Partially Withheld Physical Security Insp 50-346/93-22 on 931101-12 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Alarm Stations & Communications,Protected Area Barriers & Isolation Zone & Security Program Plans
ML20058G144
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/01/1993
From: Creed J, Pirtle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20058G136 List:
References
50-346-93-22, NUDOCS 9312090108
Download: ML20058G144 (1)


Text

_

,

..

,

,-

U.S. NUCLEAR REGULATORY COMMISSION I

,

REGION III

l t

Report No. 50-346/93022(DRSS)

Docket No. 50-346 License No. NPF-3 i

Licensee:

Toledo Edison Company

,

Edison Plaza 3M Madison Avenue

.i Toledo, OH 42652 l

l

!

Facility Name: Davis-Besse Nuclear Power Station Inspection Dates:

November 1-5,'1993 onsite i

November 10-12, 1993 at NRC Region III Office l

Type of Inspection: Announced, Physical Security Inspection I

,

Date of Previous Physical Security Inspection: January 11-15, 1993

Inspector:

"I MnAA

/m

/2kf3 Gary 1/firtle ~

F Dat e '

l

~

Physical Security Inspector

!

uh

/* / f3

-

Approved By.,

zm

, James R. Creed, Chief Date.

!

Safeguards and IRL Section

'!

Inspection Summary

.'

Inspection between November 1-12. 1993 (Report No. 50-341/93022(DRSS))

Areas Inspected:

Routine, announced physical security inspection involving i

Alarm Stations and Communications; Protected Area Barriers and Isolation Zone;

Security Program Plans and Audits; Protected Area Detection Assessment Aids;-

Protected Area Access Control of Personnel; Testing and Maintenance ; and i

Security. Training and Qualification.

'

Results:. The licensee was.found to be in compliance with NRC requirements.

'

within the areas examined. Equipment test results and equipment performance were generally very good, the exception being some elements of ~ the closed i

circuit television system (Refer to attachment for details). Observed weapons l

firi.ng at the offsite firing range were conducted in.a safe and proficient l

manner.- Housekeeping within the Personnel Processing Facility was excellent.

l Management' support for the security program continues to be good.

i e

'

At.tachment Contains S!JECUARDS UiFDPJ!!i?IDP

,

Upon Separation Thic

Page Is Decontrolled j

!

9312090108 931202 PDR-ADOCK 05000346

'