Text
.-
_
-
.-
.
_ -.
__
- -
'
- /'gaacog%'n
UNITED STATES
!#.
,
NUCLEAR REGULATORY COMMISSION k2
$
REGION 11
s, pM 3 /'[
101 MARIETTA ST., N.W., SUITE 3100 i
6, f
ATLANTA, GEORGIA 30303 a
l
"
'
JUN 19 luci
-
Report Nos. 50-424/81-06 and 50-425/81-06
,
Licensee:
Georaia Power Company
"
270 Peachtree Street Atlanta, GA 30303 i
Facility Name:
Vogtle Docket Nos. 50-424 and 50-425 i
l License Nos. CPPR-108 and CPPR-109
<
Inspection at Vogtle Site near Waynesboro, Georgia Inspector:
' NM
/////P/
j J. R. yrris Date' Signed Approved b A>H /
6 -/7-P/
'
]
T. E. Conlon, S'ection Chief
.
Date Signed
,
Engineering Inspection Branch
!
Engineering and Technical Inspection Division
,
SUMMARY Inspection on June 2-h,1981 Areas Inspected This routine, unannounced inspection involved 32 inspector-hours on site in the areas of structural concrete, construction status and previously identified items.
J Results Of the three areas inspected, no violations or deviations were identified in two areas; one violation was found in one area (Failure to control concrete vibration in accordance with procedure paragraph 6).
.
1 8108110521 810731 PDR ADOCK 05000424
.
G PDR,
-
-
- - -
.
-
-
-
--
- -
-
-
-
_
.
s
.
.
.
REPORT DETAILS 1.
Persons Contacted Licensee Employees K. M. Gillespie, Construction Project Marager H. H. Gregory, III, Assistant Construction Project Manager
C. R. Miles, QA Field Supervisor
- E. D. Groover, QA Site Supervisor M. H. Googe, Manager Field Operations
- B. C. Harbin, Civil Project Section Supervisor
- D. C. Garne, QA Field Representative
.
- J. E. Seagraves, Civil QC Section Supervisor l
- R. W. McManus, Manager Wality Control
.
j Other licensee employees contacted included four construction cra.ftsmen, two t2chnicians ard four office personnel.
>
Other Organizations
- J. Duffy, General Superintendent, Walsh Ccnstruction Company j
- D. P. Armstrong, Civil Resident Engineer, Bechtel i
- Atte.e~ exit interview 2.
Exit Interview The inspection scope and findings were summarized on June 5,1981 with those
,
l persons indicated in paragraph 1 above.
3.
Licensee Action on Previous Inspection Findings (Closed) Infraction (424/81-01-01;
' !ura to sample concrete test-cylinders.
The inspector examined une iicensee's response dated March 3, 1981 and implementation of the response. A new method has been established to track sampling and testing of concrete. This item is closed.
(Closed) Inspector Followup Item (424/79-13-01 and 425/79-13-02): Retriev-ability of QC records.
Examination of records on concrete pour number 2-01C-001, -002, -004 demonstrated that the licensee has updated their -
records storage systems.
Records requested by the NRC inspector were
,
retrieved in a timely manner. This item is closed.
,
4.
Unresolved Items Unresolved items were not identified during this inspection.
,
.
,-,e--
4-.
-,.,+, -
.~,rc-_.,_,
m -.
-.,,
,.,y
,
_m,,
.,,.,.,.. -
,.m
. _
.,r-e---..y,,-
-,,.
.,, _. - _. _,,, _
.
_
-
.
1.
.
.
5.
Independent Inspection The inspector observed ongoing work in the power block, results of concrete placements ar.d controls in the soils and concrete testing laboratory.
?
No violations or deviations were identified.
6.
Containment (Structural Concrete II)
Observation of Work and Work
-
Activities, Unit 1)
The inspector observed partial placement of pour numbers A-088-049 in the auxiliary building and A-118-067C in the control building.
Acceptance criteria examined by the inspector appear in the following documents:
a.
specification X2AP01; Forming, Placing, Finishing and Curing Concrete b.
Procedure CD-T-02, Concrete Quality Control c.
PSAR, Sections 3 and 17 Forms were tight and clean, rebar was properly installed and clean.
Preplacement inspection was indicated by the signed preinspection form.
Activities were continuously monitored by QC personnel. Examination of the batch plant indicated proper mixes were being delivered to specified sites, materials were being controlled and accurate batch plant records were being generated.
Samples for temperature, slump, air content, unit weight end strength met frequency requirements.
Observation ~ of placement activities disclosed the following violation.
Procedure CD-T-02, " Concrete Quality Control", paragraph V1.E.7 requires the spacing of concrete vibrator insertions to be approximately 18 inches apart.
In the lower one-third (approximately 10 feet) of pour number A-08B-049, vibrator insertions were made through openings spaced three-five feet apart
'.
-
in the concrete forms. The size of the openings, one foot wall width, and congestion did not allow the spacing of concrete vibration insertions to be made at the specified 18-inch spacing. Also most of the vibration was being
done with pencil vibrators. The specified 18-inch spacing is not adequate for pencil vibrators.
Failure to control concrete vibration in accordance with requirements was identified to the licensee as violation number 50-424/81-06-01.
7.
Containment (Structural Contrete I) - Review of Quality Records, Unit 2 The inspector examined quality records for pour number 2-01C, -002, -004 in the L'a i t 2 containment basemat.
Acceptance Criteria examined by the inspects * appear in the following documents:
i a.
Specif1 ation X2AP01, Forming, Placing, Finishing and Curing Concrete
_-
.
_
.....
.
_
_
_
_
... -
_
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
s,,
o
.
.
b.
CD-T-02, Concrete Quality Contrei c.
PSAR, Sections 3 and 17 Records examined by the inspector included batch tickets, batch plant inspection reports, preplacement inspection, test data for air, slump and temperature, strength results, curing, rebar splicing, aggregate and cement storage, and nonconformana reports.
No violations or deviations were identified.