IR 05000245/1981013

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Rept 50-245/81-13
ML20033C903
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/19/1981
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20033C904 List:
References
NUDOCS 8112040480
Download: ML20033C903 (1)


Text

f

'

.

.

  1. 0V I s ag; Docket No. 50-245 Y,A.

.W(,{

/

Northeast Nuclear Energy Company b d(I ATTN: Mr. W. G. Counsil V

-

b

'

Senior Vice President - Nuclear Engineering and Operations Group ld DEC3 1981>

P. O. Box 270 ic, ! "* E"lE**,.

-

Q Hartford, Connecticut 06101

\\

.v.

.

Gentlemen:

A[

V

'

~

Subject:

Inspection 50-245/81-13 This refers to your letter dated No' ember 2, 1981, in response to our letter dated October 1, 1981.

Thank you for informing us of the corrective and preventive actions aocunented in your letter. These actions will be examined during a future inspection of your licensed program.

Your cooperation with us is appreciated.

Sincerely, c iginalsigned Er:S El N

Thomas T. Martin, Director Division of Engineering and Technical Inspection cc:

J. F. Opeka, Vice President, Nuclear Operations E. J. Mroczka, Station Superintendent D. G. Diedrick, Manager of Quality Assurance R. T. Laudenat, l'anager, Generation Facilities Licensing Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Connecticut bec:

Region I Docket Room 0FFICIAL RECORD COPY OL l'g-J'h ikj k

yj[sYr

'

EC

'Elsa Ebneter Chung Bettanhausen II l'flfI UblE(

Q 8112040480 811119 i

lb

!

PDR ADOCK 03000245 ll/l G

PDR

_