IE Insp Repts 50-324/80-06 & 50-325/80-06 on 800124.No Noncompliance Noted.Major Areas Inspected:Assessment of Effect on Plant Safety Re Implementation of near-term Items Presented in NUREG-0660
ML19344D717
Person / Time
Site: Brunswick  
Issue date: 03/17/1980
From: Kellogg P, Robert Lewis, Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19344D712 List:
References
50-324-80-06, 50-324-80-6, 50-325--80-06, 50-325--80-6, NUDOCS 8004280057
Download: ML19344D717 (3)


Text

- - - - - -

.

-. -... _ _. -.

..

/

A UNITED STATES

'n NUCLEAR REGULATORY COMMISSION

a REGION 11

"

o 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303

.....

Report Nos. 50-324/80-06 and 50-325/80-06 Licensee:

Carolina Power and Light 411 Fayetteville Street Raleigh, North Carolina 27602 Docket Nos. 50-324 and 50-325

,

,

License Nos. DPR-62 and DPR-71 Inspection at Brunswie Nuclear Station near Southport, South Carolina

-

Inspector: _[ 6.1

.3//Mf7)

n,,4 R. C. LewAF

' Da'te Signed Accompanying Personnel:

G. Madsen J. Hannon T. J. Donat Approved by:

/7 P. J. Ke'11ogg, Section $hief, RONS Branch Date Signed SUMMARY Inspection on January 24, 1980 Areas Inspected This special, announced inspection involved 50 inspector hours onsite for the purpose of obtaining Carolina Power and Light Company management and operating staff assessment of the effect on plant safety regarding implementation of the near term operating license action items presented in NUREG 0660 (draft).

Results

!

Of the areas discussed, no apparent items of noncompliance or deviations were identified. The licensee, both management and operating staff, provided signi-ficant comments on the scope and implementation dates for the numerous items in the draft NUREG. Safety concerns were expressed regarding over prioritizing of licensees efforts by the NRC and the heavy impact on limited industry resources.

1

f 8004280O 5 7

.

b DETAILS 1.

Persons Contacted Licensee Employees Present at the Meeting W. B. Kincaid, Vice President, Power Plant Engineering B. 7. Furr, Vice President, Nuclear Power Operations P. W. Howe, Vice President, Technical Services

,,

A.'C. Tollison, Station General Manager, BSEP S. R. Zimmerman, Manager, Licensing and Permits C. S. Bohanon, Principle Specialist, Regulatory Compliance D. B. Waters, Principle Engineer-Special Projects J. M. Brown, Operations Manager, BSEP

.

J. A. Padgett, Director Nuclear Safety & QA, BSEP W. M. Tucker, Manager Training & A, BSEP S. Aimmerman, Manager Training & A, Robinson B. Parks, TMI-Site Project Manager, BSEP Other licensee employees contacted included 4 operators and a representative for the shift technical advisors.

Other Organizations G. C. Wallace - UE&C Operations Startup Engineer NRC Resident Inspector M. Davis 2.

Exit Interview The meeting was conducted on January 24, 1980, with those persons listed in Paragraph I above. The purpose of the meeting was to discuss with the licensee the NRC action plans for near term operating licenses (NTOL), that were developed as a result of the TMI-2 accident - NUREG 0660 (Draft). Also, to hear the licens.ee's assessment of what impact these NTOL prerequisites would have on them, if they were not already a licensed facility and to get their assessment of the items relative to safety., Three separate meetings were held, one with CP&L management, one with licensed operators and one with a representative of the shift technical advisors.

The licensee responded with questions and comments during the meeting.. Concern was expressed by the licensee that the high degree of prioritizing of their effort to implement NRC requirements since the THI-2 accident and the heavy impact on the licensees and industry resources may have a negative impact on safety. Also, that the NRC had grossly underestimated the resources required to implement the action plan it'ess.

The licensee was informed that their comments would be presented to the NRC Action Plan Committee.

i

!

-

- - -

.-.-

__

_... - -

- - -

_

_

.

.

.

-2-

.

3.

Licensee Action on Previous Inspection Findings

-

Not inspected.

4.

Unresolved Items No unresolved items were identified.

/

.

@

- -..

- - - -

- -

- - - - -.

--