SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT - FOCUSED ENGINEERING INSPECTION (AGE-RELATED) REPORT 05000324/2025010 AND 05000325/2025010
Dear John A. Krakuszeski:
On September 25, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Brunswick Steam Electric Plant and discussed the results of this inspection with Jacob Cottle III - Acting Brunswick Engineering General Manager and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
Due to the temporary cessation of government operations, which commenced on October 01, 2025, the NRC began operating under its Office of Management and Budget-approved plan for operations during a lapse in appropriations. Consistent with that plan, the NRC operated at reduced staffing levels throughout the duration of the shutdown. However, the NRC continued to perform critical health and safety functions and make progress on other high-priority activities associated with the ADVANCE Act and Executive Order 14300. On November 13, 2025, following the passage of a continuing resolution, the NRC resumed normal operations.
However, due to the 43-day lapse in normal operations, the Office of Nuclear Reactor Regulation granted the Regional Offices an extension on the issuance of the calendar year 2025 inspection reports that should have been issued by November 13, 2025, to December 31, 2025. The NRC resumed the routine cycle of issuing inspection reports on November 13, 2025.
December 11, 2025 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Marcus A. Riley, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000324 and 05000325
License Numbers:
Report Numbers:
05000324/2025010 and 05000325/2025010
Enterprise Identifier:
I-2025-010-0035
Licensee:
Duke Energy Progress, LLC
Facility:
Brunswick Steam Electric Plant
Location:
South Port, NC
Inspection Dates:
September 08, 2025 to September 25, 2025
Inspectors:
P. Braxton, Reactor Inspector
D. Burgess, Reactor Inspector
T. Su, Senior Reactor Inspector
Approved By:
Marcus A. Riley, Chief
Engineering Branch 1
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a focused engineering inspection (age-related) at Brunswick Steam Electric Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.21N.04 - Age-Related Degradation Age-Related Degradation (8 Samples)
- (1) Portion of Service Water Building Concrete Submerged Under Seawater
- (2) Service Water Piping Including Underground Piping and Cathodic Protection
- (3) Unit 2 Core Spray Pump 2A
- (4) Unit 2 EDG2 Electrical Control System
- (5) Capacitors (Various Systems)
- (6) Unit 1 and Unit 2 ADS/SRV
- (7) NSW 2A Pump Motor
- (8) Unit 2 Inverter/UPS 2B
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On September 25, 2025, the inspectors presented the focused engineering inspection (age-related) results to Jacob Cottle III - Acting Brunswick Engineering General Manager and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Calibration
Records
BNP Buried Piper
Rectifier Data
BNP Buried Piper Rectifier Data
Rev 1
00483679,
00607846,
00737292,
2129416,
265786,
2321942,
2343883,
2372869,
265786,
2317682,
2321942,
2343883,
2317682,
253773,
2308597,
2320794,
2462552-01,
2499358,
Various
License Renewal Inaccessible Medium Voltage Cables not
Subject to 10 CFR 50.49 Environmental Qualification
Requirements Program Aging Management Program
Corrective Action
Documents
Action Request-
00553147
IN 2012-11, Age-Related Capacitor Degradation
8/3/2012
F-03003
4160 Emergency System Switchgear E3 & E4 Auxiliary
One Line Diagram Sheet 35
F-03027
20/208V - 50KVA Uninterruptible Power System
Single Line Diagram
F-09345
Diesel Generator No. 1 Circuits Control Wiring Diagram
Sheet 1
71111.21N.04
Drawings
F-09345
Diesel Generator No. 1 Circuits Control Wiring Diagram
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Sheet 3
F-09345
Diesel Generator No. 1 Circuits Control Wiring Diagram
Sheet 2
LL-09113
4160 Volt Switchgear E3 Compartment AJ3-Nuclear
service Water Pump 2A Control Wiring Diagram
LL-09113
4160 Switchgear E3 Compartment AJ3-Nuclear Service
water Pump 2A Cable Diagram Sheet 73
CTL PC 263563
Evaluation of Service Water Intake Structure
01/07/2022
Engineering
Evaluations
PMR 739070
Evaluation of updates to cathodic protection periodic
maintenance/monitoring
2554718
BNP Age Related Self-Assessment 2025
05/12/2025
3109538
Purchase Order
27795
Purchase Order
3139459
Purchase Order
3163295
Purchase Order
BNP 048-012
Specification for Installation of Electric Cables
Diesel Engine Instruction Manual
00T
Power Supply, Uninterruptible, Lighting and
Communications System
K
LTAM BNP-10-
210
SWB Bridging Strategy
Rev 1
Miscellaneous
NACE SP0169
Control of External Corrosion on Underground or
Submerged Metallic Piping Systems
05/08/2024
0-BNP-TR-60
License Renewal Structures Monitoring Program
10/4/2023
Buried Piping License Renewal Strategy
01/16/2024
Splicing of Wires and Cables Without Tape
AD-EG-ALL-1213
System Walkdowns
AD-EG-ALL-1615
Cable Aging Management Program - Implementation
AD-EG-BNP-
213
BNP Specific Requirements for System Walkdowns
AG-EG-BNP-
214
Condition Monitoring of Structures
Rev 4
Procedures
Service Water System
21
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Motors, Vertical Induction
00F
20106008-01,
20152170-04,
20152170-05,
20737753,
13468933-01,
20528653-01,
20566369-01,
20573072-01,
20743575-01,
20601157,
20482211,
20666702-01,
20460550-01,
20424020-01,
Various
20501504-01
Annual maintenance rule AD-EG-ALL-1214 inspection
11/07/2023
20549594-01
Annual maintenance rule AD-EG-ALL-1214 inspection
05/29/2024
Work Orders
20711386
Cathodic Protection Rectifier, Record
Voltage/Current
03/19/2025