ML20038C739

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-423/81-13 on 811019 & 21-23.No Noncompliance Noted
ML20038C739
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/27/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20038C740 List:
References
NUDOCS 8112140089
Download: ML20038C739 (2)


See also: IR 05000423/1981013

Text

g;- ri

.

.

NOV 2O 1981

Docket No. 50-423

rg

& o(gh

Northeast Muclear Energy Company

N

g-

ATTH: Mr. W. G. Counsil

-

lcd % gO

7g,,fO

'J

Senior Vice President - Nuclear

'H

79

Engineering and Operations Group

7

m'f;' %%g

/,

P. O. Box 270

C;\\

,

,

Hartford, Connecticut 06101

Gentlenen:

Scbject:

Inspection 50-423/81-13

This refers to the routine safety inspection conducted by Mr. S. Chaudhary

of this office on October 19, 21-23, 1981 at the Hillstone fluclear Power

Station, Unit 3, at Waterford, Connecticut of activities authorized by NRC

License No. CPPR-113 and to the discussions of our findings held by l'r. S.

Chaudhary with !!r. D.G. Diedrick of your staff at the conclusion of the

inspection.

Areas examined during this inspection are des:ribed in the Office of Inspection

and Enforcenent Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Within the scope of this inspection, no itens of noncompliance were observed.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the f.RC's

Public Document Roon.

If this report contains any infomation that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten

(10) days from the date of this letter of your intention to file a request

for withholding; and (b) submit within 25 days from the date of this letter

a written application to this office to withhold such infornation. Consistent

with section 2.790(b)(1), any such application must be accompanied by an

affidavit executed by the owner of the information which identifies the

docuacnt or part sought to be withheld, and which contains a full statenent

of the reasons on the basis which it is clained that the infomation should

be withheld from public disclosure. This section f"rther requires the

statement to address with specificity the considera . ions listed in 10 CFR 2.790(b)(4). The information sought to be withheld .; hall be incorporated

as far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within tbc specified periods noted above, the

report will be placed in the Public Docurnt Roon. The telephone notification

of your intent to request withholding, or any request for an extension of

5go\\

4a

,

.--

m

-

py

I

RI:DETI

RI:DRPIV...

RI"1DRP' 8112140089 811127

l

+..RI:DETI

RI!

.

.M7

x

PDR ADDCK 05000423

\\

-> Chaudhary.:cb.. . pp

Ebneter..

Elasser.

Brpnne; O

PDR.

11/(f/81

pgI

gk)

gp;

ti/j/ .

n>

P[ hic FOhN 318 ( 10 80i N R C M 02 40

OFFICI AL RECOFWo) COPY

-

.

Northeast Nuclear Energy Company.

2

>

the 10 day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223..

No reply to this letter is required; .however, should you have any questions

concerning this inspection, we will be p1 ease.eto discuss them with you. .

Sincerely.

Original Sicnod Byi

E. J. Brunner, Chief

Projects Branch No.1, Division of

Resident and Project Inspection

Enclosure: Office of Inspection and Enforcement Inspection-

Report Number 50-423/81-13

cc w/ encl:

K. W. Gray, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

J. F. Opeka, Vice President, Nuclear Operations

R. T. Laudenat, Manager, Generation Facilities Licensing

D. G. Diedrick, Manager of Quality Assurance

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Infonnation Center (NSIC)

HRC Resident Inspector

State of Connecticut

bcc w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

omcch

,

jsua m e)

DATEf

.

.

..

. . .

.

d"Cf "" ' * ' "" " 2 '

OFFICIAL RECORD COP