IR 05000400/2014501

From kanterella
Jump to navigation Jump to search
IR 05000400/2014501, December 31, 2014, Shearon Harris, NRC Emergency Preparedness Annual Inspection Report
ML15028A105
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/22/2015
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Waldrep B
Duke Energy Progress
Linda K. Gruhler 404-997-4633
References
IR-201450
Download: ML15028A105 (3)


Text

January 22, 2015

SUBJECT:

SHEARON HARRIS NUCLEAR PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO. 05000400/2014501

Dear Mr. Waldrep:

On December 31, 2014, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Shearon Harris Nuclear Plant. This inspection began on January 1, 2014. Issuance of this letter closes Inspection Report Number 2014501. Inspection activities charged to this report includes conducting midcycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, in some cases, performing traditional enforcement activities.

Any observations and findings in these areas were provided to you via separate correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC Rules of Practice, a copy of this letter, and your response if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/

adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 50-400 License No. NPF-63

cc: Distribution via Listserv

ML15028A105

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRP/BR4 RII::DRS/PSB1

SIGNATURE CAF2 for SPS GTH1 BRB1

NAME S. Sanchez G. Hopper B. Bonser

DATE 1/ 6 /2015 1/ 6 /2015 1/ 22 /2015

E-MAIL COPY YES NO YES NO YES NO

Letter to Benjamin from Brian Bonser dated January 22, 2015.

SUBJECT: SHEARON HARRIS NUCLEAR PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO. 05000400/2014501

DISTRIBUTION:

G. Hopper, RII, DRP J. Dodson, RII, SR PE D. Jackson, RII, PE J. Austin, RII, SRI P. Lessard, RII, RI S. Price, RII, EICS L. Gibson, RII, EICS RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource