July 26, 2007
SUBJECT:
MCGUIRE NUCLEAR STATION - NRC RETAKE EXAMINATION REPORT 05000369/2007302 AND 05000370/2007302
Dear Mr. Peterson:
On June 28, 2007, members of your staff administered an NRC Senior Reactor Operator (SRO)
written retake examination to one employee of your company who had reapplied for a license to operate the McGuire Nuclear Station. The NRC waived the operating examination since the individual passed that portion of the test during the initial examination. On June 29, 2007, the examiner discussed the examination questions and preliminary findings with Mr. Wiley Killette of your staff.
The SRO applicant passed the written examination. There were no post examination comments.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact me at (404) 562-4607.
Sincerely,
\\\\RA\\\\
Robert C. Haag, Chief Operations Branch Division of Reactor Safety Docket Nos.
50-369, 50-370 License Nos. NPF-9, NPF-17
Enclosure:
Report Details
REGION II==
Docket Nos.:
50-369, 50-370 License Nos.:
05000369/2007302 and 05000370/2007302 Licensee:
Duke Power Company, LLC Facility:
McGuire Nuclear Station, Units 1 and 2 Location:
Huntersville, NC 28078 Dates:
Written Examination - June 28, 2007 Examiners:
E. Lea, Chief, Senior Operations Examiner Approved by:
Robert C. Haag, Chief Operations Branch Division of Reactor Safety
DPC Enclosure 1 SUMMARY OF FINDINGS ER 05000369/2007302, 050004370/2007302; 06/28/2007; McGuire Nuclear Station; Licensed Operator Examination.
The NRC examiner conducted an operator licensing initial retake examination in accordance with the guidance of NUREG-1021, Revision 9, Operator Licensing Examiner Standards for Power Reactors. This examination implemented the operator licensing requirements of 10 CFR
§55.43.
Members of the McGuire Nuclear Station training staff administered one Senior Reactor Operator (SRO) written retake examination on June 28, 2007. The written examination was developed by the McGuire Nuclear Station training staff.
The SRO applicant passed the written examination and was issued a license. There were no post examination comments.
No findings of significance were identified.
Enclosure 1 Enclosure 1 Report Details 4.
OTHER ACTIVITIES 4OA5 Operator Licensing Initial Examinations
a.
Inspection Scope The McGuire training staff developed the written examination. The NRC examination team reviewed the proposed written examination to determine whether the examination was developed in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9. Examination changes, agreed upon between the NRC and the licensee, were made according to NUREG-1021 and incorporated into the final version of the examination materials.
The examiner reviewed the licensees examination security measures while preparing the examination to ensure that examination security and integrity complied with 10 CFR 55.49, Integrity of examinations and tests.
The licensee administered the retake of the written examination on June 28, 2007, to one Senior Reactor Operator (SRO) applicant. The evaluation of the applicant and a review of documentation was performed to determine if the applicant met the requirements specified in 10 CFR Part 55.
b.
Findings No findings of significance were identified. The applicant passed his retake examination.
The NRC determined that the licensees examination submittal was within the range of acceptability expected for a proposed examination. One SRO passed the written retake examination. No post exam comments were submitted. The SRO written examination and answer key, and examination references may be accessed in the ADAMS system (ADAMS Accession Numbers ML072010386 and ML072010390)
4OA6 Meetings Exit Meeting Summary On June 29, 2007, the examiner discussed the examination and preliminary findings with Mr. Wiley Killette, Operations Training Instructor, over the phone. The examiner asked the licensee whether any material reviewed during the examination should be considered proprietary. No proprietary information was identified.