IR 05000348/1990006
| ML20033F341 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/08/1990 |
| From: | Mcguire D, Stansberry W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20033F339 | List: |
| References | |
| 50-348-90-06, 50-364-90-06, NUDOCS 9003200075 | |
| Download: ML20033F341 (1) | |
Text
wa
..- ff SQ htCoq#o UNITED STATES NUCLEAR REGULATORY COMMISSION
<
' " ',
,.S
'
REGION 11 o
- t
'j'
101 MARIETTA STREET,N.W.
,
AT LANT A, GEORGI A 30323
%,...../
'
Report No.: 50-348/90-06 and 50-364/90-06
' Licensee: Alabama Power Company i
600 North 18th Street Birmingham, AL 35291-0400 Docket Nos.: 50-348 and 50-364 License Nos.:
NPF-2 and NPF-8 Facility Name: _J. M. Farley Nuclear Plant P
Inspection Conducted:
February 20-23, 1990 Inspector:
3!r fe
W. Stansa rry,'Saf ards Inspector Dat Ki ned
3 [ 9/
' Approved by.
v.
,
D. R. McGuire, Chief Fatv5igned Safeguards Section Nuclear Material Safety and Safeguards
<
Division of Radiation Safety and Safeguards
'
SUMMARY-Scope:
This routine, unannounced inspection was conducted in the area of Physical Security Program for Power Reactors, specifically Management Support; Protected and Vital Area Barriers; Detection Aids; Assessment Aids; Lighting; Protected and~ Vital Area Access Control; Alarm Stations; Communications; Power Supply and Compensatory Measures.
Results:
In the areas inspected, violations were not identified.
One open item (89-18-02) was closed. The perimeter upgrade is not operational as-of this inspection.. The construction of the Secondary Access Portal is m
underway.
Management support and Security Force morale continue to be good.
The upgrade of the command consoles-for the Central and Secondary Alarm Stations.are ne,w completed.
9003200075 900309
'9 PER ADOCK 05000348 h
Q PDC g
, _ _ _
,
noonem trommitted hue.ch SAFEGU ARDS INFORMATiON
- .Waimwmtiveuncunmed
~
~,--o-
.~,= -a o.--et