IR 05000324/2025005
| ML25237A030 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 08/26/2025 |
| From: | Matthew Fannon NRC/RGN-II/DORS/PB2 |
| To: | Krakuszeski J Duke Energy Progress |
| References | |
| IR 2025005 | |
| Download: ML25237A030 (6) | |
Text
SUBJECT:
UPDATED INSPECTION PLAN FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - REPORT 05000324/2025005 AND 05000325/2025005
Dear John A. Krakuszeski:
The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for the Brunswick Steam Electric Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the ROP is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.
This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
August 26, 2025 Please contact me at 404-997-4547 with any questions you have regarding this letter.
Sincerely, Matthew S. Fannon, Chief Projects Branch 2 Division of Operating Reactor Safety Docket Nos.: 05000324, 05000325, and 07200006 License Nos.: DPR-62 and DPR-71 Enclosure:
Brunswick Inspection/Activity Plan (09/01/2025 - 06/30/2027)
cc w/ encl: Distribution via LISTSERV Signed by Fannon, Matthew on 08/26/25
SUNSI Review X
Non-Sensitive
Sensitive X
Publicly Available
Non-Publicly Available OFFICE RII/DORS RII/DORS NAME A. Wilson M. Fannon DATE 8/26/2025 8/26/2025
Site Inspection Activity Plan
Brunswick 09/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count FOCUSED ENGINEERING INSPECTION (AGE-RELATED)
1,2 9/8/2025 9/12/2025 IP 71111.21N.04 001832 Age-Related Degradation 1,2 9/22/2025 9/26/2025 IP 71111.21N.04 001832 Age-Related Degradation PROBLEM IDENTIFICATION AND RESOLUTION
1,2 10/6/2025 10/10/2025 IP 71152B 000747 Problem Identification and Resolution 1,2 10/20/2025 10/24/2025 IP 71152B 000747 Problem Identification and Resolution SECURITY BASELINE INSPECTION
1,2 10/27/2025 10/30/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 10/27/2025 10/30/2025 IP 71130.07 000739 Security Training SECURITY BASELINE INSPECTION
1,2 11/17/2025 11/20/2025 IP 71130.02 000734 Access Control 1,2 11/17/2025 11/20/2025 IP 71130.05 000737 Protective Strategy Evaluation 1,2 11/17/2025 11/20/2025 IP 71130.09 001656 Security Plan Changes 1,2 11/17/2025 11/20/2025 IP 71151 001338 Performance Indicator Verification RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION
1,2 2/2/2026 2/6/2026 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 3/9/2026 3/13/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 3/9/2026 3/13/2026 IP 71151 000746 Performance Indicator Verification UNIT 1 IN-SERVICE INSPECTION
1 3/16/2026 3/20/2026 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI)
1,2 5/4/2026 5/8/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2 5/18/2026 5/22/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection OPERATION OF AN ISFSI
1,2 5/11/2026 5/15/2026 IP 60855 Operation Of An ISFSI
Site Inspection Activity Plan
BRUNSWICK INITIAL EXAM 1,2 6/21/2026 6/27/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1,2 8/2/2026 8/15/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
EMERGENCY PREPAREDNESS EXERCISE INSPECTION
1,2 7/27/2026 7/31/2026 IP 71114.01 000716 Exercise Evaluation 1,2 7/27/2026 7/31/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 7/27/2026 7/31/2026 IP 71151 001397 Performance Indicator Verification SECURITY BASELINE INSPECTION
1,2 9/14/2026 9/17/2026 IP 71130.02 000734 Access Control 1,2 9/14/2026 9/17/2026 IP 71130.09 001656 Security Plan Changes 1,2 9/14/2026 9/17/2026 IP 71151 001338 Performance Indicator Verification BRUNSWICK REQUAL INSPECTION
1,2 9/27/2026 10/3/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance CYBER SECURITY INSPECTION
1,2 1/18/2027 1/22/2027 IP 71130.10 000741 Cybersecurity UNIT 2 IN-SERVICE INSPECTION
2 3/15/2027 3/19/2027 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
MATERIAL CONTROL AND ACCOUNTING
1,2 5/10/2027 5/14/2027 IP 71130.11 000742 Material Control and Accounting (MC&A)
Site Inspection Activity Plan
Brunswick 09/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count OPERATION OF AN ISFSI