IR 05000454/1980004
| ML20008F360 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 02/17/1981 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20008F361 | List: |
| References | |
| NUDOCS 8103130075 | |
| Download: ML20008F360 (1) | |
Text
[e nto,#
'
'\\
,
u
'
- o UNITED STATES E'
- g NUCLEAR REGULATORY COMMISSION q'
n
$
A E
REGION lli
e,
'
799 ROOSEVELT ROAD E
%*
,o GLEN ELLYN,lLLINOIS 60137
-
'
- ....
ea y
- ,;
--
g-FEB 17 1981 s
a
%
Docket No. 50-454 o
O Docket No. 50-455
$
Cocunonwealth Edison Company ATTN:
Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
Thank you for your letter dated January 26, 1981, informing us of the steps you have taken to correct the item of noncompliance which we brought to your atten-tion in Investigation Report No. 50-454/80-04; 50-455/80-04, forwarded by our letter dated December 30, 1980. With regard to Attachment B of your letter, we do not consier that the QA Manager of Systems Control Corporation (SCC) was adequately qw lified to act as a Level III in accordance with ANSI N45.2.6-1973 during the period of time covered by the investigation. During a telephone con-versation between Mr. J. Konklin of this office and Mr. G. Marcus of your staff on February 6,1981, Mr. Marcus stated that the conclusion of Attachment B is based on the present experience and training of the SCC QA Manager. We will examine your corrective actions during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely, eT8b'
G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc:
J. S. Abel, Director of Nuclear Licensing Gunner Sorensen, Site Project Superintendent V. I. Schlosser, Project Manager R. E. Querio, Station Superintendent Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Dean Hansell, Office of Assistant Attorney General Myron M. Cherry