IR 05000320/1976001
| ML19220C253 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/18/1976 |
| From: | Heishman R, Jerrigan E, Narrow L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19220C245 | List: |
| References | |
| 50-320-76-01, 50-320-76-1, NUDOCS 7904300099 | |
| Download: ML19220C253 (10) | |
Text
.
_
_
'NenCE IE:I Form 12 (Jan 75) (Rev)
,-
REGION 1 "AS g a w va2n3
-
agjuwtCE IM U. S. !!UCLEAR REGULATORY CO:CIISSIO?I
,
'
OFFICE OF IiSPENIO:I AND ENFORCD!E Tr
.
REGION I
i 50-320/76-01 Docket No:
50-320 IE' Inspection Report No:
Metropolitan Edison Conpany License No:
CPPR-66 Licensee:
Box 542 Priority;
-
.
A Reading, Pennsylv: inia 19603 Ca tegory:
..
Safeguards
-
_ _ _
Group:
Location:
Middletown, Pennsvivania (TMI-2)
Type of Licensce:
,
Routine - Unannounced (
pe of Inspection:
.
January'27-30, 1976 Dates of Inspection:
December 16-18, 1975 Dates of Previous Inspection:
.
s J
S.
- - -
' I '-
%
- '
..
Reporting Inspector:
-.
L'.
Narrow, Reactor Inspector DATE C 'h1 60 N 3-/9-7b Acco=panying Inspectors:
h. Jerpigan, Re ctor Inspector DATE DATE
.
.
DATE Other Acconpanyinr, Personnel:
7[
'
z Re. ecd By:
.
R. F. Heishman, Section Leader
' DATE
'
.
(ao
- --
.
,
l T
7 9o430 coff i
,
-
-
.
.
SUMMARY OF FINDINGS
.
.
Enforcement Action
A.
Items of Noncompliance
}
Infraction i
.
Contrary to 10 CFR 50, Appendix B, Criteriou '1II, material
-
certifications were not available for welding material and structural bolts for the core flood tank suppert structure.
(Details, Paragraph 2)
.
..
.
B.
Deviations _
None
'-
Licensee Action on Previously Identified Enforcement Items None Design Chances
-
None
.
Unusual Occurrences
.
None Other Sirnificart Findings A.
Current Firdings
-
1.
The following items are unresolved:
a.
Bolt threads are not fully engaged in bolted connections for-the decay heat system.
(Details, Paragraph 3)
.
b.
The purchase specification for anchor bolts for the core flood tank support structure is not readily identifiable and the specification referenced in the purchase order
appears to be incorrect.
(Details, Paragraph 4)
There_ appears to be a disparity between th'e inspection c.
contracter's procedure and B&R Specification 2552-72 vith respect to PT examination.
(Details, Paragraph 5)
.
e e
-
.
_
g, g,
- 4, /.
-
.-
,
.
-
..
.
The following items are considered to be acceptable:
2.
The prc'ssurizer surge line and core flood line "A"
a.
were observed to have been installed in accordance with (Details, applicable drawings and FSAR requirements.
-
Paragraph 6)
d structure.
b.
Work in progress on che core flood tank support (Details, Paragraph 7)
.
-
3.
Except as noted under 1.c. above, fit-up and. velding on the decay heat system and the make-up and purification system are considertd to be acceptable.
(Details, Paragraph 6)
..
Status of Previousiv Reoorted' Unresolved Ite*s.
B.
'-
The deficiency previously reported 1 v the licensee in 1.
pulling cable without QC surveillance and which had been tagged " Hold" has been resolved.
(Details, Paragraph 9)
Exit Interview An exit interview was held at the site on January 30, 1976:
.
Persons Present General Public Utilities Service Cor cratiqn R. F. Fenti. QA Auditor S. Levin, Project Engineer P. A. Levine, QA Auditor
-
G. Roshy, QA Engineer J. E. Wright, Site QA Manager United Engineers and Constructors J. Carrabba, Field Supervisor QC D. C. Lanbert, Field Supervisor QC Burns f, Roe E. F. Curry, QA Engineer W. P. Dornsife, Project Engineer-The items discussed are summarized below.
In each case, the. licensee
-
acknowledged the information.
.
.
.
'
.
.
I
,
..
"
,
i
_.
-
-
-
A.
Scope of Insucction the inspection was conducted to review
The inspector stated that the status of outstanding items and the-QC program for safety
-
,
related structures and piping.
,
B.
Items of Nor.cocoliance The inspector stated _that material certifications were not avail-able on site for welding material and structural bolts used in This installation of tbe core flood tank structural supports.
is considercd to be in noncompliance with 10 CFR 50, Appendix 3, Criterion VII.
(Details, Paragraph 2)
.
.;
.
C.
Unresolved Items The inspector discussed the items listed below and stated that
.
,,
these ite=s are unresolved.
Examinztion et bolted connections in the decay heat system 1.
identified a number of bolts with the threads not fully sagaged.
(Details, Paragraph 3)
The purchase specification for the core flood tank support 2.
The
-
structure anchor bolts is not readily identifiable.
t appears to be an incorrect purchase order has referenced what specification although the correct material was purchased.
The same method for identification of purchase specifications is applicable to other itens of miscellaneous steel as.well.
(betails, Paragraph 4)
.
The requirements for PT and visu.1 examination of Class N-2 3.
weldt do not fully conform to the requirements of B&R Specificction 2555-72.
(Details, Paragraph 5)
D.
Acceptable Items The inspector identified the items listed in Parts A-2 and A-3 of Other Significant Findings of the Su==ary of Findings and stated that these items are considered to be acceptable.
(Details, Paragraph 6, 7 and 8).
E.
Previous 1v Reported Items the deficiency previously reporten by The inspector stated that the licensee in pulling cable without QC surveillance and which had been tagged " Hold" has been resolved.
(Details, Paragraph 9,
_
-
%
i
,
.
n
,5
.
a O
J
-
--
.
DETAILS 1.
Persons Contacted
"
Ceneral Public Utilities Service Cocroration
'
L. Blystone, QA Engineer
-
R. F. Fenti, Quality Assurance Auditor S. Le cin, Proj ect Engineer P. A. Levine, QA Auditor D. Perry, QA Engineer
.
9. L. Roshy, Quality Assurance Engineer M. J. Stomberg, Site Quality Assurance Auditor J. E. Wright, Quality Assurance Manager
H. Wright, Resident Civil Engineer United Engineers and Constructors
- -
.
S. Abbott, Celding Superintendent C. Brooks, Welding Supervisor V. E. Cichocki, Construction /QC Surerintendent R. Crofton, Welding Engineer C. W. Hunter, Electrical Supervisor.
J. Karn, Assistant Piping Engineer
D. Lambert, QC Supervisor D. Smith, Area Su.perintendent J. C. Spinak, Lead QA Engineer
.
.
Babcock and Wilcox
~
'
R. Kunz, QC Supervisor Ceto g.2 Inspection, Inc.
C. W. Rentzell, Site Supe /icor z.
Material Certifications The inspector exmnined vendor documentation for the structural supports for core flood tank "B".
This caterial was furnished under Purchase Order 9459.02-18-12 which identified B&W Specification 2555-56 as the applicable specification.
This material had been released for construction and its installation was in progress.
.
O e
I
,
<T fi
' '/
,
')Q J',t
!
V"
_
_
-
The inspector observed that material certifications for welding
-
materials and structural bolts were not included with the vendor documentation available for review by the inspector as required by Specification 2555-56.
'
This is considered to be an infraction of.s CFR 50, Appendix B,
.
Criterion VII which state.=, in part, " Documentary evidence that material and equipment conform to the procurement requirements
'
.
shall be available at the nuclear power plant site prior
...
to installation or use of such material or equipment."
3.
Bolted connections Section 1-735.2, Bolting Procedure, of USAS B 31.7 requir.es that bolts shall be engaged so that there is visible evidence of complete threading through the nut.
The applicable pump and valve code has similar requirements.
.
.
During observation of work in progress on the decay heat system the inspector observed a numbei of flanged connections which had been bolted up, but in unich the bolt threads were not fully engaged. As exa=ples, it was noted that this was true of sc=e bolts en the following:
Connections to decay heat closed cooling water outlet line a.
flanges on decay heat coolers DHC-1A and DHC-13.
,
b.
Connections to suction and discharge line flanges on decay heat rt=p DHP 1A.
.
Connection of end cover to body of pump DNP 1A.
c.
d.
Connection of cover to body of check valve DHV 103A.
This item is unresolved pending observation of bolted connections
,
by the I&E inspector following inspection of the cocpleted system by the licensee.
,
4.
Purchase So_ecification - Miscellaneous Steel The inspector examined the documentation listed below concerning anchor bolts for the core flood tank support structure.
SP-88, Rev.A, dated January 9, 1976, " Identification of a.
Structures. Systems and Co=ponents under the Meted QA Plan."
This procedure states that Appendix I lists the specifications which are used for purchase and/or installation of structhral systems and co=ponents which are safety related and vuich are required to b controlled under the site QA plan during receipt storage and installition.
nq jkh
-
0.0
__
,
_
_
,
Appendix I lists Specification 2555-60,. Sections 3A, SC SD, SH and ISB,and Specification 2555-32, Sections 3A, SA and SB as nuclear safety related.
- b.
Purchase Order No. 9459-02-18-1 Release, dated July 20, 1971,
-
releases Drawing No. 4189 and states that material and fabrication are to be in accordance with the recuirements of I
Specification 2555-32, Sec. SA, and Specification 2555-60, Sec. 53.
Discussions of these documents as well as Specification 2555-60, Section SC and their examination by the inspector leaves some question as to which is the applicable specification since:
(1) 2555-32,- Section SA, does not reference Drawing N.o. 4489.
(2) 2555-60, Section SB, is not listed as nuclear safety
,
-
related on SP-88.
..
(3) 2555-60, Section SC, references Drawing No. 4189, but is not referenced on P.O.
9459-02-18-1.
The inspector observed. that this procedure is generally followed for p ocurement of miscellaneous steel and questioned whether the same problem had been encountered with other purchase orders for such material.
.
This item is unresolved.
5.
PT and Visual Examination - Class N-2 Welds
.
The inspector witnessed performance of visual and liquid penetrant (PT) examination of two socket velds, MU 25-A4 MU 25-B4 by the inspection contractor.
a.
Tha inspection contractor's representative stated that the visual examination of welds was cont'.ucted in accordance with the requirements of UE&C Welding Procedure 20&8.
The inspector reviewed parts of Procedure 20&8 applicable to weld inspection and weld quality r quirements and observed that they are in compliance with USAS B31.7 requirements.
b.
During interpretation of the PT results, the inspector
' observed an indication in the weld crater in each of the two welds examined.
ian p (,
s9,
.
i (j ;
.
.
-
-
_
~
.
The inspection centractor's representative stated that the indications were within acceptable limits outlined i
in their penetrant Procedure NPT-1-NP.
The inspector's review of Procedure NPT-1-NP disclosed that rounded indications up to 3/16" in diameter were acceptable.
'
Procedure NPT-1-NP did not make a distinction between indications and weld crater indications.
E However, Paragraph 3.2.4 o' Burns & Roe (B&R) Specification 2555-72,' tiding and NDT i Nuclear and Auxiliary Piping,"
states in part, "All indications in the weld craters or in the line of fusion between base material and weld metal shall be treated as defects...."
The inspector's review of the above documents, observation of work and
,
discussion with responsible personnel indicates a possible disparity between the specification and procedural requirements.
..
The above apparent disparity is considered unresolved pending a review and interpretation of the specification requirements by the A/E.
6.
Pipine Installation The inspector visually inspected the surge line from the
,
pressurizer to the reactor coolant loop hot leg cnd the core flood line f rom core flood tank "A" to the reactor pressure vessel (RPV).
The lines were found to have been installed and connected in accordance with the FSAR requirements.
Pip e spool pieces, fittings, valves and hangers (where complete)
were installed in accordance with layout and 1sonetric drawings as shown below.
a.
Surge Line This line was installed as shown on FSAR Figure 5.1-5 and in a: ordance with B&W Drawings Nos. 141562, Rev. 14; 141563, Rev. 12; 141564, Rev. 8; 141569, Rev. 10; and FSK-4.
b.
Core Flood Line
~
Thf, line from core flood tank "A" to the RPV was installed as shown on*FSAR Figure 5.1-3 and in accordance with B&R Drawings Nos. 2077, Rev. 7, 2034, Rev. 16; and M.W. Kellogg (MWK) Isometrics 2-4-1 and~2-4-3.
Hangers were installed as shown on MWK Drawing E 2491-4 except that hangers Nos.
CFH-19-S and CFH-24-S have not been installed.
-
!
This item is considered to be acceptable.
mn
,
-
O JI)
I
,
'
.
-
%
.
7.
Core Flood Tank Succort Structure The inspector observed work activities associated with erection
-
and installation of the support structure for core flood tank
"B" and audited the following Iccords associated with this work:
a.
B&W Procedure 16 for installation of the support structure.
-
b.
Welding Procedure WIN-101-5.
c.
Welder qualification records.
d.
NDE personnel qualification certificates.
'
e.
Records of QC verification of specific operations in-accordance with Procedure 16.
Observation of work in progress by the inspector confirmed
that it was in accordance with Eurns & Roe. Drawings 4205 and 4175 as well as B&W Procedure 16.
This item is considered to be acceptable.
8.
Fit-up and Weldine of Picine
.
The inspector observed the fit-up and align =ent of weld joint 2-DH-V128B, which attaches a 10" line to a cotor operated valve in the decay heat system.
The inspector r.lso witnessed the fit-up of vald joint 1913-1, a 2" pipe to fitting veld in the make-up purification system.
The alignment and fit-up of
'
the above weld joints was in accordance with the require =ents of UE&C Welding Procedure 20&8.
-
After completion of the ::
pass in the above identified welds the inspector visually inspected the rcot pass.
The inspector found the appearance of the weld to be ir. cocpliance with procedural requirements.
The inspector verified the velder's qualification to weld to the applicable procedure and the positions involved.
The inspector selected welds DH'V128A, DH-12SB and 191B-1
^
where the welding wa-beyond the root pass stage for verification of precedural ccapliance. The above welds were performed by qualified welders, using materials certified to meet specification requirements.
The inspector inspected the weld surface to verify that veld starts and stops vere ground in accordance with Procedure 20&S requirements.
..
I g
& (9
_
,
.
.
-
.
.
.
Weld interpass te=perature was checked in accordance with The inspector observed the liquid procedural requirements. examination of welds MU 25-A4 and FW 25-B4.
The veld surf ace was properly conditioned for PT and met code require-penetrant ments regarding merge angle.
examination of the finished welds in accordance with Procedure LPT-1-NP, revision 111, was performed by a qualified Liquid penetrant individual.
the above welds had been visually inspected
'
Records indicated that in the Except as indicated in paragraph 1.2.
and accepted.
Summary of Findings section of this report,the above are, con,,
sidered to be acceptable.
9.
Unecntrolled Cable Pull _
,
dated December 19, 1975, the licensee had reported
,
By lettet a safety related cs a significant construction deficiency th?t cable had been pulled despite a " Hold" tag mnd without QC
.
curveillan e.
.
(DR) No. 0530 and its The inspector examined Deviation Report
-
20, 1975 from supplement as ucl1 as a memorandum dated Nove=her
,
the Project Engineer to the Project Manager describing this a meeting of CPU and incif ent and the measures established at UELL canagement personnel, electrical construction supervisors its' recurrence.
These include:
and QC supervisors to prevent Stressing the requirements for compliance with " Hold" tags.
a.
Establishment of a requirement for improved communication between construction and QC regarding overtime and of f-shif t b.
work.
for informing QC inspectors of Stressing the requirement c.
changes in work schedule.
1, dated December 23, The inspector also examined ECM No. 3120, Rev.
the contractor may, at his option, 1975, which provides that install additional pull boxe s or pull sleeves when required for This requirement had been included in the corrective cable pulling.
actior.a to prevent recurrences of such problems.
This item is resolved.
.
.
nn
, - -