Category:CORRESPONDENCE-LETTERS
MONTHYEARML16341D1311999-10-15015 October 1999
[Table view]Discusses Arrangements Made During 991013 Telephone Conversation for Administration of Licensing Exams at Diablo Canyon Power Plant Facility During Wks of 990410 & 990417. Requests Submittal of Ref Matls by Jan 15,2000 ML16341D1291999-10-14014 October 1999 Forwards Insp Repts 50-275/99-15 & 50-323/99-15 on 990920- 24.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML16342B9961999-10-0606 October 1999 Refers to OI Investigation 4-1998-029 in Response to Complaints from Shift Foreman of Alleged Retaliation for Reporting Safety Concerns.Allegations Not Substantiated ML16342A9081999-09-30030 September 1999 Informs That Staff Review of Util 980327 Response to GL 96-06, Degradation of SG Internals, Did Not Identify Any New Concerns & Concludes That Util Response to GL Provides Reasonable Assurance That Conditions of SG Compliant ML16342A9111999-09-29029 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & Pse&G Responses for Diablo Canyon NPP ,990701 & 990923.Informs That Staff Reviewed Responses & Concluded That All Requested Info Provided.Considers GL 98-01 Closed for Diablo Canyon IR 05000275/19990071999-09-29029 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/99-07 & 50-323/99-07 on 990727 ML16342A9091999-09-29029 September 1999 Forwards SER Granting Requests for Relief NDE-12.2R8, NDE-13-2R8,NDE-14.2R8,NDE-22.2R8 & NDE-25.2R8 Pursuant to 10CFR50.55a(g)(6)(i) for Second 10-year ISI Interval for Diablo Canyon,Unit 2 ML16342A8981999-09-20020 September 1999 Requests That PG&E Update ERDS Dpls Submitted in to Provide Missing Info ML16342B9901999-09-20020 September 1999 Forwards SE Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML16342A9011999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Diablo Canyon & Did Not Identify Any Areas in Which Performance Warranted Add Insp Effort Beyond Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next 7 Months ML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML16342A8881999-08-25025 August 1999 Forwards Insp Repts 50-275/99-13 & 50-323/99-13 on 990802- 06.No Violations Noted.Purpose of Insp,To Review Solid Radioactive Waste Mgt & Radioactive Matls Transportation Programs ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML16342C1331999-08-11011 August 1999 Ack Receipt of Transmitting Rev 3,change 18 to Diablo Canyon Nuclear Power Plant Emergency Plan ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML16342A8751999-07-30030 July 1999 Forwards Insp Repts 50-275/99-10 & 50-323/99-10 on 990529-0710.Four Violations Being Treated as Noncited Violations ML16342A8691999-07-29029 July 1999 Forwards Insp Repts 50-275/99-08 & 50-323/99-08 on 990628-0702.No Violations Noted.Radiological Environ & Meterological Monitoring Sys Were Effectively Implemented ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML16342A8661999-07-26026 July 1999 Advises That 981021 Application for Amends to Licenses DPR-80 & DPR-82 to Modify TS Re Voltage & Time Delay Setpoints for First Level Undervoltage Relays & Second Level Undervoltage Relays Being Treated as Withdrawn ML16342A8541999-07-15015 July 1999 Submits Summary of 990701 Meeting with Util in Region IV Ofc to Discuss Performance of Different Groups During Refueling Outage 1R9 & Plans for Continued Performance Improvement ML16342A8461999-06-30030 June 1999 Discusses Closeout of Responses to RAI Re GL 92-01,Rev 1, Suppl 1, Rv Structural Integrity, for Plant,Units 1 & 2 ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address IR 05000275/19990061999-06-25025 June 1999 Forwards Insp Repts 50-275/99-06 & 50-323/99-06 on 990418-0529.Two Violations Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy ML16342A8381999-06-21021 June 1999 Forwards Corrected Pages (Page 2 of Transmittal Ltr,Pages 3, 7,8,11,12,21,25,28 & 29 of Safety Evaluation & Pages 2,3 & 4 of Table 1 Attached to SER) Re Util 981015 Second 10-year Interval Inservice Insp Program Plan DCL-99-081, Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl1999-06-18018 June 1999 Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl ML16342A8271999-06-16016 June 1999 Announces Corrective Action Program Insp at Plant,Units 2 & 2,reactor Facilities on 990726-30.Insp Will Evaluate Effectiveness of Activities for Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations ML16342A8151999-06-0909 June 1999 Ack Receipt of Ltr Dtd 990312,which Transmitted Change 16, Rev 18 to Physical Security Plan for Diablo Canyon Under Provisions of 10CFR50.54(p).No NRC Approval Required ML16342A8081999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan Implementing Procedures EP G-1,Emergency Classifications & EP Activation, Rev 27,under Provisions of 10CFR50,App E,Section V ML16342A8061999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon NPP Er Plan Implementing Procedures,Ep G-1, Emergency Classification & Ep,Activation,Rev 28,under 10CFR50,App E,Section V Provisions.No NRC Approval Required ML16342C1221999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan,Rev 3,Change 17, Under Provisions of 10CFR50,App E,Section V ML16342C1211999-06-0303 June 1999 Refers to 990602 Meeting with Util in Arlington,Tx Re Planned Electrical Configuration for Refueling Outage 2R9 During Midloop Operation.List of Attendees & Handouts Used by Util Encl ML16342A8021999-06-0303 June 1999 Ack Receipt of Ltr in Response to Request for Addl Info Contained in Ltr to Ruger ,which Forwarded NRC Insp Repts 50-275/98-201 & 50-323/98-201. Actions Described in Ltr Responsive to NRR Concerns ML13319B1431999-06-0202 June 1999 Responds to Comment Made by P Gunter at 990413 Reactor Decommissioning Public Meeting Re New Info Coming Out of Kobe & Northridge Earthquakes by Providing Info on Seismic Design,Procedures & Analyses Used by NRC & NPPs ML16342A7981999-05-27027 May 1999 Forwards Several Documents That Describe Recent NRC Policy Development in Oversight of Safety Cultures as Result of Millstone Experience Per Request ML16342A7951999-05-25025 May 1999 Informs of NRR Reorganization Effective 990328 & That as Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML16342A7891999-05-14014 May 1999 Forwards Insp Repts 50-275/99-04 & 50-323/99-04 on 990307-0417.Four Violations Identified & Being Treated as non-cited Violations ML16342A7861999-05-14014 May 1999 Submits Summary of 990423 Meeting in San Luis Obispo,Ca to Discuss Results of Ppr,Completed on 990211.List of Attendees & NRC Presentation Slides Encl ML16342C1141999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407 to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheets & Results to Appropriate Individuals ML16340C2241999-05-0303 May 1999 Forwards Insp Repts 50-275/99-02 & 50-323/99-02 on 990405-09.No Violations Noted.Insp Used Annual Licensed Operator Requalification Exams to Assess Licensed Operator Performance ML16342A7681999-04-15015 April 1999 Ack Receipt of 990326 Response to NRC 990216 Request for Written Response to Explain Why Greater than 5 Percent Post Exam Changes to Test Questions Were Needed & What Actions Taken to Prevent Recurrence.Finds Reply Acceptable ML16342A7691999-04-14014 April 1999 Requests That First Page of Ltr Transmitting NRC Insp Repts 50-275/99-03 & 50-323/99-03 Be Replaced with Encl Page. Initial Transmittal Contained Minor Editorial Error ML16342A7571999-04-0808 April 1999 Forwards SER Accepting Util Emergency Core Cooling Sys Manual & Automatic Switchover from Refueling Water Storage Tank to Containment Sump for Diablo Canyon Power Plant ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 IR 05000275/19990031999-04-0505 April 1999 Corrected Ltr Forwarding Insp Repts 50-275/99-03 & 50-323/99-03 on 990124-0306.Minor Editorial Error Corrected on First Page ML16342C1101999-04-0505 April 1999 Forwards Copy of FEMA Final Rept for 981204 Diablo Canyon Power Plant Medical Drill.Rept Indicates That There Were No Deficiencies & Two Areas Requiring C/A Identified During Drill DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) ML16342C1091999-03-30030 March 1999 Forwards Plant Issues Matrix That Was Inadvertently Omitted from PPR for Plant Facility.Encl 1 to PPR Requested to Be Replaced ML16342A7401999-03-25025 March 1999 Forwards Insp Repts 50-275/99-01 & 50-323/99-01 on 990215-26 at Diablo Canyon Npp.No Violations Noted.Purpose of Insp Was to Complete Evaluation of Welding & Welding Insp Program at Diablo Canyon NPP ML16342A7381999-03-23023 March 1999 Refers to PG&E SG 90-day Rept, 90-Day Rept for Voltage- Based Alternate Repair Criteria - Unit 2 Eighth Refueling Outage, Dtd 980628.Forwards SE Concluding PG&E Implemented voltage-based Criteria in Accordance with Licensing Basis ML16342C3241999-03-19019 March 1999 Advises of NRC Planned Insp Effort Resulting from Plant PPR Completed on 990211 for Period 980510-990125,to Develop Integrated Understanding of Safety Performance.Historical Listing of Plant Issues & Details of Insp Plan Encl 1999-09-30 Category:NRC TO UTILITY MONTHYEARML16341F8831990-11-0909 November 1990
[Table view]Forwards Insp Repts 50-275/90-23 & 50-323/90-23 on 900902- 1013.No Violations Noted ML16341F8871990-11-0808 November 1990 Forwards Mgt Meeting Repts 50-275/90-26 & 50-323/90-26 on 901105 ML16341F8721990-11-0808 November 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/90-16 & 50-323/90-16 ML16341F8661990-10-25025 October 1990 Forwards Insp Repts 50-275/90-24 & 50-323/90-24 on 900917-1005.No Violations or Deviations Noted.Some Maint Procedures Could Be Improved.Detail Examples in Encl Rept ML20058B5331990-10-22022 October 1990 Forwards Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-28.Licensee Identified Violations Reviewed But Not Cited ML16341F8611990-10-19019 October 1990 Forwards Insp Repts 50-275/90-25 & 50-323/90-25 on 900917-1016.No Violations Noted ML16341F8501990-10-16016 October 1990 Advises That Rev 3,Change 10 to Emergency Plan Meets Stds in 10CFR50.47(b) & Requirements of 10CFR50,App E IR 05000323/19900131990-10-0202 October 1990 Ack Receipt of 900813 & 0919 Responses to Violations Noted in Insp Rept 50-323/90-13 Re Signature Responsibility ML16342B7011990-09-25025 September 1990 Advises That Presentation of Certificates to Licensed Operators Scheduled for 901012 ML16341F8411990-09-24024 September 1990 Forwards Insp Repts 50-275/90-19 & 50-323/90-19 on 900722- 0901.No Violations Noted.Mgt Meeting Will Be Scheduled ML16341F8051990-09-0707 September 1990 Forwards Insp Repts 50-275/90-20 & 50-323/90-20 on 900813-17.No Violations Noted ML17083C3061990-08-31031 August 1990 Forwards Insp Repts 50-275/90-21 & 50-323/90-21 on 900813-17.One Noncited Violation Noted ML16341F8101990-08-28028 August 1990 Advises That Objectives & Scenario Manual Acceptable for 901003 Emergency Preparedness Exercise,Per 900702,03 & 05 Requests ML17083C2931990-08-13013 August 1990 Forwards Insp Repts 50-275/90-15 & 50-323/90-15 on 900610-0721.No Violations Noted.Weaknesses Identified ML16341F7781990-08-0202 August 1990 Discusses Generic Fundamentals Exam on 900606 & Forwards Exam Form W/Answers & Results ML16341F7771990-07-31031 July 1990 Discusses Investigation Case 5-89-012 Re Activities Under Licenses DPR-80 & DPR-82.Investigation Involved Concerns Associated W/Deficient Vendor Audits & Interview of Personnel.No Willful Violations Identified ML16341F7791990-07-30030 July 1990 Reviews 60-day Response to Generic Ltr 88-20 Re Individual Plant Exams for Diablo Canyon Units 1 & 2 ML16342B6921990-07-27027 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/90-01 & 50-323/90-01.Enforcement Item 275/90-01-01 Withdrawn Based on Addl Info Provided in ML16341F7691990-07-13013 July 1990 Forwards Insp Repts 50-275/90-13 & 50-323/90-13 on 900422- 0609 & Notice of Violation IR 05000275/19900081990-07-13013 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/90-08 & 50-323/90-08 ML17095A5601990-06-29029 June 1990 Forwards Ltr to Rc Mcdiarmid That Transmits Directors Decision DD-90-3 Issued on 900614,per 10CFR2.206.Notice of Issuance Also Encl.W/O Encls ML17083C2621990-06-14014 June 1990 Forwards Notice of Violation Re Antitrust License Conditions (6),7(a),7(d) & 9(a).Directors Decision Also Encl ML20059M9781990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML16341F7401990-06-12012 June 1990 Forwards Rept Re NRC Review of Plant long-term Seismic Program.Rept Describes Some Reanalysis Performed on Augmented Data Base ML16341F7361990-06-0707 June 1990 Grants Temporary Waiver of Compliance from Tech Spec 3.3.1 Requirement Re Reactor Coolant Pump Underfrequency Reactor Trip Instrumentation,Per 900601 Request IR 05000275/19900021990-06-0505 June 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/90-02 & 50-323/90-02.Actions Will Be Verified During Future Insp ML16341F7241990-05-25025 May 1990 Forwards Insp Repts 50-275/90-14 & 50-323/90-14 on 900430- 0504 & Notice of Violation ML16342B6761990-05-25025 May 1990 Forwards SER Accepting Response to NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in Steam Generator Tubes ML16341F7311990-05-23023 May 1990 Forwards Insp Repts 50-275/90-11 & 50-323/90-11 on 900402-0504.Violation Noted But Not Cited ML20043C3631990-05-23023 May 1990 Forwards State of CA 1988 Environ Radiological Measurements Rept,Per Cooperative Agreement NRC-32-83-684.State Obtains & Analyzes Samples of Environ Media to Verify Adequacy of Environ Radiological Measurements ML16341F7041990-05-18018 May 1990 Advises That Response to Generic Ltr 88-11, NRC Position on Radiation Embrittlement of Reactor Vessel Matls & Impact on Plant Operations Acceptable,Based on Mods Approved Via Amends 54 & 53 to Licenses DPR-80 & DPR-82,respectively ML16342B6731990-05-18018 May 1990 Advises That 891113 Response to Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs, Satisfactory ML16341F6991990-05-16016 May 1990 Informs That Util Response to NRC Bulletin 88-003, Inadequate Latch Engagement in Hfa Type Latch Relays Mfg by GE Acceptable,Based on Confirmation That Subj Relays Not in Use in Class 1E Applications at Facility IR 05000275/19900051990-05-0909 May 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/90-05 & 50-323/90-05 ML16342B6701990-05-0808 May 1990 Provides Info Re Generic Fundamentals Exam Section of Operating Licensing Written Exam to Be Administered on 900606.List of Lodging in Immediate Area & Name & Phone Number of Regional Contact Encl IR 05000275/19890321990-05-0707 May 1990 Discusses Final SALP Repts 50-275/89-32 & 50-323/89-32 for Period Aug 1988 - Dec 1989 ML16341F6771990-04-27027 April 1990 Forwards Request for Addl Info Re Soil Structure Interaction at Plant Based on Questions Raised During 891102-03 Soil Structure Interaction Meeting in San Francisco.Response Requested by 900615 ML16341F6701990-04-26026 April 1990 Requests Addl Info Re NRC Review of long-term Seismic Program ML16341F6811990-04-23023 April 1990 Ack Receipt of Requesting Exemption from 10CFR26 on Behalf of Certain Employees at Plant ML20034B4981990-04-20020 April 1990 Forwards Insp Repts 50-275/90-02 & 50-323/90-02 on 900205-14 & Notice of Violation.Util Should Adhere to Procedures Re Method for Control of Personnel Access Into Vital Areas.Rept & Notice of Violation Withheld (Ref 10CFR73.21) ML16341F6781990-04-16016 April 1990 Forwards SALP Mgt Meeting Repts 50-275/90-12 & 50-323/90-12 on 900322.Comments Re Meeting May Be Provided within 30 Days of Ltr Date ML16341F6601990-04-12012 April 1990 Forwards Documents & Request for Addl Info Re NRC Review of long-term Seismic Program During 900430 & 0501 Ground Motion Meeting ML16341F6711990-04-0909 April 1990 Forwards Insp Repts 50-275/90-09 & 50-323/90-09 on 900321-23.No Violations or Deviations Noted ML16341F6511990-04-0909 April 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/89-34 & 50-323/89-34 ML16341F6521990-04-0606 April 1990 Forwards Request for Addl Info Re NRC Review of Masonry Wall Issues at Plant.Each Issue in Encl Request Should Be Addressed by 900520 ML16341F6471990-04-0505 April 1990 Ack Receipt of & Payment of Civil Penalty in Amount of $50,000.Disagrees W/Util Conclusion That Opening Sump Access Hatches Did Not Render Containment Recirculation Sump Inoperable ML16341F6631990-04-0404 April 1990 Forwards Insp Repts 50-275/90-05 & 50-323/90-05 on 900128-0310 & Notice of Violation IR 05000275/19890291990-04-0202 April 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/89-29 & 50-323/89-29 IR 05000275/19900011990-04-0202 April 1990 Forwards Insp Repts 50-275/90-01 & 50-323/90-01 on 900108-12 & 0122-0202 & Notice of Violation IR 05000275/19900071990-03-27027 March 1990 Forwards Enforcement Conference Repts 50-275/90-07 & 50-323/90-07 on 900316.Repts Withheld (Ref 10CFR2.790 & 73.21) 1990-09-07 Category:OUTGOING CORRESPONDENCE MONTHYEARML16341D1311999-10-15015 October 1999
[Table view]Discusses Arrangements Made During 991013 Telephone Conversation for Administration of Licensing Exams at Diablo Canyon Power Plant Facility During Wks of 990410 & 990417. Requests Submittal of Ref Matls by Jan 15,2000 ML16341D1291999-10-14014 October 1999 Forwards Insp Repts 50-275/99-15 & 50-323/99-15 on 990920- 24.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML16342B9961999-10-0606 October 1999 Refers to OI Investigation 4-1998-029 in Response to Complaints from Shift Foreman of Alleged Retaliation for Reporting Safety Concerns.Allegations Not Substantiated ML16342A9081999-09-30030 September 1999 Informs That Staff Review of Util 980327 Response to GL 96-06, Degradation of SG Internals, Did Not Identify Any New Concerns & Concludes That Util Response to GL Provides Reasonable Assurance That Conditions of SG Compliant IR 05000275/19990071999-09-29029 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/99-07 & 50-323/99-07 on 990727 ML16342A9111999-09-29029 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & Pse&G Responses for Diablo Canyon NPP ,990701 & 990923.Informs That Staff Reviewed Responses & Concluded That All Requested Info Provided.Considers GL 98-01 Closed for Diablo Canyon ML16342A9091999-09-29029 September 1999 Forwards SER Granting Requests for Relief NDE-12.2R8, NDE-13-2R8,NDE-14.2R8,NDE-22.2R8 & NDE-25.2R8 Pursuant to 10CFR50.55a(g)(6)(i) for Second 10-year ISI Interval for Diablo Canyon,Unit 2 ML16342A8981999-09-20020 September 1999 Requests That PG&E Update ERDS Dpls Submitted in to Provide Missing Info ML16342B9901999-09-20020 September 1999 Forwards SE Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML16342A9011999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Diablo Canyon & Did Not Identify Any Areas in Which Performance Warranted Add Insp Effort Beyond Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next 7 Months ML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML16342A8881999-08-25025 August 1999 Forwards Insp Repts 50-275/99-13 & 50-323/99-13 on 990802- 06.No Violations Noted.Purpose of Insp,To Review Solid Radioactive Waste Mgt & Radioactive Matls Transportation Programs ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML16342C1331999-08-11011 August 1999 Ack Receipt of Transmitting Rev 3,change 18 to Diablo Canyon Nuclear Power Plant Emergency Plan ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML16342A8751999-07-30030 July 1999 Forwards Insp Repts 50-275/99-10 & 50-323/99-10 on 990529-0710.Four Violations Being Treated as Noncited Violations ML16342A8691999-07-29029 July 1999 Forwards Insp Repts 50-275/99-08 & 50-323/99-08 on 990628-0702.No Violations Noted.Radiological Environ & Meterological Monitoring Sys Were Effectively Implemented ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML16342A8661999-07-26026 July 1999 Advises That 981021 Application for Amends to Licenses DPR-80 & DPR-82 to Modify TS Re Voltage & Time Delay Setpoints for First Level Undervoltage Relays & Second Level Undervoltage Relays Being Treated as Withdrawn ML16342A8541999-07-15015 July 1999 Submits Summary of 990701 Meeting with Util in Region IV Ofc to Discuss Performance of Different Groups During Refueling Outage 1R9 & Plans for Continued Performance Improvement ML16342A8461999-06-30030 June 1999 Discusses Closeout of Responses to RAI Re GL 92-01,Rev 1, Suppl 1, Rv Structural Integrity, for Plant,Units 1 & 2 IR 05000275/19990061999-06-25025 June 1999 Forwards Insp Repts 50-275/99-06 & 50-323/99-06 on 990418-0529.Two Violations Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy ML16342A8381999-06-21021 June 1999 Forwards Corrected Pages (Page 2 of Transmittal Ltr,Pages 3, 7,8,11,12,21,25,28 & 29 of Safety Evaluation & Pages 2,3 & 4 of Table 1 Attached to SER) Re Util 981015 Second 10-year Interval Inservice Insp Program Plan ML16342A8271999-06-16016 June 1999 Announces Corrective Action Program Insp at Plant,Units 2 & 2,reactor Facilities on 990726-30.Insp Will Evaluate Effectiveness of Activities for Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations ML16342A8151999-06-0909 June 1999 Ack Receipt of Ltr Dtd 990312,which Transmitted Change 16, Rev 18 to Physical Security Plan for Diablo Canyon Under Provisions of 10CFR50.54(p).No NRC Approval Required ML16342A8061999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon NPP Er Plan Implementing Procedures,Ep G-1, Emergency Classification & Ep,Activation,Rev 28,under 10CFR50,App E,Section V Provisions.No NRC Approval Required ML16342A8081999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan Implementing Procedures EP G-1,Emergency Classifications & EP Activation, Rev 27,under Provisions of 10CFR50,App E,Section V ML16342C1221999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan,Rev 3,Change 17, Under Provisions of 10CFR50,App E,Section V ML16342C1211999-06-0303 June 1999 Refers to 990602 Meeting with Util in Arlington,Tx Re Planned Electrical Configuration for Refueling Outage 2R9 During Midloop Operation.List of Attendees & Handouts Used by Util Encl ML16342A8021999-06-0303 June 1999 Ack Receipt of Ltr in Response to Request for Addl Info Contained in Ltr to Ruger ,which Forwarded NRC Insp Repts 50-275/98-201 & 50-323/98-201. Actions Described in Ltr Responsive to NRR Concerns ML13319B1431999-06-0202 June 1999 Responds to Comment Made by P Gunter at 990413 Reactor Decommissioning Public Meeting Re New Info Coming Out of Kobe & Northridge Earthquakes by Providing Info on Seismic Design,Procedures & Analyses Used by NRC & NPPs ML16342A7981999-05-27027 May 1999 Forwards Several Documents That Describe Recent NRC Policy Development in Oversight of Safety Cultures as Result of Millstone Experience Per Request ML16342A7951999-05-25025 May 1999 Informs of NRR Reorganization Effective 990328 & That as Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML16342A7891999-05-14014 May 1999 Forwards Insp Repts 50-275/99-04 & 50-323/99-04 on 990307-0417.Four Violations Identified & Being Treated as non-cited Violations ML16342A7861999-05-14014 May 1999 Submits Summary of 990423 Meeting in San Luis Obispo,Ca to Discuss Results of Ppr,Completed on 990211.List of Attendees & NRC Presentation Slides Encl ML16342C1141999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407 to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheets & Results to Appropriate Individuals ML16340C2241999-05-0303 May 1999 Forwards Insp Repts 50-275/99-02 & 50-323/99-02 on 990405-09.No Violations Noted.Insp Used Annual Licensed Operator Requalification Exams to Assess Licensed Operator Performance ML16342A7681999-04-15015 April 1999 Ack Receipt of 990326 Response to NRC 990216 Request for Written Response to Explain Why Greater than 5 Percent Post Exam Changes to Test Questions Were Needed & What Actions Taken to Prevent Recurrence.Finds Reply Acceptable ML16342A7691999-04-14014 April 1999 Requests That First Page of Ltr Transmitting NRC Insp Repts 50-275/99-03 & 50-323/99-03 Be Replaced with Encl Page. Initial Transmittal Contained Minor Editorial Error ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 ML16342A7571999-04-0808 April 1999 Forwards SER Accepting Util Emergency Core Cooling Sys Manual & Automatic Switchover from Refueling Water Storage Tank to Containment Sump for Diablo Canyon Power Plant IR 05000275/19990031999-04-0505 April 1999 Corrected Ltr Forwarding Insp Repts 50-275/99-03 & 50-323/99-03 on 990124-0306.Minor Editorial Error Corrected on First Page ML16342C1101999-04-0505 April 1999 Forwards Copy of FEMA Final Rept for 981204 Diablo Canyon Power Plant Medical Drill.Rept Indicates That There Were No Deficiencies & Two Areas Requiring C/A Identified During Drill ML16342C1091999-03-30030 March 1999 Forwards Plant Issues Matrix That Was Inadvertently Omitted from PPR for Plant Facility.Encl 1 to PPR Requested to Be Replaced ML16342A7401999-03-25025 March 1999 Forwards Insp Repts 50-275/99-01 & 50-323/99-01 on 990215-26 at Diablo Canyon Npp.No Violations Noted.Purpose of Insp Was to Complete Evaluation of Welding & Welding Insp Program at Diablo Canyon NPP ML16342A7381999-03-23023 March 1999 Refers to PG&E SG 90-day Rept, 90-Day Rept for Voltage- Based Alternate Repair Criteria - Unit 2 Eighth Refueling Outage, Dtd 980628.Forwards SE Concluding PG&E Implemented voltage-based Criteria in Accordance with Licensing Basis ML16342C3241999-03-19019 March 1999 Advises of NRC Planned Insp Effort Resulting from Plant PPR Completed on 990211 for Period 980510-990125,to Develop Integrated Understanding of Safety Performance.Historical Listing of Plant Issues & Details of Insp Plan Encl ML16342A7341999-03-18018 March 1999 Forwards FEMA Final Rept for 981104,emergency Preparedness Exercise.Rept Indicates No Deficiencies During Exercise, However 7 Areas Requiring Corrective Action Identified ML16342A7291999-03-12012 March 1999 Responds to Petition Requesting That NRC Modify Operating Licenses for Diablo Canyon Nuclear Power Plant to Require That Owner Have Independent Contractor Evaluate Plant Safety Culture ML16342A7281999-03-0404 March 1999 Forwards Draft SE on Proposed Conversion of CTSs for Plant, Units 1 & 2 to Itss.Provides Draft SE for Review to Verify Accuracy & to Prepare Certified ITSs for Plant to Be Submitted for Issuance in Conversion Amend 1999-09-30 |
Inspection Report - Diablo Canyon - 1978014 | |
---|---|
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION V
A SUITE 202'ALNUT CREEK PLAZA 1990 N. CALIFORNIABOULEVARD WALNUTCREEK, CALIFORNIA 94596 Docket Hos. 50-0-323 (-()(g Fp>i Q)Q(gg %~"
Pacific Gas and Electric Company 77 Heale Street San Francisco, California 94106 Attention:
tjr. Philip A. Crane Jr.
Assistant General Counsel Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units
and
This refers to the inspection conducted by Hr. T. Young of this office on September 1-30, 1978 of activities authorized by NRC Construction Permits Nos.
CPPR-39 and CPPR-69, and to the discussion of our findings held by Hr. Young with f1essr s.
Ramsay, Etzler, Leppke, and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed.
inspection report.
ltithin these areas, the inspection consisted of selective examinations of procedures and representative records, inter-views with personnel, and observations by the inspector.
No items of noncompliance with HRC requirements were identified within the scope of this inspection.
In accordance with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you believe to be proprietary, it is necessary -that you submit a written application to this office, within 20 days of the date of this letter, requesting that such information be withheld from public disclosure.
The applica-tion must include a full statement of the reasons why it is claimed that the information is proprietary.
The application should be prepared so that any proprietary information identified is contained in an enclosure
~ W h>>
r
~
~
Pacific Gas and Electric Company-2-to the application, since the application without the enclosure will also be placed in the Public Document Room.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be glad to discuss them with you.
Sincerely, Enclosure:
IE Inspection Report Nos. 50-2?5/?8-14 50-323/78-14 R
ctor Operations and Nuclear Support Branch cc w/o enclosure:
R.
P. Hischow, PGSE J.
D. >Iorthington, PG8E R.
D. Ramsay, PGKE (Avila Beach)