Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-397/92-09 on 920515
ML17289A792
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/07/1992
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9208180145
Download: ML17289A792 (5)


Text

~p,S RE0y, (4 fp0 Cy i~

nO C

+rg Oi

+a*++

Docket No. 50-397 UNITED STATES NUCLEAR REGULATORYCOMMISSION

REGION V

,1450 MARIALANE WALNUTCREEK, CAUFPRNIA94596-5368 QG -'7 1992 I'ashington Public Power Supply System P.

0.

Box 968 3000 George Washington Way Richland, Washington 99352 I

Attention:

Mr. G.

C. Sorensen Manager of Regulatory Programs Gentlemen:

Thank you f'r your letter of June 15, 1992, in response to our Notice of Violation and Inspection Report No. 50-397/92-09, dated May 15, 1992, informing us of the steps you have taken to correct the items which we brought to your attention.

Your corrective actions will be verified during a future inspection.

Your cooperation with us is appreciated.

Sincerely, S.

A. Richards, Chief Reactor Projects Branch CC:

Mr. J.

W. Baker, WNP-2 Plant Manager Mr. A.

G. Hosier, WNP-2 Licensing Manager Mr. J.

C. Gearhart, Director of guality Assurance Mr.

G. f. Doupe, fsq.

Mr. J.

V. Parrish, Assistant Managing Director for Operations Mr. A.

Lee Oxsen, Deputy Managing Director Mr.

M.

H. Philips, fsq.

(Winston & Strawn)

9208 1

~ p5000397 80145 920807 PDR ADOC

DO I

'l

11 j I'

t

Docket No.

50-397.

Washington Public Power Supply System P.

0.

Box 968 3000 George Washington Way Richland, Washington 99352 Attention:

Mr.

G.

C.

Sorensen Manager of Regulatory Programs Gentlemen:

Thank you for your letter of June 15, 1992, in response to our Notice of Violation and Inspection Report No. 50-397/92-09, dated May 15, 1992, informing us of the steps you have taken to correct the items which we brought to your attention.

Your corrective actions will be verified during a future inspection.

Your cooperation with us is appreciated.

Sincerely, S.

A. Richards, Chief Reactor Projects Branch Mr. J.

W. Baker, WNP-2 Plant Manager Mr. A.

G. Hosier, WNP-2 Licensing Manager Mr. J.

C. Gearhart, Director of guality Assurance Mr.

G.

E.

Doupe, Esq.

Mr. J.

V. Parrish, Assistant Managing Director for Operations Mr.

A.

Lee Oxsen, Deputy Managing Director Mr.

M.

H.

Phi lips, Esq.

(Winston 5 Strawn)

bcc w/copy of letter dated June 25, 1992:

Docket File Resident Inspector Project Inspector G.

Cook R.

Huey B. Faulkenberry J. Martin State of Washington Joan Zollicoffer

bcc w/o copy of l.etter dated June 25, 1992:

M. Smith J.

Bianchi Region V/ann P oh son SRichar+.

/ /<z.

8/ld ~

EST COPY]

REQUEST COPY)

S TO PDR]

ES /

NO YES /

NO ES /

NO