety Related Components The inspectors examined the installation of safety related heat exchangers and tanks, including piping connections and founda-tions. Components inspected were:
Letdown heat exchangers Soric acid tanks Excess letdown heat exchangers Seal water heat exchangers Sample heat exchanger f.
Exit Interview The inspectors met with licensee representatives (denoted under Persons Contacted) at the conclusion of the inspection. The inspectors summarized the scope and findings of the inspection.
The licensee ackrexledged the findings as reported herein.
,