U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No.
50-423/81-13 Docket No.
50-423 License No. CPPR-113 Priority Category A
Licensee:
Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06101 Facility Name:
Millstone Nuclear Power Station, Unit 3 Inspection at:
Waterford, Connecticut Inspection conducted:
October 19, 21-23, 1981
[a,Ona c.,
//flS/ $/
Inspectors:
S.K. Chaudhary, ' Reactor Inspector datd signed date signed
,
date signed Approved by: d I 'h/>[/
- /MkI
, L'.E. Trip /pl, Chief, Material and Processes date signed Section, EIB i
l Inspection Summary:
Inspection on October 19, 20-23, 1981 (Report No. 50-423/81-13 Areas Inspected: A routine announced inspection of the licensee's activity in the analysis and resolution of a Construction Deficiency Report for Rock-Anchors and storage of materials on site.
The inspection involved 28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br /> on-site and 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> off-site by one regional based inspector.
Results:
No items of noncompliance were identified.
8112140098 811127
$DRADOCK 05000423 PDR Region I Form 12 (Rev. April 77)
O DETAILS 1.
Persons Contacted Northeast Utilities
- K.W. Gray, Supervisor - Construction QA
- D.G. Diedrick, Manager, QA
- J. Putnam, Senior Construction Engineer
- D. Hoisington, Resident Civil Engineer S. Orefice, Superintendent - New Site Construction Stone and Webster S. Morris, Senior Engineer, FQC
- M. Mathews, Assistant Superintendent of FQC W. Vos, Engineer, FQC
- B. McKay, Resident Manager
- J.G. Kappas, Superintendent of Construction
- R. Bernard, Assistant Manager, FQC
"F.
Bearham, QAPA
- G. Turner, Superintendent, FQC U.S. Nuclear Regulatory Commission
- J.C. Mattia, Senior Resident Inspector
- denotes those present at the exit interview.
In addition to the above, several more persons were contacted during the course of the inspection.
2.
Site / Plant Tour:
The inspector conducted a walk-through tour of the site and the plant to assess general ccnformance to work procedures, house-keeping in open storage areas, and good construction practices in the areas of concrete, structural steel and material storage. The inspector also inspected stored materials in laydown areas for QC status tags denoting the accept / reject status of materials stored in open areas on the site, and the work areas inside the plant. The inspector observed that materials were stored properly in lay-down areas on supports and dunnege, pipe ends were covered / capped to prevent contamination, items were properly tagged indicating the accept / reject status, and the construction work in concrete and structural steel appeared to conform to project procedures and good construction practice.
..
.
.
No items of noncompliance were identified.
3.
Status of Construction Deficiency in Rock-Anchor System in Foundations of Category I Structures (50-423/79-00-01)
The inspector reviewed documentation, held discussions with cognizant constructor personnel, and visually inspected a random selection of accessible rock-anchors which have been installed to correct the deficiency. The inspector also verified the installation of additional columns in the auxiliary building to increase the structural stiffness of the building to resist seismic forces. The following documents were reviewed:
- Drawing Nos.
12179-EC-35-G, Rev. 2 12179-EC-35-F, Rev. 2
- Stone & Wester FQC, Inspection Report Log for Rock Anchors.
- FQC Inspection Reports - Type A - S-000203, dated 10/21/81 S-000349, dated 12/09/80
- Miscellaneous Data Reports for Rock Anchors, nos.1 through 118 (total of 60 anchors)
- Stone & Webster E&DCRs:
PS-3092 PS-3082
'
PS-3129
- Letters:
W.G. Counsil to R.T. Carlson; AEC-MP3-234 dated 4/21/81 L.D. Nace to R.E. Bush; NES-24018 dated 3/27/81 L.D. Nace to R.E. Bush, NES-24019 dated 3/27/81 J.S. Searway to E.R. Foster, Jr., NES-22686 dated 7/25/80 W. A. Matson to E.R. Foster, Jr., NES-21468 dated 12/17/79 i
R.T. Carlson to NNECO, dated 1/29/81 l
l W.G. Counsil to B.H. Grier, AEC-MP3-213 i
dated 7/30/80
. - _ _ -.
_ _
..
.
E.R. Foster to J.S. Searway, NEC-3784 dated 7/8/80 J.S. Searway to E.R. Foster, NES-21807 dated 2/20/80 W.G. Counsil to US NRC, AEC-MP3-198 dated 1/31/80 W.A. Matson to E.R. Foster, NES-21468 dated 12/17/79 W.A. Matson to E.R. Foster, NES-21391 dated 11/29/79
- Interoffice Memoranda:
J.P. Allen to S.B. Jacobs, dated 2/29/80 J.P. Allen to J.H. Flecher, dated 2/19/80 J.H. Flecher to J.P. Allen, dated 2/15/80
- Report of a Problem, D.E. McLellan to F. Sestak, Jr., dated 11/7/79 Based on the review of documents, discussions with cognizant licensee and A-E engineers, and personal observation, the inspector determined that the licensee had performed extensive analyses of the construction deficiency reported to NRC, and had submitted the final report to NRC detailing the cause of the problem and the corrective actions required to alleviate the inadequacy of structural design.
It appears, however, that the statement in the final report of 4/21/81 is in conflict with the status of work on-site. The final report states on page 3 that,
"All works on the installation of columns and rock anchors have been completed" However, anchor nos. 18, 19 and 20 in the electrical tunnel were not complete as of October 23, 1981.
i Furthermore, NRC needs additional design information to establish the validity of re-analysis and the acceptaoility of corrective actions accomplished. This information was not available on-site, therefore, this CDR remains open and will be followed-up in a subsequent inspection.
l 4.
Exit Interview
,
I l
The inspector met with licensee representatives (denoted * in Paragraph i
1) at the conc'usion of the inspection.
The inspector summarized the purpose, scope and findings of the inspection.
!
l l
,.
- _ -. -
-
_
_ _ _ _ _.