W:

-

,

,J

[p

  • %

UNITED STATES

t, NUCLEAR REGULATORY COMMISSION

,,'g

$

s, E REGION ll

/[

101 MARIETTA sT., N.W., sulTE 3100 j

V ATLANTA, GEORGIA 30303 g

Report Nos. 50-324/80-26 and 50-325/80-29 Licensee: Carolina Power and Light Company

'

411 Fayetteville Street Raleigh, NC 27602 Facility Name: Brunswick Units 1 and.2 Docket Nos. 50-324 and 50-325 License Nos. DPR-62 and DPR-71 Inspection at Brunswie site near So hpo t, NC Inspector:

7 25, m

J. E. Ouztk

_"."'

,7.

V Date $ip,ned Approved by:

,

%

lh h

,

P. J. Kelfoggg h io lei, xUNS Branch D/t6 Sig'ned o

V{

SUMMARY Inspection on June 1-30, 1980 Areas Inspected This routine announced inspection involved 104 inspector-hours onsite in the areas of control room observations, Unit I refueling operations, review of plant logs, tour of vital areas, physical security, radiation protection, beusekeeping and cleanliness, fire protection, review and followup on licensee event reports.

Unit 1 Areas Inspected This routine inspection by the resident inspector involved 54 manhours of inspec-tion time onsite in the nine areas identified above.

Unit 1 Findings Of the nine areas inspected, no apparent items of noncomplinace or deviations were identified.

Unit 2 Areas Inspected This routine inspection by the resident inspector involved 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> of inspection

.

time onsite in the nine areas identified above.

Unit 2 Findings Of the nine areas inspected, no apparent items of noncomplinace or deviations were observed.

!

1009150375

.:

bk DETAILS 1.

Persons Contacted

.

Licensee Employees A. C. Tollison,' Plant General Manager J. M. Brown, Operations Manager K. E. Enzor,. Maintenance Supervisor, I&C G. T. Milligan, Maintenance Manager J. A. Padgett, QA and Safety Director W. M. Tucker, Administrative and Technical Manager L. V. Wagoner, Engineering Supervisor Other licensee emplovees contacted included three technicians, twelve oper-ators, eight securit) force members, and two office personnel.

Other Organizations Army Corps of Engineers - Wilmington, North Carolina - F. Yelverton called regarding oil spill analysis for Cape Fear River.

  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on June 13 and 27, 1980, with those persons indicated in Paragraph 1 above.

3.

Licensee Action on Previous Inspection Findings Not inspected.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

The resident inspector conducted plant tours, performed surveillance of plant operations and inspected plant conditions as identified below:

i a.

Control Room Observations b.

Unit 1 Refueling Floor Refueling Operations c.

Operator Log Review d.

Tour of Vital Areas e.

Physical Security Protection f.

Radiation Protection g.

Fire Protection h.

Housekeeping and Cleanliness

-

,

-

-

,

p

_

e

.

  • 's a

.. g

.y^

.

'Q -

_2

~

6.

Acceptance Criteria-The inspector used one 'or more _of the following sources of acceptance cri-

~

teria for evaluating the'above areas inspected:

,,

a.

.10.CFR 50, Appendix "B"

-

b.

10 CFR 20 c.

. Technical Specification d.

ANSI N45.2.3 (1971)

e.

ANSI N18.7 0972)

- f.

Regulatory Guiles-g.

Safe Security Plan h.

Quality Assurance Program

.

l

.y' -

.

J i

i f

% -

I b

s l'

e

.

E

_ _

..

-

'J

>