IR 05000373/1983017

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-373/83-17 & 50-374/83-16
ML20024E093
Person / Time
Site: LaSalle  
Issue date: 08/03/1983
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20024E094 List:
References
NUDOCS 8308090176
Download: ML20024E093 (1)


Text

-

..

.

AUG ' 31983 Docket No. 50-373 Docket No. 50-374 Commonwealth Edison Company ATTN:

Mr. Cordell Reed Vice President-Post Office Box 767 Chicago,_IL 60690 Gentlemen:

Thank you for your letter dated July 22, 1983, informing us of the steps you have taken to correct the noncompliance which we brought to your attention in Inspection Report No. 50-373/83-17 and 50-374/83-16 forwarded by our letter dated June 23, 1983.

We will examine these matters during a subsequent inspection.

Your cooperation with us is appreciated.

Sincerely,

" Original ~ signed,by E D. Shafer" W. D. Shafer, Chief Projects Branch 2-cc:

D. L. Farrar, Director of Nuclear Licensing l.

D..L.

Shamblin, Site

!

Construction Superintendent T. E. Quaka, Quality Assurance Superintendent-l C. J. Diederich, Station l

Superintendent j

R. H. Holyoak, Project Manager cc w/1tr dtd 7/22/83 DMB/ Document Control Desk (RIDS)

Resident-Inspector, RIII

'

'Phyllis Dunton, Attorney General's Office, Environmental-Control Division L

_

fpk obe/ b Walker i

g k

l 08/ 1/83 b l}$)

8308090176 830803 884 / g k -

PDR ADOCK 05000373 O

PDR