IR 05000010/1983010

From kanterella
Jump to navigation Jump to search
Forwards Mgt Meeting Repts 50-010/83-10,50-237/85-25, 50-249/85-20,50-254/85-22,50-265/85-25,50-295/85-24, 50-304/85-25,50-373/85-21,50-374/85-23 & 50-454/85-31 on 850624.No Noncompliance Noted
ML17195A895
Person / Time
Site: Dresden, Byron, Quad Cities, Zion, LaSalle, 05000000
Issue date: 07/26/1985
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17195A896 List:
References
NUDOCS 8507310063
Download: ML17195A895 (2)


Text

... *.

Docket Nos. 50-10;(50-231:)

50-249; 50-254; 50-265; 50-295; 50-304; 50-373; 50-374; 50-454 Commonwealth Edison Company ATTN:

Mr. Corde 11 Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

JUL 2 6 1985 This refers to the meeting conducted between Commonwealth Edison Company (CECo) and Region III management of June 24, 198 The purpose of the meeting was to discuss the status of the Regulatory Performance Improvement Program at Commonwealth Edison's operating site The enclosed meeting report sets forth the items discusse There were no noncompliances noted as a result of the meetin In acco~dance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be placed in the NRC's Public Document Roo Please let us know if you have any questions regarding this repor Enclosure:

Inspection Reports No. 50-10 85010(DRP);

N DR No. 50-249/85020(DRP)

No. 50-254/85022(DRP)

N ~265/85025(DRP)

No. 50-295/85024(DRP)

No. 50-304/85025(DRP)

No. 50-373/85021(DRP)

No. 50-374/85023(DRP)

. i* ~.

No. 50-454/85031(DRP)

See Attached List for Distribution

~5R7310063 sso?26 G

ADOCK 0500001 PDR

Sincerely, uorigina l Sf gned by E.G. Greenrnan

C. E. Norelius, Director Division of Reactor Projects

,

Commonwealth Edison Company Distribution cc w/enclosure:

D. L. Farrar, Director of Nuclear Licensing B. J. Thomas, Executive Vice President K. L. Graesser, Station Superintendent, Zion D. Galle, Division Vice President and General Manager, Nuclear Station Division L. DelGeorge, Assistant Vice President, Engineering, and Licensing V. I. Schlosser, Project Manager Gunner Sorensen, Site Project Superintendent N. Kalivianakis, Quad Cities Station D. J. Scott, Dresden Station R. E. Querio, Byron Station J. F. Gudac, Braidwood Station G. J. Diederich, LaSalle Station K. Graesser, Zion Station F. A. Palmer, Manager, Nuclear Safety W. C. Roberts, Division Industrial Relations Manager B. B. Stephenson, Manager of Production G. P. Wagner, Operations Manager-PWR W. P. Worden, Operations Manager-PWR E. D. Eenigenburg, Maintenance Manager W. L. Duke, Administration Service Director DMB/Dricument Control Desk (RIDS)

Senior Resident Inspector, RIII Dresden Senior Resident Inspector, RIII LaSalle Senior Resident Inspector, RIII Quad Cities Senior Resident Inspector, RIII Zion Senior Resident Inspector, RIII Byron Phyllis Dunton, Attorney General's Office, Environmental Control Division Mayor, City of Zion Diane Chavez, DAARE/SAFE D. W. Cassel, Jr., Es W. Paton, ELD L. Olshan, NRR/LPM H. S. Taylor, Quality Assurance Division

~:~~110-R~~t

~4/85 Jf 2<

2S

"71

)

~<ftJI~*

'flri ssbt imos

?fl<.

RIII

~

RI~~t Norelius