IR 05000445/1982007
| ML20054H910 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/27/1982 |
| From: | Kelley D, Westerman T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20054H907 | List: |
| References | |
| 50-445-82-07, 50-445-82-7, NUDOCS 8206250173 | |
| Download: ML20054H910 (6) | |
Text
{{#Wiki_filter:. . APPENDIX U. S. NUCLEAR REGULATORY COMMISSION
REGION IV
Report No. 50-445/82-07 Docket No. 50-445 Category: A2 Licensee: Texas Utilities Generating Company 2001 Bryan Tower Dallas, TX 75201 Facility Name: Comanche Peak, Unit 1 Inspection At: Comanche Peak Steam Electric Station Inspection Conducted: April 1-30,1982 Inspector:
[2 - , D. L. Kelley, S&riior R iden eactor Inspector / Dde Approved: ? Yr //$ [/2 7/)( & / (fate ~
T. F. Westerinan, Chief Reactor Project Section A Inspection Summary , Inspection Conducted During the Period of April 1-30, 1982 (NRC Report 50-445/82-07) Arcas Inspected: Routine, announced inspection by the Senior Resident Reactor Inspector (Operations), including: (1) Action on Previous Inspection Findings; (2) Equipment Turnover; (3) Joint Test Group Activities; (4) Plant Tours. The inspection involved 98 inspector-hours by one NRC Inspector.
Resul ts: Within the areas inspected, no violations or deviations were identified.
8206250173 826607 PDR ADOCK 05000445 - ._.
. - _.
_.. .,
. .
Details 1.
Persons Contacted
- J. C. Kuykendall, Manager, Nuclear Operations
- R. A. Jones, Manager, Plant Operations
- R. E. Camp, Lead Startup Engineer (EDS)
- G. D. Smith, Assistant Lead Startup Engineer'(EDS)
R. B. Seidel, Operations Superintendent
- C. W. Killough, Operations Quality Assurance
- H. A. Lancaster, Startup Quality Assurance Specialist
- G. L. Kunkle, Startup Quality Assurance Supervisor
,
- T. L. Gosdin, TUGC0 - Public Information D. E. Deriney, Operations Quality Assurance Supervisor The SRIO also interviewed other applicant employees durina the inspection period.
- Denotes those attending the exit interview on April 30, 1982.
2.
Applicant Action on Previous Inspection Findings (Closed) Unresolved Item (8202-01) This finding involved discrepancies and/or weaknesses in the applicant's Startup Testing Quality Assurance Plan. The areas of the plan that were identified were: a.
Controls over conduct of preoperational testing and related activities.
b.
Requirements for inspection frequencies, procedures, and checklists had been established.
c.
A system of audits had been defined. The NRC Inspector was infonned, at the time these findings were identified, that the program was being revised.
The new program has been issued and reviewed by the NRC Inspector. The program, as revised, addresses the areas of concern. This matter is considered closed.
3.
Equipment Turnover From Construction to Applicant The NRC Inspector reviewed System / Subsystem Turnover package 02AI.1 (SST 02AI.1) to verify that the following provisions of. the applicant's turnover procedure (CP-SAP-3,R9,12/4/81) were met: System / Subsystem boundaries had been defined.
a.
b.
Required prerequisite testing had been accomplishe. _ . - _ = . _ _- - _ -.- . .
, c.
System / Subsystem discrepancies were identified on the Master ~ Systems Punchlist.
. d.
Maintenance and upkeep responsibilities had been assumed by ' the applicant.
e.
Proper custody tags were in place.
, I f.
The applicant had completed a review of the System / Subsystem
' Turnover package, including a system walkdown.
, In addition, the release of operational control from the applicant's , ' startup group to the operations group was also reviewed.
No violations or deviations were identified.
,. 4.
Joint Test Group (JTG) , The JTG is the startup phase equivalent of the Station Operations Review Committee (SORC).
Its primary functions are: a.
Review and approval of all preoperational test procedures, procedure revisions, and test results, , b.
Review and evaluation of the CPSES Startup Testing schedules.
c.
Assure allocation of project resources in support of startup program activities.
The membership of the JTG is: , a.
TUGC0 - Manager, Nuclear Operations b.
TUGC0 - Lead Startup Engineer (EDS) c.
TUGC0 - Manager, Plant Operations ' d.
TUSI - Engineering and Construction Manager e.
Westinghouse - Site Manager Startup Administrative Procedure (CP-SAP-2, R3, 4/6/82) describes the membership, responsibilities, duties and the conduct of the JTG meetings.
l The NRC Inspector attended the JTG meeting of April 30,1982, to observe the proceedings and verify that it was conducted in accordance with CP-SAP-2.
No violations or deviations were identified.
,
i , I + e---1 ,
s'c- . ,e r-_,r-. e,, - wrw - w v- ,,--w-3- - -, -+--*v- , - y e
- ,y---,.
v-- r-we, ,,e>rr -,9 - -s y
.
5.
Plant Tours At various times during this reporting period the NRC Inspector toured the plant to assess: a.
Housekeeping activities b.
Protection of installed safety-related equipment c.
Flushing and maintenance activities in progress No violations or deviations were identified.
6.
Exit Interview The NRC Inspector held an exit interview on April 30, 1982, with applicant representatives (denoted in paragraph 1 by *) to review the scope and findings of the insocctio. NacpommMs U.S.NUCLf.AA KEGULATCRY COMMISSION PetNCPAt aspec ORIName. aar. ess. awanese rwws TJa'== K a Ile.y 3 'D. L INSPECTOR'S REPORT yy,,,,, Office of Insoection and Enforcement j, p, Sgyg,g % " h. L. kellm > l '"^"s 7 " ooCxET No. m.,= oa uC Nss "'o"7 ' "5"C o^7' uC Nsts/veNoom i No. isv moouCn m.,= ,,o.
sea Mo.
vR.
Caml Pee L S.E.5.
[ ' ~ ~ * * * ' 10 S o o * 4 4 512 z ol1 A M - man l , W it e M Ti 1.~f i e 3 la ena diro [ I C I o - 0E'878 ' u toam
R a:PtAC: l , ' o . . _
- 12,00 Of myt3TIGATIONimSPECT10N WSPECTION PER80AMED ev ORGANIZ,v,T3ON CODE OF mtGIONdMQ CONQuCT.
A
- sO ACT TY (See #EAsc 0527 "Marico,mer decork
- bOM l
TO .1 - AEGIONAL CFFICE STAFS lQTHER % y,,gg,,,,,e g,,,,,,.. w agg; ""' MO. l Cav l VR.
l MC.
3Af j vs.
,,,"2 stSICENTINSPtCTOR MG'CN ASC N M^"C" O_ fl dI / hl hlq glgl{ 3 - MAFCAMANCE WAl$AL TEAM
,' " - 7.c. g f.. '..4 ,, AEGONAL ACTION TVPt CF ACT1vlTV CGNOuCTED ICheca one nos erww /02 - SAFETY cs - MGMT.v, SIT _ 10 - PLANT SEC.
ta - meoutRY ' ' * * ' ' * " * ' _ _ - NAC FORM 901 33 - mCOENT 07 - $PECAL 15 - INVESTIGATION 2 - AEGIONAL 0784C1 LETTER 04 - EN70ACIMENT 08 - VENOQR __ ,1 - mvENT,VER.
_ _ _ 12 - $N.PMENT/ EXPORT as - MGMT. Auos7 39 - M AT. ACCT.
i3..MPORT 2 %., ( e. 4 + t '.-. ,, -.,. 4."g,. g., f }.[ 6 C 9 ' ' W X T J :?.,{g ; ( ~,' y {{%*[ ~. f % 'l s ' . . ...r s w. * syg.y r TCTAL NuM8ER EN80RCEMENT CQNFERENCE REPOR T CON Tade l?30 jl ggy*1R om etPomT TR ANSMITTAL OATE ' * * CP violations ANo =tto aponMafloN ,e lC D OEviAT10NS . NRC PCRM 501 REPORT SENT [ t - CLEAm OR #EG.
TOMG FOR , LETTim issuto AChom l 3. OtvlATION A l 9 l C fQ Al3lCl3 A 9 lC lQ lMO.l3AY l V A. l40.lQAY l YR l l 4 - VIOLATION & OEVIATION 0 01 I f i I b ' - vis i j i - vis yh(,c r7lfj @ l I i1 l , , , .' y ).,f :-lfpp k y A'#$, *"l d )., }, ly R':: ' _ ? N, y flN, khN AY h l NIY, N. A f lif,'.$ . _ . . MQQuLl lN8 CAMA TION MOOut E 'N80 AM A TION "@ Moouts muustR INSP lq g g MODULE REE FORCwup M l M00utt muMeER m$p gg g MODULEREQ.70u0WuP , 1.
bh.hj I 2 I 5h ~sj !3
a-w- 5: ys
a s I
.= -5 a.
-- a ,o -: - . ., . c=:y- -2 a a a=:ru 5- - ., g=$ j s n . >
>t t - =c - - i: d y S - .. I io - . 332r5 WIo
5 ij E a{ 5J2t$ ikj g 5 I1 y3
t 3 7 .
T E 3 . a o} fj
- s I
a< s.I
- p-sca e32
e su
saa ev - = c 2 w .= = = = h! 3l3$f,oalcH ,,4, 3 II,I,,I o.L Ii,i 0 3 9,2.h,.,Lic A
,, . ,, , ll,I,,I Iii i,,I
,, ,, ,, , l,,ll I,,I l li,I C c ,, , ,, ,, i ci I,,Ill i,,I l Ii,I = ,, , ,, ,, , Y 3b,i L7,o a.!cW lo,9, a Ill,!,,I-ek'l3 7,oL1,o,118' loici4 o, ri olI I,,I . ,, , al I,~, ' ,,ll!,I,,1 l,, l I,,! - ,, , ci li,1,,Il},I,,! li,l,, II,I,,1 c el I., l.. I I I. I,, I I,,I., i1,i,,i e Nlal4,2h,oa leH lo,4,41,, Icl3la,fJa o, tic,,1 l i i i i I 'l I,iII I,,I . ,, i l I I,I,il al li,I ,, ,, i i i liii ci I l,I,,I cl I,, 1,, l I,,1 ,, ,, , el I.,til.I,,! =l I,, l., I I 1,,i ,, , Mab,ello,2.leH lo,4, Alo, t.ol l I i !,, i el i l I i, I l'! I,,IlliI,,I . i ,, ell.,I,,lll I,,! al 1,,II I,,i , ,, , cI l i, I,, l l l, I,, i 1,,ll I,,I e ,, ,
==:~traN gl I,, I,, l i l, I m I I,,ilI, i
- -
, ,, ,, 8 6"9'P'W4mrt '*B'""*'4rNeMNm '*ym , --.,.- - m ,egrtait== l .-
. . $*"' * * oocnet wis.enmoa ucense aeroar m ouu nuween %,
- 44fkhb,3
- 8 "C =
- * " "88*"'
=o.
- eso.
i ; ;,,, INSPECTOR'S REPORT l l l l
.a no uvar, ca o.wo,. wre
Yc" (Continuation)
- a
, , , , , , Office of Inspection and Enforcement i i c q - - e o- - ! I o vero.oa ormro. w, ..w.a . . _.. ,, ,,. _ _,,,_"_, - ,, L
. L-t 1.
L L ,a 11.
1L ,1I ..j ,, I ,.I ,,. 1 - ..l .I mi 2,. I ai aI
- I sl
, l sl l ,I j mI aI -! ->, I =l mI ,I sI +l
- I
,. U.S. NUCLEAR REGULATORY COMMISSION , _ _ _ _ - _ _ __. -, - _. _ }}