IR 05000324/2025403

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000324/2025403 & 05000325/2025403
ML25328A082
Person / Time
Site: Brunswick  
Issue date: 11/25/2025
From: Jannette Worosilo
NRC/RGN-II/DFRSS
To: James Corbett
Duke Energy Progress
References
IR 2025403
Download: ML25328A082 (0)


Text

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1&2 - SECURITY BASELINE INSPECTION REPORT 05000324/2025403 AND 05000325/2025403

Dear Johnny Corbett:

On November 20, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Brunswick Steam Electric Plant, Units 1&2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000324 and 05000325

License Numbers:

DPR-62 and DPR-71

Report Numbers:

05000324/2025403 and 05000325/2025403

Enterprise Identifier:

I-2025-403-0022

Licensee:

Duke Energy Progress, LLC

Facility:

Brunswick Steam Electric Plant, Units 1&2

Location:

Southport, NC

Inspection Dates:

November 17, 2025 to November 20, 2025

Inspectors:

M. Denman, Physical Security Inspector

D. Egelstad, Physical Security Inspector

J. Justice, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Nuclear Security Branch

Division of Fuels, Radiological Safety, and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Brunswick Steam Electric Plant,

Units 1&2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following inspection elements:

Access Control (1 Sample)

(1)

  • Tier I: 02.01(a,b,c,d,e); 02.02 (a,b,c,d,e,f,g); 02.04(a,c), 02.05(a)
  • Tier II: 02.06(c); 02.08(c,e)
  • Tier III: 02.09

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:

Protective Strategy Evaluation (2 Samples)

(1)

  • Tier I: 02.01(b,c,d); 02.02(a,b,c,d,e,f); 02.04(b,d,e)
  • Tier II: 02.06(a,b,d,f,g,i,n); 2.07(a)
  • Tier III: 02.08; 02.09(a,b)
(2) Observed a licensee conducted Force on Force exercise.

71130.09 - Security Plan Changes

The inspectors evaluated the licensees security plan through completion of the following procedure elements:

Security Plan Changes (1 Sample)

(1) Since the last NRC baseline inspection of this program area, Brunswick Steam Electric Plant Security Plan, Revision 17, was implemented based on Brunswick Steam Electric Plant's evaluation, and in accordance with 10 CFR 50.54(p)(2), the changes resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those changes. Therefore, the changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) October 2024 - October 2025

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified that no proprietary information was retained or documented in this report.

  • On November 20, 2025, the inspectors presented the security baseline inspection results to Johnny Corbett and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

2546653

2576711

0AOP-40.0

Security Events

Revision 38

AD-EP-ALL-0112

Onsite Protective Measures

Revision 2

AD-SY-ALL-0110

Protection of Information Related to Nuclear Security

Revision 11

AD-SY-ALL-0210

Site Access Controls

Revision 13

AD-SY-ALL-0215

Security Search and Entry Processing

Revision 17

AD-SY-ALL-1000

Conduct of Security

Revision 15

AD-SY-BNP-0205

SOCA/EWAS Operations and Additional Measures

Revision 2

CSD-SY-BNP-

201-05

Security Alarm Stations

Revision 10

CSD-SY-BNP-

201-06

(BNP) Security Post Orders

Revision 8

Procedures

CSD-SY-BNP-

215-01

(BNP) Security Search and Entry Processing

Revision 16

71130.02

Self-Assessments

25 NRC Baseline Inspection - Access Controls, Physical

Security Plan Changes, Performance Indicator Verification,

Protective Strategy

10/16/2025

Corrective Action

Documents

2575038

2568273

2574771

2538669

2566706

Drawings

DWG F-03900-

001, Sheet 2

Revision 2

Local Law Enforcement Memoranda of Understanding

23 - 2025

White Paper on SA 2009

Revision 2

Various Security Force on Force Drill and Exercise

Documentation

23 - 2025

Miscellaneous

AD-SY-BNP-0201

Security Operations

Revision 5

71130.05

Procedures

Procedures

AD-SY-BNP-0251

Contingency Response

Revision 4

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AD-SY-BNP-0254

(BNP) Protective Strategy

Revision 9

AD-SY-BNP-0260

Security Compensatory Measures

Revision 3

71130.05

Brunswick Nuclear Plant Security Blast Calculation

7/2016 and

2/2020

Brunswick Steam Electric Plant Physical Security Plan

Revision 17

71130.09

Procedures

AD-SY-ALL-0170

Security Program Reviews, Screening and Evaluations

Revision 7

71151

Procedures

AD-SY-ALL-0150

Security Event, Fitness for Duty Event, and Suspicious

Activity Notifications, Reports and Recordkeeping

Revision 9