ML19220B425
| ML19220B425 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/22/1976 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19220B426 | List: |
| References | |
| NUDOCS 7904260019 | |
| Download: ML19220B425 (2) | |
See also: IR 05000320/1976012
Text
.
3
..'""'D'y
UNITED siATLi
,
j
i
fJUCLE AR ltEGULATORY CO r.". MIS SION
[
$
- '
REGION I
g
y ., ;
r,3i roim avr 40c
t
-
_ / 7'
xir.c os pie ussia. r:NNSY L V Ald A 19404.
,
's ,,
J
- ..+*
SEi 2 2 Uh,
Metropolitan Edison Company
License No. CPPR-66
'
Attention:
Mr. R. C. Arnold
Inspection No. 76-12
Vice President
Docket No. 50-320
P. O. Box 542
,
Reading, Pennsylvania 19603
Genticmen:
This refers to the inspection conducted by Mr. L. Narrow of this effice
on September 8-10, 1976 at Middletown, Pennsylvania of activities authorized
by URC License No. CPPR-66 and to the discussions of our findings held
by Mr. Narrow with Mr. Levin and other me=bers of your staf f at the
conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspecticn Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no, items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part
2, Title 10, Code of Federal F.egulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room. If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such application must be accompanied by an
affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
considered by the Co==ission as listed in subparagraph (b) (4) of Section
2.790.
The infor:ation sought to be withheld shall be incorporated as
f ar as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report
vill be placed in the Public Document Room.
k
.
,C 046
.
. ~ , .
--
\\
79042600M
,
.
.
_.
-2-
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
dC
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Braach
Enclosure:
IE Inspection Report No. 50-320f76-12
R. L. Wayne, QA Manager, Design and Construction
Manager
cc:
T. M. Cri= mins, Jr. , Saf ety & LicensinE
R. W. Heward, Jr., Project ManagerDesign & Construction
W. A. Verrochi, Vice President,
Gerald Charnoff, Esquire
Miss Mary V. Southard, Chair =an Citizens for a Safe Environment
(Without Report)
_
9
L
4
I
-
7 G-Q ^ ~j
i
-