IE Insp Rept 50-323/78-17 on 781218-21.No Noncompliance Noted.Major Areas Inspected:Previous Insp Findings,Emergency Procedures,Radiation Protection Staffing,Respiratory concerns,10CFR & SNM License Requirements
ML16340A394
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 02/21/1979
From: Book H, Fish R, North H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML16340A393 List:
References
50-323-78-17, NUDOCS 7903260082
Download: ML16340A394 (12)


Text

0 Report No' 50-323/78-17 U. S.

NUCLEAR REGULATORY CO>MISSION OFFICE OF INSPECTION AND ENFORCE>EVZ

REGION V

Docket No. 50-323 License No.

CPPR-69 Safeguards Group Licensee:

Pacific Gas and Electric Company 77 Beale Street San Francisco, California 94106 Faci1ity Name:

Diablo Canyon Unit 2 Inspection at:

.San Luis Obispo County Inspection conducted~

December 18-21, 1978 Inspectors:

H.

orth, Ra iatio Specialist R.

F. Fish, Radiation Specialist 2 /4 ate Sign'ed Date Signed Approved By:

Summary:

H.

E. Book, Chief, Fuel Facility and Materials Safety Branch Date Signed z>

7~j Date Signed Ins ection on December 18;21, 1978 Re ort No.

50'-323 78-17 P

"

'

"

"

'

planning, tests and drills; radiation protection staffing, respiratory protection, procedures, neutron monitoring; radioactive waste measurement gC, iodine monitoring; Title 10 requirements; inspection of SNM license; bulletins and circulars; and plant tour.

The inspection involved

inspector-hours onsite by two inspectors.

Results:

No items of noncompliance or deviations were identified.

7 9038600g2.

RV Form 219(2')

IL, II I

DETAILS Persons Contacted

  • R. Ramsay, Plant Superintendent
  • J. Giscoln, Senior Power Production Engineer
  • H. O'ara, Chemical and Radiation Protection Engineer
  • J. Diamonon, Q.C. Supervisor T.

Mar tin, Shift Foreman, Training Coordinator S. Fridley, Assistant Training Coordinator

  • J. Sumner, Startup Engineer, Unit 1, Q.C.
  • M. Leppke, Q.A. Supervisor
  • Denotes those present at the exit interview.

Licensee Action on Previous Ins ection Findin s

(Closed)

Unresolved item (50-323/78-05):

FSAR section 6.2.5 and figure 6.2-15 have been amended to show the use of silver zeolite or charcoal absorbers in the containment hydrogen purge system rather than charcoal.

The system was installed with a silver zeolite absorber.

This item is considered closed.

Emer enc Plannin

- Tests and Drills The licensee plans to conduct a test or drill of the emergency plan shortly before Unit 1 fuel loading.

Ho items of noncompliance or, deviations. were "identified.

Radiati.on Protection - Staffin The Radiation and Process Monitor (RPM) selection to bring the staff to a total of eight has been completed.

At the time of the inspection, training of the additions to the staff was approximately 50/ complete.

Three additional positions for RPM's have been announced and selection is in progress.

This will raise the RPM staff to a total of eleven.

No items of noncompliance or deviations were identified.

Radiation Protection - Res irator Protection The inspector discussed and reviewed the procedures developed by the licensee for the implementation of a respiratory protection program.

The procedures consist of Radiation Control Standards (RCS) issued by the Manager, Steam Generation Department, for

company wide implementation and Radiation Control Procedures (RCP)

and Administrative Procedures (AP) issued by the Plant Superintendent for implementation at Diablo Canyon.

The procedures prepared in support of the respiratory protection program are as follows:

RCS No.

RCS No.

RCS No.

RCS No.

AP B-251 RCP D-4 RCP G-3 RCP G-8 RCP G'-9 RCP G-10 RCP S-l Internal Exposure Controls Control of Access Medical Radiation Monitoring Respirator Training Program Respiratory Protection Equipment Cleaning and Inspection at Diablo Canyon Power Plant Internal Exposure Control Measurement of Airborne Radioactivity Use of Respiratory Equipment for Protection Against Airborne Radioactive Materials Use of Constant Flow Air Line Respirators at Diablo Canyon Power Plant Plant Airborn'e Radioactive Surveillance The inspector verified that the procedures appropriately addressed the following sections of Regulatory Guide 8.15, Sections C.1-5 and 7, and six of the "additional technical items" in Section C-8.

Section C-6 relates to the use of equipment for which no schedule of approval has been established.

The licensee has not proposed the use of such equipment.

The licensee has purchased repair and test equipment from the respirator equipment supplier.

The supplier's-representative will train licensee personnel in respiratory equipment repair and main-tenance.

A total of approximately 25 SCBA devices will be available for emergency fire and control room use and in support of radiation protection activities.

No items of noncompliance or deviations were identifie Radiation, Protection - Procedures The inspector examined the following Radiation Control Standards during the inspection:

No.

Personnel Exposure No.

Personnel Contamination Control No.

Control of Radioactive llaterials.

No items of noncompliance or deviations were identified.

Radiation Protection Neutron Monitor'in The inspector discussed the licensee's plans for personnel neutron monitoring.

Film badges containing NTA film and neutron pocket ionization chambers will be used.

Rem meter surveys and stay time calculations will also be used.

After operations begin, the licensee may retain a consultant for containment neutron energy measurements to relate rem meter and personnel dosimeter response.

No items of noncompliance or deviations were identified.

Radioactive Maste - f1easurement

.C. - Audits Inspection Report 50-323/78-05 noted that the plant laboratory had been designated as a "Approved Laboratory" by the State of California in support of the analytical requirements'f the NPDES permit.

The licensee submitted a company wide analytical measurement g.A.

program to the State of California which addresses personnel qualifi-cations, records and record retention, measurements and analyses (restricted to EPA approved'tests,and-methods)

and instrumentation (type, and response to off-normal operation and maintenance).

The Sanitation and Radiation Laboratory, California State Department of Health.

has approved the plant laboratory for all analyses required by the NPDES permit with the exception of cyanide.

The approved laboratory g.A. program, which requires duplicate or spike sample analysis on every tenth sample, has been implemented.

Audit No.

81019,

"D.C.P.P.

Chemistry Laboratory g.A. Program for NPDES Permit,

"November 8-10, 1978, evaluated the existing g.A. program and determined the degree of implementation.

The audit identified a number of items for which corrective actions were required.

Cor-rective action had been completed and verified on all items.

No items of noncompliance or deviations were identifie The inspector verified through discussions with the licensee that channel 2-R-24, Plant Vent Iodine Monitor, incorporates a

Compton background subtraction capability to reduce the possibility of false high iodine values.

During a plant tour, the inspector observed that the sample line to the Plant Vent Iodine tlonitor (2-R-24)

had been lagged.

IE Inspection Report 50-323/77-10 reported that this line-had been heat traced but not lagged.

Ho items of noncompliance or deviations were identified.

10.

Title 10 Re uir ements - Procedures The inspector examined RCS No. 9, Notices, Instructions, and

~R If h;~NRRI I, tfh p Iff

'

q ments contained in 10 CFR 19. 11, 19. 12, 19. 14 and 19.15 and RCS N.p ~pi

~hi

<<hfh p Iff* h qf contained in 10 CFR 19.13.

Ho items of noncompliance or deviations were identified.

11.

Ins ection of SNl1 License IE Inspection Report 50-275/78-13 for Unit 1 reported that an inspection of License SHtl-1667, which authorizes fuel receipt and storage at Unit 2 had been conducted.

No items of noncompliance or deviations were identified.

.12.

Licensee Action on IE Bulletins and Circulars The inspector examined records and inter viewed licensee personnel concerning the following Bulletins and Circulars:

Bulletin 78-07:

The licensee revised Radiation Control Standard No.

2 to reflect the recommended changes in the respiratory protection program.

Ho response to this Bulletin was required.

This item is closed.

Bull,etin 78-08:

(Reference IE Inspection Report 50-275/78-13, Paragraph 10).

Licensee correspondence concerning the evaluation addressed the following areas:

added shielding, guillotine break, access control and control of scattered radiation.

Ho

'esponse to this Bulletin was required.

This item is closed.

'hq P

-5-r Circular 77-14:

The licensee reviewed the systems and designs and concluded that the system design precluded the contamination of uncontaminated water systems.

The review and conclusions were documented.

This item is closed.

Circular 78-03:

Packaging of greater than type A quantities of LSA material for transport was discussed at a Plant Staff Review Committee meeting.

Radiation Control Standard No.

was reviewed to be responsive to this Circular.

This item is closed.

Ho items of noncompliance or deviations were identified.

13.

Plant Tour The inspectors toured portions of the plant including auxiliary building, fuel handling and ventilation area, liquid, solid and gaseous waste processing, storage areas and control r'oom.

No items of noncompliance or deviations were identified.

14.

Exit Interview It The inspectors met with the licensee, representatives (denoted in Paragraph 1) at the conclusion of the inspection on December 21, 1978.

The licensee was informed that no items of noncompliance had

'een identified.

The inspectors summarized the scope of the in-spection and the findings.

The licensee stated his intent to conduct a test or drill of the emergency plan prior to fuel loading of Unit 1 and agreed to inform the inspector of the test or drill schedule dat f