IR 05000382-08-402, on 11/20/2008, Waterford Steam Electric Station, Unit 3 NRC Security Inspection Report (Cover Letter)
ML083470398
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/12/2008
From: Shannon M
Plant Support Branch-1
To: Walsh K
Entergy Operations
References
IR-08-402
Download: ML083470398 (3)


Text

UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N ber 12, 2008

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC SECURITY INSPECTION REPORT 05000382/2008402

Dear Mr. Walsh:

On November 20, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Waterford Steam Electric Station, Unit 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on November 20, 2008, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. Entergy Operations, Inc. 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390. and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/ PJE for Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-382 License No.: NPF-38 Nonpublic Enclosure:

Inspection Report 05000382/2008402 w/ Attachment: Supplemental Information cc w/o enclosure:

Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Vice President, Operations Support Entergy Services, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Entergy Operations, Inc. 3 Senior Manager, Nuclear Safety and Licensing Entergy Services, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Site Vice President Waterford Steam Electric Station, Unit 3 Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751 Director Nuclear Safety Assurance Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751 Manager, Licensing Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093 Director, Nuclear Safety & Licensing Entergy Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601