IR 05000348/1990011

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/90-11 & 50-364/90-11 on 900319-21.No Violations or Deviations Identified.Repts Withheld (Ref 10CFR2.790 & 73.21)
ML20012E222
Person / Time
Site: Farley  
Issue date: 03/27/1990
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Hairston W
Alabama Power Co
References
NUDOCS 9004020069
Download: ML20012E222 (2)


Text

.

n P L O U M M U b ilN T U Hivi.. ;;..,

!

UNIT 40 STO.f ts -

l

'e g toe g #

-

NUCLEAR CECULATOFlY CORAMCION j

i

,f,

,

,

meGion n -

-

g 191 h4A21ETTA STCEET,010.

j ATL&wT A.0EOnel A 30323

\\ k....*

MAR 2 71990

' Docket N:5. 50-348, 50-364 i

. License hos. NPF-2, NPF-8 j

j Alabama Fcwer Company

. ATTN:

Pr. W. G.- Hairston, Ill Ser.ior Vice President Nuclear Operations 40 Inverress Center Parkway i

P. O..Bcx 1295

!

Birmingta., AL 35201 l

Gentlerer :

SUBJECT:

NRC INSPECTION REPORT-N05. 50-348/90-11, 50-364/90-11 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by W. W. Stansberry on March 19-21, 1990.

The inspection included a review of act ivities authorized for your J. M. Farley facility. At the conclusion of the

-

inspecticn, the findings were discussed with those members of your staff identifisc-in the enclosed Inspection Report.

>

,

Areas. examined during the inspection are identified in the report.

Within these areas, the inspection consisted of selective examinations of procedures

L and representative records, interviews with personnel. and observation of

. activities in progress.

-

Within the scope of the inspection,_ violations or deviations were not

identifiec.

l In acccr:ance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security reasures are exempt from public disclosure. Therefore, the enclosure l-to this letter with the exception of the report cover page, which presents a

'

nonexergt summary, will not be placed in the NRC Public Document Room.

Should ycs ham any questions concerning this letter, please contact us.

1

Sincerely,

!

l

%

S

.

&

f ?;

g,,

,

W liiam E. Cline, Chief (

'9004020069 90o327 PDR ADoCV 05000348 A '

Nuclear Materials Safety and g-FDL Safeguards Branch g

'

Division of Radiation Safety

and Safeguards i

i i

Enclosure:

See page 2 Doc M W W W #

tDM48"4 M

,.

.s

%FEGU ARDS INFO.

.2,.

s..,

-

,

,,, -

..-

, ~,. -

-.

-

.

.

.

SAFEGUARDS lNFORMA1 tun

.

., ;~.

Alabama Power Company

NAR 2 71990

%.

Enclosure NRC Inspection keport j

cc w/ encl:

B..L. Moore Manager, Licensing

-!

Alabama' Power Company

P. O. Box 1295

Biriningham, AL 35201 R. P. Mcdonald Executive Vice President Alabama Power Company P. O. Box.1295 Birmingham, AL 35201

)

J. D. Wooderd i

Vice President J

i Nuclear Farley Project Alabama Power Company P

0.' Box 1295 Birmingham, AL 35201 D. N. Morey

.

General Manager

Farley Nuclear Plant

-

Drawer 470-

,

Ashford, AL 36312

'

cc w/ inspection Sununary:

Louis B. Long, General Manager

!

l-Southern Company Services, Inc.

P. O. Box 2625 t

'

l Birmingham,.AL 35202 Claude. Earl Fox, M.D.

'

State Health Officer

State Department of Public Health State Office Building Montgomery, AL 36130

Chainnan Houston' County Commission

~Dothan, AL 36301 i

cc w/ inspection Summary State of Alabama

Dcevawoonied home ::,=== l;;;,,_

. ~,>.,

...

. n

+

- - -

.

m

.

.