IE Insp Rept 50-320/76-12 on 760908-10.No Noncompliance Noted.Major Areas Inspected:Status of Outstanding Items & QA Program for Piping & Electrical Work
ML19220B427
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/20/1976
From: Finkel A, Narrow L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19220B426 List:
References
50-320-76-12, NUDOCS 7904260021
Download: ML19220B427 (11)


Text

.

_

_

E:I-Form 12 an 75) (Rev)

U. S. NUCLEAR REGUIATOR'i CC:SilSS10:1 0FFICE OF INSPECTION AND ENFORCCIE?ir REGIO:1 I

.

IE Inspection Report No:

50-323/76-12 Docket No:

50-320 Licensee:

Metropalitan Edison Cor.pany License No: CPPR-66 Box 542 PdoW

--

Reading, Pennsyliania 19603 B

Category:

Safeguards

,

Group:

}Iiddletown, Pennsylvania (T}II-2)

,

Location:

Ne of Licensee:

Type of Inspection:

Rnn t w _

p,3,,, n,,,,.,.a Dates of Inspection:

Septed er 8 - 10. 1976 Dates of Previous Inspection:

Aucust 24 - 27. 1976 f!20!7[s Reporting Inspector:

O M

'

DATE L.

har ow, Reactor Inspector

&!

7!M!7[-

Accompanying Inspectors:

  1. X.&

OSbW n.

rintel, neactor inspector 4 DATE

.

DATE

~

DATE

.

Other Accompanying Personnel:

n,,, o DATE

eviewed By:

/

_'

k R. F. Heishman, Chief, Construction Proj ects Section DATE Reactor Construction and Engineering Support Branch

.

I O

.

790<1260ORf

'

_

.

-

.

-

SUM 1ARY OF FIUDINGS e

_

Enforcement Action 0>

Ite=s of Noneccoliance

.

None Licensee Action on Previously Identified Enforcement Items Lack of procedural controls for protection of electrical cable in out-door storage and f ailure to provide such protection has been resolved.

(Details, Paragraph 3)

Design Channes None Unusual Occurrences None Other Sinnificant Findings

!

A.

Current Findinns

i 1.

The following items are unresolved:

QC acceptance criteria for termination of electrical a.

cable without connectors was not available for review by the inspector and the quality of'some of the work did not meet the work =anship standards of the National Electrical j

-

Code.

(Details, Paragraph 4)

b.

The wall outlets, junction boxes and light ' switches in the battery rooms do not meet the National Electrical j

Code (NEC) requiremeats of Article 500 for hazardous l

locations. (Details, Paragraph 5)

I

The following items are considered to be acceptable:

.

2.

j Vendor documentation for nuclear services closed cooling a.

water system piping. (Details, Paragraph 6)

b.

Documentation of cable pulling and termination. (Details, (

Paragraph 7)

l

.

g.

'. >

-

'

-

-

-

-2-

.

B.

Previous 1v Reported Unresolved items 1.

The following ite=s have been resolved:

a.

The licensee reported deficiency in electrical connections at penetrations. (Details, Paragraph 8)

b.

Revisions to condensate storage tank drawings have been

.

completed. (Details, Paragraph 9)

2.

Review of -dynamic stress calculations for the main steata and pressurizer relief valves remaint unresolved. (Details, Para-graph 10)

C.

Deviations None i

Exit Interview An exit interview was held at the site on September 10, 1976.

Persons Present General Public Utilities Service Corporations R. F. Fenti, QA Auditor S. Levin, Proj ect Engineer P. A. Levine, QA Auditor J. R. Stout, Electrical Resident Engineer M. J. Stromberg, Sr. Site Auditor United Engineers and Constructors J. J. Carrabba, Construction /QC Superintendent D. C. Lambert, Field Supervisor QC D. Long III, Electrical QA/QC Coordinator T. M. Polen. Checker J. Spinak, Lead QA Engineer Burns & Roe

'

C. T. Harper, Jr., Site Proj ect Engineer A.

Scope of Inspection The inspector stated that the inspection was conducted to review (

the status of outstanding items and the QC program for piping and electrical work.

.

',i, -050

-

. -.

.

..

-

..

-3-B.

Inspection Findines

-

The inspector su=arized the results of the inspection as listed in the Sur: mary of Findings.

In each case the licensee acknowledged the information.

.

e

e e

t O

i 7ee.n

.

-

E

-

-

DCTAILS 1.

Persons Contacted General Public Utilities Service Corporation R. F. Fenti, QA Auditor P. Karish, Electrical Engineer R. Kazebee, Project Engineer S. Levin, Project Engineer P. A. Levine, QA Auditor M. J. Stromberg, Senior Site Auditor J. E. Wright, Site QA Manager United Engineers and Constructors J. Carrabba, Construction /QC Superintendent R. Crofton, QC Engineer J. Giliey, Facility Supervisor D. Lanbert, QC Supervisor R. W. Liscom, QC Engineer, Electrical D. Long, 3rd, QC Electrical Coordinator T. Polen, Electrician J. Schmidt, Records Supervisor

-

E. Wermann, QA Engineer B. Zapski, Electrician Burns'& Roe G. T. Harper, Jr., Site Project Engineer Stressteel Corporation H. Williams, QA Manager 2.

General At the pre-inspection meeting with the licensee's representatives, the inspector stated that this inspec, tion vould cover review of the status of outstanding items and the QA programs for piping and electrical work.

The inspector was informed that testing was in progress on several systems including the nuclear service river water and the nuclear services closed cooling water systems. The operating floor of the fuel handling building has been turned over to operations and receipt of fuel vill begin late in September.

,

During a valk-through inspection of the facility the inspector (

observed loading of a done tendon in the contain=ent post-tensioning t U TI[2

~

'

-

.

O

_

_

-5-

.

system, the condition of the fuel handling building at the operating floor and the crack in the seal weld of the secondary river water /

secondary closed cooling water heat exchanger.

Cracks had been reported by the licensee in three heat exchanger's of this type.

.

3.

Outdoor Storace of Electrical Cable Clarification of the requirements for protective covering of electrical

.

cable in outdoor storage and testing of exposed cable had remained unresolved during a previous inspection. (Inspention Report 50-320/

76-09)

The inspetror examined Rev. 17 of UE&C Procedure ECP-3-2.

Paragraph 4.4.5 of th.!s procedure has been revised to require that power and control cab;.e be covered when the stocage period exceeds or is expected to exceed one year.

Instrument cable is to be covered or located undar a roof whenever it is in storage. Paragraph 4.7.7.

-

has been rr. vised to require records of return of cable to storage

'

to be maircained on Reel Record Cardc.

The inspector audited a group of Meel Record Cards and observed that the dates of return to storage had been recorded where applicable.

The inspector also examined the report of dielectric and resistance tests performed on sample reels of cable which had been stored out-doort withoni protective covering. "The exposed cable was identified on Jeviation Report (DR) No. 0614 and disposition of this DR included tests of sa=ple reels of cable.- The tests were conducted on reels Nos. B-7071 and B-5565 (15 conductor No. 12 Kerite Cable "EK-9-J")

and Nos. B3593 and X-4559 (7-conductor No. 4 Kerite Cable "EK-6-A").

The tests were conducted by Continental Cable and Wire Company and were witnessed by the licensee's representative.

The test report dated August 10, 1976 showed the result of the tests to l

.

Le equivalent to the results of similiar tests originally performed

,

by the manufacturer.

4.

Electrical Circuit ' Terminations A number of the circuits observed during inspection of installation of electrical power and control cables (Paragraph 7 of this report)

were energized.

The inspe; tor was therefore unable to observe the circuit terminations with the exception of circuits MA6C and MA90C.

l The circuit terminations in circuit MA90C, local Control Station i

BSV4A of the Auxilliary Building, elevation 280' were terminated in a good workmanlike manner.

The MA6C circuit in Local Control Station DHV4A, did not appear to meet the standards contained in the referenced Electrical Code and handbook,

\\

l

[

',6 153

-

a

!

-

-

-6-The standard ctreuit wires had wire strands protruding to the side inserted parallel into the of the screw type connector and notthe insulation of the wire after

.

conne: tor. It was also noted that s not inserting the wire conductor into the screw type connector, wa flush with the connector but had approximately 1/16" of wire con-ductor showing.

The Handhook of the National Electrical Code and Th The Handbook of wire conductors in solderless pressur e <:ennectors.

The Nation Electrical Code also defines performance of work in a work =anlike manner.

16 for Receiving, Storing, Handling UESC Procedure ECP-3-2, Rev.

establish the requirements and Installing Wire and Cable does not for installation of solderless pressure connections.

This item is unresolved pending review by an NRC inspector of addi-ter=inations and the licensees criteria for such tional circuit connections.

& Wall Wiring 5.

Batterv Room Lighting During this inspection, the inspector established t battery rooms were not explosion-proof hardware a Burns and Roe (B&R) Electrical of The National Electrical Code.

2555-70 references this code.

Equipmeut installation Specification The B&R representative stated that their engineering evaluation of stab-the battery rooms and the ventilation system for these f

at a low level such that there was no requirement for use oThe inspe had included consideration of the hydrogen concentration level if explosion-proof equipment. ~

h d

f ailure of the ventilation system occurred during disc arge an charge of the batteries. The B&R representative stated tt 7t this case would b'e evaluated and that an engineering report ce the the site.

battery room design would be made available at This item is unresolved pending review of the B&R report by an NRC inspector.

yendor Documentation - Piping 6.

The inspector examined the docu=entation shown below 12-inch), and 2NS-84 (12-inch) in the nuclear services closed spools Nos.

t cooling water (NS) system.

t

'/6-~O54

-

\\

l l

_

i

-

-

..

-7-M. W. Kellog (In00 isometrics and f abrication drawings.

a.

b.

Material test reports showing chemical and physical prop-

'

erties which conf ormed to the applicable ASTM requirements.

Weld history record sheets showing vendor 'abrication and c.

inspection activities in conf ormance with 86R specifica-

-

tion 2555-64.

d.

Receiving inspection records showing verification of documentation and markings; visual inspection for shipping damage; and identification of Releare Tag, Log of Deviation Reports (DR's) for the NS system which e.

showed six piping DR's.

Disposition of all but the last DR had been completed and accepted.

DR No. 624, dated August 11, 1976 showed damage to valves in shipment.

The disposition had been established but was not complete.

The inspector examined documentation of a portion of the NS system which had been re.'. eased for testing.

Documents included flow diagrams, physical drawings, hanger location and isometric drawing; the Piping Department's release; the QA/QC transmittal of Phase I Turnover Agreement showing inspection perforced and attaching a

" punch list" of incomplete items.

The inspector also audited the personnel records showing qualification of inspection personnel.

No discrepancies were identified.

7.

Electrical Power and Control cables The inspector audited safety related cables, terminations and associated hardware for the electrical circuits shown belev:

Termination Turn Over Circuit No.

Conduit Report No.

Pulling Report No.

Report No.

Package No.

MA6C 15084 15116 16030

-

13120 15213 DH-47-3E MA11C

-

MA16C 13590 13760 14697 NR-111-21E 12754 15791 BS-141-3E MA88C

-

MA90C 14993 15036 16032

-

MA168C 12607 12960 13995 NR-111-2E MB4C 13710 12977 15569 DH-47-4E MB16C 12601 12008 14697 NR-111-21E P317C 12598 12969 14195 NR-111-5E M3180C 15767 15667 15897 MS-98-5E MA86P 15320R 16018

-

-

MASP 15312 -

16016

-

-

MAISP 13586 14148 15560 NR-111-37E MA167P 13695 14079 14611 NR-111-21E MA10SP 13589 14216 14648 NR-111-21E FB15P 12600 13419 13957 NR-111-2E 14053 Supplement #

14107 (

M3161P 12605 12875 14197 NR-111-5E 14667 Supplement 4 H395P 13439 13720 14662 NR-111-21E ME15P 15134 15543

'

-

-

.

j ME27P 15136-15542

-

i

-

-

qs. - p.t s ;

-

l g

~

v

._

__

.

_

_

- b-

.

a.

Documentation The installation, cable size, routing and protection, grcunding,

-

identification, tray loading, and termination of the circuits were docu=cr ted in the turn over packages in accordance with the requirem?nts of UE&C Electrical Construction Procedure, ECF-3-2 RevisJon 16 for Receiving, Storing, Handling, and

-

I tstalling Uire and Cable.

The turn ove.. packages were current, legible end easily retrievabic from the document contuol vault.

Of the packages listed, all records were signed by a quality control inspector and the nonconformancas listed with a disposition stated.

Quality Control maintains a punch list of the nonconformances, and the disposition stated in the turn over packages is to be completed at a later date and to be verified by quality centrol.

b.

Installation The inspector verified that the circuits were installed in accordance with the pulling reports listed No discrepancies were identified.

8.

Electrical Penetration Connections

.

By letter dated March 11, 1976 the licensee had reportci. as a significant deficiency in accordance with 10 CFR 50.55(3 <, the pres.ence of a mylar material under cable terminal lugs en electrical penetration cables.

Following review by the licensee, the A-E (B&R) and General Electric Company (GE) (the vendor), a program was agreed upon for replacement of cable terminal lugs on all No. 2 cables and for testing all No.

2 and 4/0 cables on a sa=p?ing basis to determine whether internal splices were acceptable.

The sampling program was established at a meeting of GE and the A-E on April 29, 1976.

(Conference Notes No.

1182)

It required testing of five pairs of cables per penetration.

If the results were not acceptable all circuits in the penetration would be tested.

The inspector examined the following documents:

a.

Letters dated July 2, 1976 and July 26, 1976, B&R to CE stating that cable resistance data had been reviewed and in<'

ited thut mylar tape was not present in the penetrations.

(

b.

Letter dated July 28, 1976, CE to B&R stating that re-lugging of the No. 2 conductor and random sampling of the No. 2 and I

-

.

.

m

-

-

_9_

4/0 conductors has been completed.

Field documentation of

.

this work was attached and showed four penetrations to have been re-lugged and 10 penetrations, including the above four, to have been resistance tested.

-

The inspector checked these penetrations against a listing and description of the GE low voltage penetrations and determined that the penetrations tested included all No. 2 and 4/0 cables.

This item is resolved.

9.

Condensate Storace Tank Drawings Lack of updated B&R drawings of the condensate storage tank had been identified as an unresolved item.

(Inspection Report 50-320/

76-08)

The inspector examined B&R drawing No. 2217, Rev. 12.

This drawing showed the two additional 6-inch nozzles and noted that the field was to provide two 6-inch blind flanges for i.he existing nozzles.

Drawing No. 2217, Rev. 12 is in agreement with the contractors (PDM) drawing E-6.

(Contract No. 13041)

This item is resolved.

10.

Dynamic Stress Calculations Preparation of dynamic stress calculations on the main steam and pressurizer relief valves had been identified as an unresolved item. (Inspection Report 50-320/74-04)

The inspector examined the following:

a.

Main Steam Relief Valve B&R letter dated February 22, 1974, Serial No. 1224-GP, enclosing final report " Analysis of Main Steam Safety Blow-off."

This report concludes:

(1) The stresses at all critical locations are within the limitation.of equation (9) Paragraph NC-3652.2 (Winter 1972 Addenda to ASME Code,Section III)

(2) The stiffness of the trunnion support at the discharge elbow is sufficient to preclude excessive flow-induced vibrations.

(

Correspondence between CPU and B&R with com=ents a-d responses and GPU " Document Review Talk Record" showing this report coroved by GPU October 15, 1974.

l

'

... o c c,

,

'

f (k oe'4

.

-

_.

-10-

_

b.

Pressurizer Relief Valve

.

B&R Report No. 7.00.006 dated June 25, 1976, " Pressurizer Relief Valve Discharge Piping Stress Analysis." This report concludes, in part, "The stress developed in the discharge piping system due to pressure, seismic, dead weight, and thermal expansion of the piping system were compared with the stress limits as defined by ANSI B 31.1... 1967 and were found acceptable."

Paragraph 3.2.2 of this report imposes a requirement for the dead weight support system and states that Bergen-Paterson (B-P) vill be notified of this requirement.

The inspector observed that B-P was furnished this information by letter from B&R dated October 6, 1975.

The inspector was informed that review of this report by GPU was in progress but had not been completed.

This item remains unresolved pending completion of this review.

.

'

-

.