SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1&2 - SECURITY BASELINE INSPECTION REPORT 05000324/2025401 AND 05000325/2025401
Dear Sam Santaniello:
On January 29, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Brunswick Steam Electric Plant, Units 1&2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000324 and 05000325
License Numbers:
Report Numbers:
05000324/2025401 and 05000325/2025401
Enterprise Identifier:
I-2025-401-0042
Licensee:
Duke Energy Progress, LLC
Facility:
Brunswick Steam Electric Plant, Units 1&2
Location:
Southport, NC
Kings Mountain, NC
Inspection Dates:
January 13, 2025 to January 16, 2025 (Kings Mountain, NC)
January 27, 2025 to January 29, 2025 (Southport, NC)
Inspectors:
J. Justice, Senior Physical Security Inspector
R. Patterson, Senior Physical Security Inspector
J. Stovall, Physical Security Inspector (Training)
Approved By:
Jannette G. Worosilo, Chief
Nuclear Security Branch
Division of Fuels, Radiological Safety, and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Brunswick Steam Electric Plant,
Units 1&2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.01 - Access Authorization
The inspectors evaluated the access authorization program. The following elements were evaluated:
Access Authorization
(1)
- Tier I: All Requirements
- Tier II: All Requirements
- Tier III: All Requirements
71130.08 - Fitness-For-Duty Program
The inspectors evaluated the fitness for duty program by completing the following inspection
elements: Fitness-For-Duty Program
(1)
- Tier I: All Requirements
- Tier II: (02.05 a-l, 02.06 a-g, 02.07, 02.08, 02.09 a, b, c, d)
- Tier III: (02.10, 02.11 a, 02.12 a, 02.14 a, b, c)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On January 29, 2025, the inspectors presented the security baseline inspection results to Sam Santaniello and other members of the licensee staff.
- On January 16, 2025, the inspectors presented the Kings Mountain corporate inspection results to Teddy Reed and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
2540300
2540899
Miscellaneous
Various Self-Screener Audits
Miscellaneous
Various Access Authorization Personnel Records
Procedures
AD-SY-ALL-0301
Nuclear Worker Unescorted Access Authorization Program
Revision 11
Procedures
AD-SY-ALL-0310
Access Authorization Processing
Revision 11
Procedures
AD-SY-ALL-0320
Personnel Access Data System (PADS)
Revision 5
Procedures
AD-SY-ALL-0340
Access Authorization Training and Qualification Program
Revision 3
Procedures
AD-SY-ALL-0350
Reviewing
Officials
Guidance for
Access
Authorization
Revision 4
Reviewing Officials Guidance for Access Authorization
Revision 4
Revision 4
Procedures
AD-SY-ALL-0370
Access Processing of Foreign Nationals
Revision 4
Self-Assessments
2411430-05
22 PADS Self-Assessment
05/19/2022
Self-Assessments
2432397-05
Psychological Testing
07/05/2022
Corrective Action
Documents
2532174,
2521189,
2439065,
2116953,
2416381,
2415751
Miscellaneous
Generic Fitness For Duty and Behavioral Observation
Lesson Plan
Revision 4
Miscellaneous
23 NRC Fitness For Duty Program Performance Data
Report
Miscellaneous
22 NRC Fitness For Duty Program Performance Data
Report
Procedures
AD-SY-ALL-0110
Protection of Information Related to Nuclear Security
Revision 10
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
AD-SY-ALL-0405
Fitness For Duty Violations
Revision 6
Procedures
AD-SY-ALL-0410
Fitness for Duty Drug and Alcohol Collections
Revision 7
Procedures
AD-SY-ALL-0415
Fitness For Duty Blind Performance Testing Procedure
Revision 5
Procedures
AD-SY-ALL-0420
Fitness for Duty Unscheduled Call Out
Revision 2
Procedures
PY-SY-ALL-0004
Fitness For Duty Policy
Revision 3