UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIALANE,SUITE 210 WALNUTCREEK, CALIFORNIA94595 pter go 19%
Docket No. 50-397 Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99352 Attention:
Mr. G.
C. Sorensen Manager of Regulatory Programs Gentlemen:
Thank you for your letter of October 1,
1992, in response to our Notice of Violation and Inspection Report No. 50-397/92-20, dated September 1,
1992, informing us of the steps you have taken to correct the items which we brought to your attention.
Your corrective actions will be verified during a future inspection.
Your cooperation with us is appreciated.
Sincerely,
. F. Hiller,,Jr., Chief Reactor Safety Branch CC:
J.
W. Baker, WNP-2 Plant Manager A. G. Hosier, WNP-2 Licensing Manager J.
C. Gearhart, Director, guality Assurance G.
E. Doupe, Esq.
J.
V. Parrish, Assistant Managing Director for Operations A. Lee Oxsen, Deputy Managing Director M. H. Phil)ips, Esq.,
Winston 8I Strawn State of Washington 92ii020030 92i020 PDR ADQCK 05000397
.
Docket No. 50-397 ggy RO Qg Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99352 Attention:
Hr.
G.
C. Sorensen Manager of Regulatory Programs Gentlemen:
Thank you for your letter of October 1,
1992, in response to our Notice of Violation and Inspection Report No. 50-397/92-20, dated September 1,
1992, informing us of tlie steps you have taken to correct the items which we brought to your attention.
Your corrective actions will be verified during a future inspection.
"
Your cooperation with us is appreciated.
Sincerely, L. F. Hiller, Jr., Chief Reactor Safety Branch CC:
J.
W. Baker, WNP-2 Plant Manager A.
G. Hosier, WNP-2 Licensing Manager J.
C. Gearhart, Director, guality Assurance G.
E. Doupe, Esq.
J.
V. Parrish, Assistant Managing Director for Operations A. Lee Oxsen, Deputy Managing Director H.
H. Phillips, Esq.,
Winston
& Strawn State of Washington bcc w/copy of letter dated October 1,
1992:
Docket File Resident Inspector Project Inspector G.
Cook R.
Huey B. Faulkenberry J. Hartin J. Zollicoffer bcc w/o copy of letter dated October 1,
1992:
H. Smith Region V/ann
Oi
CClark I5 /l5'/g~
HShrme 94<5 MRoyack IO/Iq/q~
LMiller I~~/ t ES NO NO YES NO YES
ES NO
~
t,