IR 05000400/2007501

From kanterella
Jump to navigation Jump to search
IR 05000400-07-501, on 04/09-13/2007; Shearon Harris Nuclear Power Plant; Emergency Preparedness Baseline Inspection
ML071200160
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/27/2007
From: Brian Bonser
NRC/RGN-II/DRS/PSB2
To: Duncan R
Carolina Power & Light Co
References
IR-07-501
Download: ML071200160 (13)


Text

April 27, 2007

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - EMERGENCY PREPAREDNESS INSPECTION REPORT 05000400/2007501

Dear Mr. Duncan:

On April 13, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Shearon Harris Nuclear Power Plant. The enclosed inspection report documents the inspection results, which were discussed on April 13, 2007, with Mr. Eric McCartney, Plant General Manager, and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA: Heather J. Gepford for/

Brian R. Bonser, Chief Plant Support Branch 2 Division of Reactor Safety Docket No. 50-400 License No. NPF-63

Enclosure:

NRC Inspection Report No. 05000400/2007501 w/Attachment: Supplemental Information

REGION II==

Docket Nos:

50-400 License Nos:

NPF-63 Report Nos:

05000400/2007501 Licensee:

Progress Energy Facility:

Shearon Harris Nuclear Power Plant Location:

5421 Shearon Harris Road New Hill, NC 27562-9998 Dates:

April 9-13, 2007 Inspectors:

L. Miller, Senior Emergency Preparedness Inspector (Section 1EP1, 1EP4)

J. Kreh, Emergency Preparedness Inspector (Section 1EP1, 4OA1)

P. O'Bryan, Senior Resident Inspector (Section 1EP1)

Approved by:

Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety

SUMMARY OF FINDINGS

IR 05000400/2007501;04/09-13/2007; Shearon Harris Nuclear Power Plant; Emergency

Preparedness Baseline Inspection.

The report covered an announced inspection by two emergency preparedness inspectors and one resident inspector. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.

NRC-Identified and Self-Revealing Findings

Cornerstone: Emergency Preparedness

None

Licensee-Identified Violations

.

None

REPORT DETAILS

REACTOR SAFETY

Cornerstone: Emergency Preparedness

1EP1 Exercise Evaluation

a. Inspection Scope

Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14).

This inspection activity represents one sample on a biennial cycle.

The onsite inspection consisted of the following review and assessment:

  • The adequacy of the licensees performance in the biennial exercise conducted on April 10, 2007, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPSs) in 10 CFR 50.47 (b) (4), (5), (9), and (10),which are emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
  • Other performance areas besides the RSPS, such as the emergency response organizations (ERO) recognition of abnormal plant conditions, command and control, intra-and inter-facility communications, prioritization of mitigation activities, utilization of repair and field monitoring teams, interface with offsite agencies, and the overall implementation of the emergency plan and its implementing procedures.
  • The post-exercise critique conducted April 12, 2007, to evaluate the licensees self-assessment of its ERO performance during the exercise and to ensure compliance with 10 CFR 50 Appendix E.IV.F.2.g.

The inspectors reviewed various documents which are listed in the Attachment to this report.

b. Findings

No findings of significance were identified.

1EP4 Emergency Action Level (EAL) and Emergency Plan Changes

a. Inspection Scope

The inspectors review of revisions to the emergency plan, implementing procedures and EAL changes was performed to determine that changes had not decreased the effectiveness of the plan. The inspectors also evaluated the associated 10 CFR 50.54(q) reviews associated with non-administrative emergency plan, implementing procedures and EAL changes. The Radiological Emergency Plan Revision 51 and Revision 52 were reviewed and covered the period from April 07, 2006 to April 9, 2007.

The inspection was conducted in accordance with NRC Inspection Procedure 71114, 04, Emergency Action Level and Emergency Plan Changes. The applicable planning standard (PS), 10 CFR 50.47(b)(4) and its related 10 CFR 50, Appendix E requirements were used as reference criteria. The criteria contained in NUREG-0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Regulatory Guide 1.101 were also used as references. This inspection activity represents one sample on an annual basis.

The inspectors reviewed various documents which are listed in the Attachment to this report.

b. Findings

No findings of significance were identified.

OTHER ACTIVITIES

4OA1 Performance Indicator (PI) Verification

a. Inspection Scope

The inspectors reviewed the licensees procedure for developing the data for the Emergency Preparedness PIs which are:

(1) Drill/Exercise Performance (DEP);
(2) ERO Drill Participation; and
(3) Alert and Notification System (ANS) Reliability. The inspectors examined data reported to the NRC for the period January to December 2006. Procedural guidance for reporting PI information and records used by the licensee to identify potential PI occurrences were also reviewed. The inspectors verified the accuracy of the PI for ERO DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the PI for ERO drill participation for personnel assigned to key positions in the ERO. The inspectors verified the accuracy of the PI for ANS reliability through review of a sample of the licensees records of periodic system tests.

The inspection was conducted in accordance with NRC Inspection Procedure 71151, Performance Indicator Verification. The applicable PI, 10 CFR 50.9 and Nuclear Energy Institute (NEI) 99-02, Revisions 3 and 4, Regulatory Assessment Performance Indicator Guidelines, were used as reference criteria. This inspection activity represents three samples on an annual basis.

The inspectors reviewed various documents which are listed in the Attachment to this report.

b. Findings

No findings of significance were identified.

4OA6 Meetings, including Exit

On April 13, 2007, the lead inspector for the emergency preparedness inspection presented the inspection results to Mr. E. McCartney, Plant General Manager, and other members of his staff. The inspectors confirmed that proprietary information was not provided or taken during the inspection.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee personnel

C. Burton, Director, Site Operations
E. McCartney, Plant General Manager
E. Wills, Manager Outage and Scheduling
J. Warner, Manager Operations
D. Corlett, Supervisor - Licensing/Regulatory Programs
T. Pilo, Emergency Preparedness Supervisor
K. Voelsing, Senior Engineering Licensing

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened

None

Closed

None

Discussed

None

LIST OF DOCUMENTS REVIEWED