Forwards Insp Repts 50-348/90-06 & 50-364/90-06 on 900220- 23.No Violations or Deviations Noted
ML20033F338
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/09/1990
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Hairston W
Alabama Power Co
Shared Package
ML20033F339 List:
References
NUDOCS 9003200072
Download: ML20033F338 (3)


See also: IR 05000348/1990006

Text

m-

1

4-

MATION'

S5FEGO~4RDS INFOR

<

,.;s

MAR 0 0 1990

"

t

i

Docket Nos. 50-348', 50-364

License Nos. NPF-2, NPF-8

.

Alabama Power Company-

ATTN: Mr. W. G. Hairston, III

>

Senior Vice President

Nuclear Operations

,

40 Inverness Center Parkway

'

P. 0. Box'1295

'

Birmingham, AL 35201

f

- Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/90-06 AND 50-364/90-06

l

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. Stansberry on February 20-23, 1990.- The inspection included a review of

activities authorized for your Farley Nuclear Plant. At the conclusion of the

1

inspection, the findings were discussed with those members of your staff

i

-

identified in the enclosed Inspection Report.

'

- Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures -

i

e

and representative records, interviews with personnel, and observation of'

i

activities in progress.

j

Within the scope of the inspection, violations or deviations were not

-

identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

- security measures are exempt from public disclosure. Therefore, the enclosure

!

to this le_tter with the exception of the report cover page, which presents a

!

nonexempt summary, will not be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

'

ORIGINAL SiONED BY

1

DAVID R. McGujpg

i

William E. Cline, Chief

i

Nuclear Materials Safety and

Safeguards Branch

,

Division of Radiation Safety

and Safeguards

Enclosure:

(See page 2)

4

\\

J8R2gggggggggge gm SAFEGUARDS INFORMATIOC_"ONMT

e

- ___

exknures, tnis oocument is oecor.us

.vj_

SAFEGUARDS INFORMATION

,.

1

"Alabinia Power Company'

2

.

NAR u 91990

Enclosure:

NRC Inspection Report

-

(SafeguardsInformation)

cc w/ encl:

B. L. Moore

~ Manager, Licensing

Alabama Power Company

?

~P. 0. Box 1295

Birmingham, AL 35201

R. P. Mcdonald -

-

Executive Vice President.

Alabama Power Company

'

P. O. Box 1295

Birmingham, AL 35201-

,

.J.-D. Woodard

Vice President

' Nuclear Farley Project

-Alabama Power Company

P

0- Box 1295

Birmingham, AL 35201

D. N. Morey

General Manager

Farley Nuclear Plant

Drawer 470-

,

-Ashford, AL 36312

cc w/ Inspection Summary:

Louis B. Long, General Manager

-Southern Company Services, Inc.

P. O. Box 2625

-Birmingham, AL 35202

- Claude -Earl Fox, M.D.

State Health Officer

State-Department of Public Health

' State Office Building

-

Montgomery, AL 36130

Chairman

Houston County Commission

Dothan, AL 36301

,

State of Alabama

'

bec w/ encl:

(See page 3)

,

~

~ ~"'~"~"' * " " ~ "

SAFEGU ARDS lNFORM ATION **- mee,"eo."< ~i

~

d

f

,

._

-

'

i;

' , ..

SAFEidUARDS 1NFORMATION

'

h

'AlabaYia Power Company

3

'

g gg g

j

'

i!

i.

bec w/ encl:

NRR/0RIS/SB.

-bec w/ Inspection Summary:

E. Reeves, NRR

,

Document Control Desk (RIDS IE04), 016

>

-NRC Resident Inspector-

s

<

5

F

-j.

,

,

bi

!

R/0 S/'

Wj

,

rearge,,

9H

re

03/J)9 fry:ser

03/7190

03/ 9 190

"~*

'

""~,*"""-

a-

Wfvm separated frmi

d

j

.

fiV

encn$ves, thts document 16 de

mf," naSm.

SAFEGUARDS INFony!gu.

.w-..,

-