IE Insp Repts 50-454/80-11 & 50-455/80-10 on 800613.No Noncompliance Noted.Major Areas Inspected:Results of Investigation Into Cause of Matl Failure of Containment post-tension Sys Anchor Heads & Corrective Actions Planned
ML19330B056
Person / Time
Site: Byron  Constellation icon.png
Issue date: 06/23/1980
From: Gallagher E, Hayes D, Kanklin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19330B054 List:
References
50-454-80-11, 50-455-80-10, NUDOCS 8007300143
Download: ML19330B056 (3)


Text

.

O

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-454/80-11; 50-455/80-10 License No. CPPR-130; CPPR-131 Docket No. 50-454; 50-455 Licensee:

Commonwealth Edison Company P. O. Box 767 Chicago, IL 60690 Facility Name:

Byron Nuclear Generating Station, Units 1 and 2 Meeting At:

NRC Region III Office, Glen Ellyn, IL Inspectors:

E. J Gal ghe

[

W"iW~0#

Nha/SD F

H f b'

--

,

42 {[h'

Approved By:

D. W.

ayes, C f

Engineering Support Section 1

/

'

Meeting Summary Meeting on June 13, 1980 (Report No. 50-454/80-11; 50-455/80-10)

Areas Discussed: Results of Commonwealth Edison Company and INRYC0 Steel Company investigation into the causes of the material failure of the containment post-tension system anchor heads and the remedial measures to be taken to correct.

Results: Discussed in report under Paragraph 2, " Meeting Details".

5D 8007800

-

_

_

e

'

DETAILS 1.

Meeting Attendees in NRC Region III Office on June 13, 1980 NRC Region III C. C. Williams, Chief, Projects Section 2 E. J. Gallagher, Civil Engineer Inspector J. E. Konklin, Project Inspector D. 'i. Danielson, Chief, Engineering Support Section 2 F. C. Hawkins, Civil Engineer Inspector Commonwealth Edison Company J. T. Westermeir, Project Engineer W. Segersell, Structural Enngineer, SNED J. P. Wood, Structural Construction Engineer G. Gray, Construction Engineer, Braidwood Sargent and Lundy Engineers 0. Zaben, Senior Structural Project Engineer R. J. Netzel, Project Engineer, Structural INRYC0 Inc.

H. Presswalla, Manager, Engineering and Development D. Waitkus, Supervisor, Quality Assurance J. Kieny, Supervisor, Contract Administration R. Hough, Construction Engineer T. Fisk, General Manager G. Davis, Marketing Manager G. Johnston, Manager of Construction J. Heise, Manager, Contract Administration Inland Steel Company N. Lazardis, Supervising Resident Engineer R. Scime, General Supervising Metallurgist 2.

Meeting Details A meeting was held in the NRC Region III office in Glen Ellyn, Illinois on June 13, 1980 with Commonwealth Edison Company, Sargent and Lundy Engineers, and INRYC0 Steel Company to discuss the licensee's findings regarding the material failure of the Unit I containment post-tensioning system anchor heads.

]

-2-

..

INRYC0 Steel Company presented a technical discussion of the design of the post-tensioning system and the metallurgical'and structural investigations performed to determine the causes and recommended solutions to the material failure of the anchor heads.

This meeting was held as a prelude to the licensee's final report on the matter, which is due on June 27, 1980 as a result of a reported significant construction deficiency, per 10 CFR 50.55(e).

Upon receipt of the licensee's final report the NRC will perform a review and evaluation of the adequacy of the analysis, and corrective measures taken to preclude recurrence.

This item has been previously identified as an unresolved item in NRC Report 454/80-02/01.

,