U.S. NUCLEAR REGULATORY COMMISSION REGION 1 REPORT NOS:
50-317/93-20 (OL)
50-318/93-20(OL)
DOCKET NOS:
50-317 50-318 LICENSE NOS:
'
DPR-69 LICENSEE:
Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 -4702
,
FACILITY:
Calvert Cliffs Nuclear Power Plant, Units 1 and 2 EXAMINATION DATES: October 12-13,1993 (requalification exam)
i October 25-29,1993 (initial exam)
NRC EXAMINERS:
J. Prell, Sr. Operations Engineer-Requalification & Initial exam L. Briggs, Sr. Operations Engineer-Initial exam R. Temps, Sr. Operations Engineer-Requalification exam P. Isaksen, EG&G - Initial exam M. Jones, EG&G - Initial exam
//- /B-f8 CHIEF EXAMINER:
awa
/
J mes Pr' ell, Sr Dperations Engineer Date rations Branch Division of Reactor Safety O
6"*
(~/8'7i APPROVED BY:
'
/Ggnn W. Meyer, Chief Date PWR Section, Operations Branch Division of Reactor Safety 9312030169 931122 I
PDR ADDCK 05000317 V
_ - ______ ___ -___ __ _ ___ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
-
.
.
SUMMARY: Requalification written examinations and operating tests were administered to two senior reactor operators (SROs) and two reactor operators (ROs). These examinations were administered in accordance with Revision 7 to NUREG-1021. All four operators passed their examinations, as graded by the NRC. The Calvert Cliffs Training Department failed an RO for his performance during the simulator scenarios based on the operator's failure to perform a thorough verification of plant status during two scenarios. These same four operators comprised a single operating crew. This crew was evaluated a satisfactory by both the NRC and the Calvert Cliffs Training Department during the conduct of the simulator scenarios. The licensed operator requalification training program was not evaluated because an insufficient number of operators were examined.
All three portions of the requalification examination were found to be technically challenging. A big improvement in complexity and format of the Job Performance Measures (JPMs) was noted. Managements involvement with evaluating.the crew performance during the simulator portion of the examination was a programmatic strength.
Written and operating examinations were administered to two SRO Instant candidates and eight RO candidates. All ten candidates passed their examinations and were issued licenses.
All ten candidates appeared well prepared for their licensing examinations. No generic weaknesses were noted.
Plant housekeeping improvements were noted by the examiners. Painting and lighting improvements to the lower turbine building deck were especially noted.
_
-
_ - _ _ _ - _ _ _ _ ___
.
.
DETAILS 1.0 REQUALIFICATION EXAMINATION 1.1 Examination Results:
NRC RO SRO TOTAL Results Pass / Fail Pass / Fail Pass / Fail Written 2/0 2/0 4/0 Simulator 2/0 2/0 4/0 Walk-through 2/0 2/0 4/0 Overall 2/0 2/0 4/0
-,
e Calvert Cliffs RO SRO TOTAL Results Pass / Fail Pass / Fail Pass / Fail
_
Written 2/0 2/0 4/0 Simulator 1/1 2/0 3/1 Walk-through 2/0 2/0 4/0 Overall 1/1 2/0 3/1 Calvert Cliffs failed an RO that the NRC passed. The reason for the facility failure was that the RO failed several times to properly verify the correct status of plant systems or components. For example, in one case, the Volume Control Tank level transmitter failed high, which caused Ixtdown flow to be diverted to the waste processing system.
Subsequently, actual VCT low level decreased to the point a VCT level alarm came in. It took the RO 25 minutes to discover that letdown had diverted to the waste processing system. In another case, the RO told the CRS that he had charging flow into the RCS when, if fact, there was zero flow due to Charging Header pressure being less than RCS pressure.
The NRC did not fail this RO because he had performed all his critical steps correctly, and the steps he failed to correctly perform were not of great safety significance.
1.2 Programmatic Strengths and Weaknesses A.
Strengths:
A big improvement in complexity and format was noted with both the in-plant and
simulator JPM _
_ - - _ _ _ _ - _
- _ _
-
.
.
_
The simulator scenarios used for the examination were challenging and provided the e
evaluators with ample opportunities for assessing the operators' skill.
The facility's management and evaluation crew did a good job of responding to some e
unexpected problems that occurred during one of the simulator scenarios. In that scenario, the crew took some unanticipated actions early in the scenario, which caused the scenario to take an unplanned route. Facility management and evaluation crew quickly identified where the scenario would most likely head and determined the crew critical tasks that could be used for evaluating the crew.
An improvement with the quality of the questions asked on the written examination
was also noted. The questions appeared to be more challenging and required more indepth knowledge of the areas examined.
B.
Weakness:
During the administration of the JPMs, some minor procedural problems were
identified with the plant operational procedures. In one case, the procedure, AOP-3B, directed the operator to a wrong step in the procedure and in another case the procedure, AOP-7D-1, directed the operator to a larger procedure, OI-3, but did not provide further specifics as to where in OI-3 the operator should go. It turned out that when the proper location was eventually found, it merely directed the operator to a third procedure, OI-2D. At least one operator never did find the correct location in OI-3 and eventually went to OI-2D on his own. The Operations Superintendent initiated efforts to correct these problems after he was informed of them at the exit meeting on October 14, 1993.
2.0 INITIAL EXAMINATION 2.1 Examination Results:
NRC RO SRO TOTAL Results Pass / Fail Pass / Fail Pass / Fail Written 8/0 2/0 10/0 Simulator 8/0 2/0 10/0 Walk-through 8/0 2/0 10/0 l
Overall 8/0 2/0 10/0 I
. _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - - _ _
_ _ _ _ _ _
_..
.
..... -....
....
._
-_
_ - _ _ _ _ _ _ - _ _ _ _ _ _ - _ - _ _ _ _ _ - _ _ _ _ - - _ _ _ _ _ _ _ _ - _ - _ _ _ _ _
.-
,
l
.
-
l
\\
2.2 Programmatic Strengths and Weaknesses:
A.
Strengths:
All ten candidates appeared well prepared to take their initial examinations. Grades e
on the written exam ranged from 83 to 96 percent. The ROs demonstrated good board knowledge and skills during the simulator scenarios while the SROs maintained good command and control. Communication skills exhibited during the scenarios were generally above average. Few weaknesses were identified with the candidates during their plant walk-through.
The plant continues to make big improvements in its plant cleanliness program over e
the last two years. Painting and lighting improvements to the lower turbine building deck were especially noted. The general state of cleanliness appeared to be commendable.
B.
Weaknesses:
The candidates displayed weakness with the following questions in the written e
examination. Note: An identified weakness is when five or more candidates miss the same examination question.
Q.008 (RO) RO candidates had difficulty identifying the individual responsible for maintaining the Equipment Availability Section for purposes of the shift turnover.
Q.033 (RO) RO candidates had difficulty identifying the effect to the main feedwater regulating system if the feedwater bypass override reset pushbutton is momentarily depressed while operating at 100% power.
Q.062 (RO)/ The candidates had trouble identifying the effect caused by a loss of Q.056 (SRO) control voltage to the Atmospheric Dump and Turbine Bypass System.
Q.080b tRO) RO candidates had difficulty identifying the vacuum setpoint at which the Unit 2 turbine bypass valves become disabled.
Q.095 (RO)/ The candidates had trouble identifying the correct plant response caused Q.093 (SRO) by the loss of 125 Vdc Bus 11.
_
-_ ____
---_
.
.
.
3.0 l'XIT MEETINGS:
On October 13, 1993, an exit meeting was held with the people indicated below to discuss
)
the observations made during the administration of the requalification examination. These i
observations are summarized in paragraph 1.2 above. At that time, the Operations l
i Superintendent indicated that he would initiate steps to correct the problems identified with the operating procedures.
On October 29,1993, a second exit meeting was held to summarize any generic concerns and observations the NRC examiners noted during the initial examination week. These observations are also summarized in paragraph 2.2 above. In addition, the following items were noted:
The training department provided good support during both the preexam site visit and f
the exam week. This support included providing good comraents on the written examination, identifying and correcting potential problems with the simulator scenarios and JPMs, maintaining the simulator so that few problems were experienced during the exam week, and providing simulate,r scenario stand-ins to augment the operating team when necessary.
The NRC stated they viewed as positive the proposed upgrading of the simulator
computer. As understood by the examiners, this proposed upgrade modification would allow the training department to add more potential plant incidents to simulator scenarios. The examiners noted that the limitations of the current computer had reduced exam flexibility regarding the range of malfunctions available.
Baltimore Gas and Electric Personnel Contacted:
W. Bimey Operations Instructor (1)
D. Frye Operations Instructor (2)
C. Gradle Compliance Engineer (1)
J. Hill General Supervisor-Nuclear Plant Operations (2)
B. Hiestand Supervisor Requalification Training (1)
D. Holm Assistant General Supervisor-Operations Training (1)(2)
N. Millis General Supervisor-Nuclear Training (1)(2)
R. Niedzielski Supervisor-Initial Training (2)
D. Rosenbaum Operations Instructor (2)
R. Wenderlich Operations Superintendent (1)(2)
(1)
Attended October 13, 1993, exit meeting (2)
Attended October 29,1993, exit meeting l
l
_ _ _ _.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _. _ _ _ _
-_- - - - - - _ - - - - - - _
-
_
_
k
$
e l
l l
l l
l ATTACIIMENT I MASTER SRO WRITTEN EXAMINATION AND ANSWER SIIEET
l
.
.
....
.
- - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
l
.
i
,
.
.
ATTACIIMENT 2 MASTER RO WRITTEN EXAMINATION AND ANSWER SIIEET l
i
i
-
.
.
.
i ATTACIIMENT 3
,
!
l Simulation Facility Report Facility Licensee: Calvert Cliffs. Units 1 and 2 j
Facility Docket Nos:
50-317 and 50-318 Operating Tests Administered from: October 25-29.1993 This form is used only to report simulator observations. These observations do not constitute audit or inspection findings and are not, without further verification and review, indicative of noncompliance with 10 CFR 55.45(b). These observations do not affect NRC certification
,
or approval of the simulation facility other than to provide information that may be used in
[
future evaluations. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating test, there was one simulator fidelity problem noted. During the administration of a steam generator tube rupture event, the channel X digital display for Pressurizer level started indicating 60 inches lower than channel Y. The operators responded as if this was a normal malfunction that had been programmed into the scenario. The facility initiated a simulator work repair order after the scenario was completed.
The licensee is planning to upgrade the simulator computer in the near future. This upgrade will allow the training staff to simulate a larger number of potential plant incidents that should be useful for operator training and engineering purposes.
l t
-
,
.
i.
,
ATTACIIMENT 1 MASTER SRO WRITTEN EXAMINATION AND-
,
ANSWER SIIEET l
~
Lgjp,I Lp>rpcy
-
,
'W g
Page 48
- SENIOR REACTOR OPERATOR
.
ANSWER:
u02 (1.00)
D REFERENCE:
CCI-112, Rev M/4, Step 6.4.D, p 28;
[3.7/4.1]
194001K102
..(KA's)
ANSWER:
002 (1.00)
C REFERENCE:
CCI-112, Rev M/4, Step 6.3Y, p 20.
[3.7/4.1]
194001K102
..(KA's)
ANSWER:
003 (1.00)
B REFERENCE:
CCI-309, Rev D/1, Step c.3, p 11.
[4.3/4.1]
194001A113
..(KA's)
ANSWER:
004 (1.00)
C MASTERCOPY
,
_
_
,
.
,
,
'
- SENIOR REACTOR OPERATOR Page 49
~
REFERENCE:
,
OPS SUPT Standing Instruct. 90-1
[3.1/4.1]
,
194001A112
..(KA's)
,
i ANSWER:
005 (1.00)
D
,
REFERENCE:
i CCI-300, Rev L/6, Step VII.D.1.c, p 30.
,
'
[3.6/3.7]
194001K101
..(KA's)
ANSWER:
006 (1.00)
.
A REFERENCE:
r CCI-300, Rev L/6, Step VII.D.3.a, p 31.
[3.6/3.7]
,
194001K101
..(KA's)
.
ANSWER:
007 (1.00)
!
B REFERENCE:
L CCI-133; GET
[3.5/4.2]
194001K116
..(KA's)
r
_
_
_
_
_
_
. _ _.. _
.
'
- SENIOR RERCTOR OPERATOR Page 50
.
I
!
ANSWER:
008 (1.00)
i D
-
l REFERENCE:
i CCI-133, Rev J/6, Step a.(3), p 17.
[3.5/4.2]
i 19'601K116
..(KA's)
,
AN5NER:
009 (1.00)
j
.
.
C
,
i i
REFERENCE:
i CCI-800, Rev D/1, Step 6.3.B.2.c, p 34.
[2.8/3.4]
194001K103
..(KA's)
,
b
ANSWER:
010 (1.00)
,
B REFERENCE:
CCI-800, Rev D/1, Step 4.16, p 10 l
[2.8/3.4]
,
194001K103
..(KA's)
,
ANSWER:
011 (1.00)
D
'
..
-
_
.
.
.
.
,
- SENIOR REACTOR OPERATOR Paga 51
.
REFERENCE:
CCI-140, Rev G/7, Step 5.3.5, p 15
[2.5/3.4]
194001A103
..(KA's)
ANSWER:
012 (1.00)
,
'
A REFERENCE:
CCI-307, Rev F/0, Step 5.3, p7
.
[3.4/3.4]
194001A106
..(KA's)
,
ANSWER:
013 (1.00)
C REFERENCE:
CCI-140, Rev G/7, Step 6.5.F, p 28
[3.1/3.4]
194001K105
..(KA's)
.
ANSWER:
014 (1.00)
C REFERENCE:
CCI-140, Rev G/7, Step 5.3.8.d, p 17
[3.1/3.4]
194001K105
..(KA's)
i l
..
,
..
,
,
Page 52 l
' SENIOR REACTOR OPERATOR
.
L i
,
ANSWER:
015 (1.00)
i A
I REFERENCE:
CCI-114, Rev E/7, Attachment 5, Section 4.a.1, p 2.
l
[3.4/3.4]
,
194001A106
..(KA's)
ANSWER:
016 (1.00)
B REFERENCE:
ERPIP 200, 300, 500 e
[3.1/4.4]
194001A116
..(KA's)
ANSWER:
017 (1.00)
A REFERENCE:
,
CCI-140, Rev G/7, Step 6.11.G.1, p 39.
?
[2.7/3.9]
194001A109
..(KA's)
,
ANSWER:
018 (1.00)
.
B t
i i
e r
!
-
.
Page 53 l
' SENIOR REACTOR OPERATOR
.
REFERENCE:
LP/CRO-60-1-6, Section d.1, p 47 LO 12 i
[3.2/3.6]
014000A102
..(KA's)
6 i
,
ANSWER:
019 (1.00)
,
D t
.
REFERENCE:
r LP/CRO-60-1-6, Section J.4.c, p 33.
LO 5.0
Similiar to EB/: CRO-60-1-70
.
L
[3.2/3.3]
+
001000c007
..(KA's)
ANSWER:
020 (1.00)
C
,
i REFERENCE:
SD 5, p 19; CCI 302D, IC07B, 11A RCP Window X-06
.
[3.5/3.4]
003000c00s
..(KA's)
,
i ANSWER:
021 (1.00)
C
REFERENCE:
LP #CRO-107-1-3, Step L.2, p 56 LO 2.15.2
,
f
[2.9/3.1]
Oo4000K201
..(KA's)
i i
l
.
i
-.
.
_
- l
-
i
.
- SENIOR REACTOR OPERATOR Page 54
.
i ANSWER:
022 (1.00)
B REFERENCE:
LP #CRO-107-1-3, Step 6.d, p 60 LO 2.17.1 EB# CRO-107-1-3-36 modified
[3.5/3.9]
004000K519
..(KA's)
i
,
ANSWER:
023 (1.00)
i B
REFERENCE:
,
SD 6, p 12.
!
>
[3.3/3.3]
,
004000G007
..(KA's)
,
t
'
ANSWER:
024 (1.00)
A l
REFERENCE:
SD 63 Figs 63-14 and 15; LP #CRO-63-1-4 LO 1.2.1.
EB# CRO-63-1-3-6 modified
,
,
[4.5/4.7)
013000A403
..(KA's)
.
ANSWER:
025 (1.00)
C
,
. -.. -,
b
-
.
.
'
'. SENIOR REACTOR OPERATOR Page 55
.
!
REFERENCE:
.
'
LP #CRO-63-1-4, Step B.1, p 21 LO 1.10
[2.8/3.8]
013000G003
..(KA's)
l ANSWER:
026 (1.00)
!
B REFERENCE:
,
SD 57, Section 3.3.2.8, p 38; LP #CRO-57-1-7, LO 4.5, 4.7
[3.1/3.2]
.
i 015000K604
..(KA's)
f ANSWER:
027 (1.00)
C REFERENCE:
LP #CRO-64-1-5, Section 3, pp 21&22 LO 4.3 EB #CRO-64-1-4-18, modified
[3.3/3.5]
017020K102
..(KA's)
?
l
>
ANSWER:
028 (1.00)
i C
i REFERENCE:
LP #CRO-7-1-5, Step 3, p 60.
LO 31.16 EB #CRO-7-1-5-84 modified
[3.6/3.6]
022000A401
..(KA's)
-. --..
.
l
'
I
.
SENIOR REACTOR OPERATOR Pago 56
'
.
'
.
ANSWER:
029 (1.00)
B REFERENCE:
LP #CRO-7-1-5, Step E.2, p 58.
LO 13.0
[3.1/3.4]
022000K402
..(KA's)
ANSWER:
030 (1.00)
A REFERENCE:
LP #CRO-103-1-3,Section III.A, p 22 LO 1.5
[2.8/3.0]
059000K418
..(KA's)
ANSWER:
031 (1.00)
D REFERENCE:
LP #CRO-34-1-5, Section G.3, p 17 LO 3.3
[4.2/4.2]
061000A301
..(KA's)
ANSWER:
032 (1.00)
B
.
SENIOR REACTOR OPERATOR Page 57
!
,
,
k REFERENCE:
t LP #CRO-34-2-3,Section II.A.1, p7 LO 1.0; TS Basis 3/4.7.1.3
EB #CRO-34-2-3-02, #26 modified
[3.9/3.9]
{
!
f 061000A104
..(KA's)
!
!
ANSWER:
033 (1.00)
D REFERENCE:
r LP #CRO-219-1-1, Section 6.e, p 10 LO 5.6 i
EB #CRO-219-1-0-34
,
'
[3.0/3.1]
f 071000A413
..(KA's)
ANSWER:
034 (1.00)
A
,
REFERENCE:
'
,
LP #CRO-122-1-3, Section 10.e, p 12 LO 3.0; SD 15, p 11.
[3.5/3.9]
,
072000K102
..(KA's)
AMSWER:
035 (1.00)
A REFERENCE:
LP #CRO-122-1-3, p 27 LO 1.3; SD 15, p 6.
[3.6/3.9]
073000K101
..(KA's)
I j
,
-
,
- SENIOR REACTOR OPERATOR Page 58 t
.
)
i ANSWER:
036 (1.00)
j
^
i REFERENCE:
LP #CRO-5-2-5, Section E.1.b, p 10 LO 4.2
'
[3.5/3.7]
002000K107
..(KA's)
,
ANSWER:
037 (1.00)
D
'
REFERENCE:
[3.4/3.9]
.
002000c010
..(KA's)
ANSWER:
038 (1.00)
'
D REFERENCE:
,
e LP #CRO-7-1-5, Section f.2, p 30 LO 3.0 j
[3.3/3.6]
006030K603
..(KA's)
ANSWER:
039 (1.00)
D
.
i
!
>
>
I
.
- _.
-
,
' SENIOR REACTOR OPERATOR Pago 59
.
l i
REFERENCE:
LP #CRO-7-1-5, LO 8.1; SD 7, p 25.
[3.2/3.5]
006000K412
..(KA's)
ANSWER:
040 (1.00)
A REFERENCE:
LP #CRO-7-1-5, Step 4.a, p 58 LO 14.1
[4.3/4.5]
,
r 026000A301
..(KA's)
,
ANSWER:
041 (1.00)
B
,
A REFERENCE:
LP #CRO-7-1-5, Step G.2, p 62 LO 28.14; SD 7, p 49
[3.1/3.6]
026000K402
..(KA's)
i ANSWER:
042 (1.00)
B
'
REFERENCE:
T LP #CRO-59-1-7, Step H.1, p 22 LO 1.02A
[4.4/4.7]
,
012000A206
..(KA's)
,
,n-
,
g
-
,
.
- SENIOR REACTOR OPERATOR Page 60
.
'
ANSWER:
043 (1.00)
D t
REFERENCE:
LP #CRO-59-1-7, Section 0, pp 30,31 LO 8.02 EB #CRO-59-1-5-49
,
[3.1/3.5]
012000K603 (KA's)
..
T ANSWER:
044 (1.00)
l C
REFERENCE:
Steam Tables
.
[3.4/3.7]
010000A109 (KA's)
..
ANSWER:
045 (1.00)
C REFERENCE:
LP #CRO-62-1-5, Section 8.b, pp 16,17 LO 5.0
[3.5/3.7)
011000K302 (KA's)
..
,
ANSWER:
046 (1.00)
D
,
,
w
-
,
,
-
y w
e
- - -
,
-.-.
'
,
' SENIOR REACTOR OPERATOR Page 61
.
REFERENCE:
LP #CRO-48-1-2, Step c, p 19 LO 5.2; SD-48, p 155.
[3.9/4.2]
064000K402
..(KA's)
ANSWER:
047 (1.00)
B l
REFERENCE:
LP #CRO-48-1-2, Step 4, p 21 LO 3.0,6.0 EB #CRO-48-1-2-06 modified
[4.0/4.3]
064000A401
..(KA's)
,
ANSWER:
048 (1.00)
A h
REFERENCE:
[3.5/3.9]
062000K301
..(KA's)
ANSWER:
049 (1.00)
.
B REFERENCE:
LP #CRO-54-1-2, Hando OH-10, LO 10.0
[3.0/3.3]
062000A210
..(KA's)
.
.
_
_
t
~
.
F
- SENIOR REACTOR OPERATOR Page 62
.
ANSWER:
050 (1.00)
i C
,
!
REFERENCE:
i i
LP #CRO-113-4-3, Section 1.d, p 6 LO 3.1; SD-10, p 29.
[2.9/3.2]
.
033000K401
..(KA's)
,
!
t
ANSWER:
051 (1.00)
A REFERENCE:
'
i LP #CRO-113-7-1, Section 4.b, p8 LO 8.1
[2.9/3.2]
,
!
079000A201
..(KA's)
-
,
ANSWER:
052 (1.00)
C
REFERENCE:
LP #CRO-134-1-5, Section K.b, p 18 LO 2.3b
[2.7/3.1]
029000A203
..(KA's)
ANSWER:
053 (1.00)
"
---
-
~_.
_
,
,_,.. _. _
_,
--
- _ _ _ _ - _ _ __ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ ____
_.
'
.
SENIOR REACTOR OPERATOR Page 63
.
REFERENCE:
01-20, Rev 14, Section B.4, p 6.
[2.9/3.3]
086000A301
..(KA's)
ANSWER:
054 (1.00)
B REFERENCE:
LP #CRO-7-1-5, Step 10, p 79 LO 16.8
[3.3/3.5]
005000c010
..(KA's)
ANSWER:
055 (1.00)
C REFERENCE:
LP #CRO-113-5-5, Section C.1.a.3, p9 LO 4.0; SD 4 0, p 62
[3.2/3.2]
008010A301
..(KA's)
ANSWER:
056 (1.00)
D REFERENCE:
SD-19, p 16; Alarm Manual ICO3, p 25; AOP-7J, p 44.
[2.7/2.9]
I I
041020K603
..(KA's)
!
l l
...
.
.
_..
..
.
...
I
-
l
.
Page 64
' SENIOR REACTOR OPERATOR
.
ANSWER:
057 (1.00)
B REFERENCE:
LP # CRC-113-7-1, Section B.1, p 10, LO 2.0,3.0; SD 41, pp 68.69
[3.1/3.3]
078000K403
..(KA's)
ANSWER:
058 (1.00)
{
l A
REFERENCE:
TS 3.1.3.6 Action a, p 3/4 1-34; EB #CRO-202-1A-90-001 EO 2.3
[3.3/3.9)
000001G003
..(KA's)
ANSWER:
059 (1.00)
D REFERENCE:
LP #SRO-206-2-1, LO 9.0; TS 3.1.1.1; EB# SRO-206-1-1-4
[3.1/3.9]
000003x107
..(KA's)
ANSWER:
060 (1.00)
C l
..
...
..
._..
-
.
' SENIOR REACTOR OPERATOR Page 65
l REFERENCE-AOP-1B, Rev 22, Section B, p 6.
[3.6/3.4]
000005A101
..(KA's)
ANSWER:
061 (1.00)
c REFERENCE:
,
AOP-1B, Rev 22, Step B.3.a.2, p 13; LOR-202-1B-90 EO 2.1 TS 3.1.3.1, Action a; EB #CRO-202-1B-0-0001
[3.1/3.3]
000005G012
..(KA's)
.
ANSWER:
062 (1.00)
D REFERENCE:
LP /SRO-201-5-1, Section Z, p 28. LO 8;EOP-5 Basis Document, Rev 2, p 71
[3.8/4.2]
.
000011K313
..(KA's)
ANSWER:
063 (1.00)
,
B
,
!
REFERENCE:
LP #SRO-201-5-1, Step 4, p 23 LO 6
,
[4.4/4.5]
000009K326
..(KA's)
--
_
.; '
.
.
-
- SENIOR REACTOR OPERATOR Page 66
,
a ANSWER:
064 (1.00)
A REFERENCE:
LP /SRO-201-5-1, Step Y, p 27 LO 7
[4.2/4.5]
'
000009K321
..(KA's)
ANSWER:
065 (1.00)
D REFERENCE:
LP-301-17-2, Step C, p 76
,
[3.7/3.7]
000011A213
..(KA's)
'
ANSWER:
066 (1.00)
!
"
C REFERENCE:
LP #CRO-106-1-6, LO 8.0; OI-1A, Rev 14, p 14.
t
!
[3.1/3.2)
000015A123
..(KA's)
,
ANSWER:
067 (1.00)
C l
__
-
_
_
_
'
.
,
.
- SENIOR REACTOR OPERATOR Page 67
.
REFERENCE:
'
LP #CRO-106-1-6, Step 1.c, p 22 LO 3.0 EB #CRO-106-1-2-11 i
[3.1/3.2]
000015G007
..(KA's)
i
,
ANSWER:
068 (1.00)
D REFERENCE:
EOP-0, Rev 2, Step A.3.1.b RNO, p8
!
[3.3/3.9]
!
000024A205
..(KA's)
ANSWER:
069 (1.00)
,
C REFERENCE:
OI-2B, Rev 10, p 33
[3.9/3.9]
'
000024A117
..(KA's)
ANSWER:
070 (1. 00)
'
A
,
REFERENCE:
LP #CRO-113-5-5, Step 6.d, p 17 LO 1.4,2.1
[2.9/3.0)
000026A107
..(KA's)
i
_-.
i
.
- SENIOR REACTOR OPERATOR Page 68
.
ANSWER:
071 (1.00)
D
]
REFERENCE:
j LP #CRO-113-5-5, LO 2.1,11.0; AOP-7C, Rev 8, Note, p 13.
[2.8/3.1]
000026A206
..(KA's)
ANSWER:
072 (1.00)
A REFERENCE:
LP #CRO-113-5-5, Section 8.a.2, p 23 LO 11.0 AOP-7C, Rev 8, Step B.1, p 9.
[3.6/3.5]
000026c010
..(KA's)
ANSWER:
073 (1.00)
A REFERENCE:
EOP Basis Document, Reactivity Control, FRP-RC, Rev 2, p6
[4.4/4.7]
000029K312
..(KA's)
ANSWER:
074 (1.00)
B j-
,
- SENIOR REACTOR OPERATOR Page 69
'
REFERENCE:
,
I
,
EOP-4, Rev 2, Step J, p 30; LP #SRO-201-4-2, Step 2.b, p 23 LO 7.0 I
,
.
[4.3/4.7]
a
,
000040K304
..(KA's)
j
t I
ANSWER:
075 (1.00)
.
i REFERENCE:
!
!
LP #CRO-34-1-5 LO 3.2; SD 34 EB #CRO-34-1-3-12
[4.5/4.5]
,
000040A102
..(KA's)
ANSWER:
076 (2.00)
!
!
a.
f b.
c.
,
d.
[0.5 each]
!
,
i REFERENCE:
AOP-7G, p 5; LP #CRO-102-1-3, LO 4.0 i
[3.9/4.1, 2.7/2.9)
000051G011 000051A202
..(KA's)
ANSWER:
077 (1.00)
B
..
l
.
' SENIOR REACTOR OPERATOR Page 70
-
REFERENCE:
EOP-7, Rev 2, Step E.2.d, p 9; LP #SRO-201-7-1, Step 2.e, p 14 LO 6.3
[3.8/4.1]
,
I 000055c006
..(KA's)
'
ANSWER:
078 (1.00)
C
,
REFERENCE:
!
EOP-7, Basis Document, Rev 2, Step L, p 32.
LP #SRO-201-7-1, Step L, p 19 LO 8.0 h
[4.3/4.6]
l 000055K302
..(KA's)
!
RNSWER:
079 (1.00)
,
A REFERENCE:
.
AOP-7J, Rev 0, p 9.
!
[3.4/3.4]
r 000057 GOO 7
..(KA's)
i i
ANSWER:
080 (1.00)
i
!
B REFERENCE:
!
LP #CRO-202-9A-3, Step L, p 14 LO 11.1A/B l
.
[4.3/4.5]
!
000068A101
..(KA's)
f i
!
!
i
-
-
.
,
..
I.
,
t
'
' SENIOR REACTOR OPERATOR Page 71 i-i ANSWER:
081 (1.00)
A
}
REFERENCE:
'
j LP #CRO-202-9A-3, Step F, p 10 LO 19.1 AOP-9A, Rev 0, p 6.
'
s
'
,
'
[4.1/4.2]
000068G010
..(KA's)
i ANSWER:
082 (1.00)
,
C REFERENCE:
.
t LP #SRO-201-3-2, Step G, p 15 LO 4.0
[4.0/4.4]
000074K311
..(KA's)
,
ANSWER:
083 (1.00)
D
REFERENCE:
,
LP #SRO-201-0-3, Section E, p 17 LO 10; EOP-0, Rev 2, Step D.1.b, p'13.
!
[4.3/4.6]
i
,.
000007A202
..(KA's)
I i
ANSWER:
084 (1.00)
,
,
!
l
.
.__ -
.
.
-
_.
.,
.. -.
,
' SENIOR REACTOR OPERATOR Page 72
>
o REFERENCE:
EOP-5 Basis Document, p 13.
[3.4/3.7]
,
000008A212
..(KA's)
?
ANSWER:
085 (1.00)
A REFERENCE:
OI-2A, Rev 24, Step C, p 7.
[3.0/3.1]
!
000022G007
..(KA's)
!
ANSWER:
086 (1.00)
B i
t REFERENCE:
i AOP-3B, Rev 8, Caution, p 18.
[3.4/3.3]
000025A103
..(KA's)
l ANSWER:
087 (1.00)
'
C REFERENCE:
!
TS Basis 3/4.4.4; LP-#CRO-5-2-5, Step 8, p 17 LO 10 l
[3.1/3.3]
000027G007
..(KA's)
i f
?
i
._
._
__
_..
_
..
,
' SENIOR REACTOR OPERATOR Page 73
..
,
ANSWER:
088 (1.00)
r A
REFERENCE:
CCI 302 Panel 1C05 Window D-33: EB #57-1-5-15
[2.8/2.9]
l 000032G009
..(KA's)
,
ANSWER:
089 (1.00)
D REFERENCE:
SD 17, p 61; AOP-2A, Rev 9, p9
[4.3/4.5]
000037A206
..(KA's)
,
ANSWER:
090 (1.00)
B
,
REFERENCE:
LP #SRO-201-6-1, Step 2.a, p 8 LO 2.0; EOP-6 Basis,'Rev 2, p 24
!
[4.2/4.5]
000038K306
..(KA's)
,
ANSWER:
091 (1.00)
C
,
r
. -.
.
.
~
.
SENIOR REACTOR OPERATOR Page 74
REFERENCE:
LP #SRO-201-6-1, Step 6.a, p 20 LO 7.0; EOP-6 Basis, Rev 2, p 37.
.
[4.1/4.3]
,
000038A105
..(KA's)
ANSWER:
092 (1.00)
A REFERENCE:
.
LP #SRO-201-3-2, Step 3, pp 21,22, LO 11.0 EOP-3 Basis Document, Rev 2, p 32
[4.4/4.6]
000054K304
..(KA's)
ANSWER:
093 (1.00)
D REFERENCE:
l LP #CRO-54-1-2, Step J.4.a, pp 17,18 LO 6.1 EB #CRO-54-1-1-07 Modified
[3.5/3.9]
,
,
000058A203
..(KA's)
ANSWER:
094 (1.00)
l A
i REFERENCE:
LP #CRO-64-1-5, Section C.2.3, p 15 LO 3.1.1
[4.3/4.4]
000056A248
..(KA's)
-
_ _
_
._
_
_
_
~
.
' SENIOR REACTOR OPERATOR Page 75
.
ANSWER:
095 (1.00)
B REFERENCE:
AOP-7D, Rev 8, Step B.1, p7 CC LER #004, 07/18/92
[3.7/3.9]
000065K308
..(KA's)
ANSWER:
096 (1.00)
D REFERENCE:
LP #CRO-122-1-3, e.2.a.i, p 14 LO 2.5
[3.1/3.5]
000061A204
..(KA's)
ANSWER:
097 (1.00)
B REFERENCE:
LP/CRO-134-1-5, Step b.2, p 13 LO 3.1;OI-22F, Rev 11, Precaution C, p 5.
EB #CRO-143-1-5-32
[3.2/4.1]
000061A206
..(KA's)
ANSWER:
098 (1.00)
A
!
-
.
' SENIOR REACTOR OPERATOR Page 76
.
REFERENCE:
LP #CRO-58-1-6, Section F, p 15 LO 5.0
[3.4/3.8]
000028A202
..(KA's)
ANSWER:
099 (1.00)
C REFERENCE:
LP #CRO-113-6-4, Section E, p 31 LO 5.8 EB #-113-6-4-04
[2.9/3.5]
000036K201
..(KA's)
,
i
,
i i
i (********** END OF EXAMINATION **********)
i
.
SENIOR REACTOR OPERATOR Page
.
ANSWER KEY r
i
,
!
MULTIPLE CHOICE 023 B
!
001 D
024 A
{
!
002 C
025 C
f 003 B
026 B
[
004 C
027 C
005 D
028 C
(
006 A
029 B
007 B
030 A
008 D
031 D
009 C
032 B
,
010 B
033 D
011 D
034 A
,
012 A
035 A
j
,
013 C
036 A
,
014 C
037 D
l 015 A
038 D'
016 B
039 D
017 A
040 A
I 018 B
041 B
!
019 D
042 B
020 C
043-D
!
021 C
044 C
i
O22 B
045 C
l l
i
-
.-
-
-
,
.
-
.
-
i
-
.
- SENIOR REACTOR OPERATOR
. Page
.
ANSWER KEY
i 046 D
068 D
,
!
MULTIPLE CHOICE 069 C
i 047 B
070 A
l
!
048 A
071 D
049 B
072 A
050 C
073 A
I 051 A
074 B
052 C
075 B
053 D
076 MATCHING i
,
054 B
a
l
055 C
b
.
!
f 056 D
c
[
057 B
d
058 A
MULTIPLE CHOICE r
'
059 D
077.
B 060 C
078 C
t I
061 C
079 A
062 D
080 B
!
063 B
081 A
'
064 A
082 C
'
065 D
083 D
>
066 C
084'
B l
>
067 C
085 A
>
\\
!
, -
,
v
~
.
SENIOR REACTOR OPERATOR Page
l
.
ANSWER KEY l
086 B
MULTIPLE CHOICE 087 C
088 A
,
089 D
,
090 B
091 C
092 A
093 D
094 A
095 B
096 D
097 B
098 A
099 C
i
)
(********** END OF EXAMINATION **********)
-
.
1
-
I ATTACIIMENT 2
.
MASTER RO WRITTEN EXAMINATION AND ANSWER SIIEET l
..
_
_
-
._
.
' REACTOR OPERATOR Paga.48
,
l
,
ANSWER:
001 (1.00)
D
!
REFERENCE:
CCI-112, Rev M/4, Step 6.4.D, p 28;
[3.7/4.1]
194001K102
..(KA's)
i
!
ANSWER:
002 (1.00)
B
,
!
t REFERENCE:
$
CCI-309, Rev D/1, Step c.3, p 11.
.
[4.3/4.1]
194001A113
..(KA's)
>
ANSWER:
003 (1.00)
C
,
i t
REFERENCE:
i.
f OPS SUPT Standing Instruct. 90-1
[3.1/4.1]
194001A112
..(KA's)
l l
.
'!
ANSWER:
004 (1.00)
l D
,
MASTERCOPY
-.
. -
.
.
-
.
i
.
' REACTOR OPERATOR Page 49
i REFERENCE:
CCI-300, Rev L/6, Step VII.D.1.c, p 30.
,
[3.6/3.7]
194001K101
..(KA's)
ANSWER:
005 (1.00)
.
A I
REFERENCE:
CCI-300, Rev L/6, Step VII.D.3.a, p 31.
[3.6/3.7]
194001K101
..(KA's)
,
ANSWER:
006 (1.00)
B REFERENCE:
CCI-133; GET
.,
!
!
[3.5/4.2]
194001K116
..(KA's)
)
ANSWER:
007 (1.00)
C REFERENCE:
CCI-800, Rev D/1, Step 6.3.B.2.c, p 34.
[2.8/3.4]
194001K103
..(KA's)
i
)
j
'*
.
REACTOR OPERATOR Page 50
.
i ANSWER:
008 (1.00)
A t
REFERENCE:
CCI-307, Rev F/0, Step 5.3, p7
[3.4/3.4]
194001A106
..(KA's)
,
ANSWER:
009 (1.00)
C REFERENCE:
.
CCI-140, Rev G/7, Step 6.5.F, p 28
[3.1/3.4]
194001K105
..(KA's)
l ANSWER:
010 (1.00)
,
C REFERENCE:
CCI-140, Rev G/7, Step 5.3.8.d, p 17
[3.1/3.4]
194001K105
..(KA's)
l l
='
i ANSWER:
011 (1.00)
,
A i
,
B
- + -
r w
- - -
,
.
- REACTOR OPERATOR Page 51
.
REFERENCE:
CCI-114, Rev E/7, Attachment 5, Section 4.a.1, p 2.
!
[3.4/3.4]
194001A106
..(KA's)
!
,
ANSWER:
012 (1.00)
B
,
REFERENCE:
ERPIP 200, 300, 500
[3.1/4.4]
194001A116
..(KA's)
!
ANSWER:
013 (1.00)
,
A
REFERENCE:
CCI-140, Rev G/7, Step 6.11.G.1, p 39.
,
[2.7/3.9]
e
!
194001A109
..(KA's)
,
!
ANSWER:
014 (1.00)
B REFERENCE:
LP/CRO-60-1-6, Section d.1, p 47 LO 12 r
[3.2/3.6]
,
014000A102
..(KA's)
,
.
' REACTOR OPERATOR Page 52
_
ANSWER:
015 (1.00)
A REFERENCE:
LP/CRO-60-1-6, Section d.5.f, p 44 LO 11.5
[3.7/3.6]
001000A302
..(KA's)
ANSWER:
016 (1.00)
C REFERENCE:
.
i LP#CRO-60-1-6, Section C.1.c, p 42.
LO 8.2, 10.2
[3.7/3.8]
001000K407
.. (KA.'s)
c ANSWER:
017 (1.00)
D REFERENCE:
LP #CRO-106-1-5, Step g, p 14 LO 7
'
[2.8/2.8]
003000A109
..(KA's)
ANSWER:
018 (1.00)
.
C
>
I i
I
___
,,
_. -
.'
' REACTOR OPERATOR Page 53
'
'
REFERENCE:
SD 5, p 19; CCI 302D, 1C07B, 11A RCP Window X-06
r
[3.5/3.4]
003000G008
..(KA's)
,
ANSWER:
019 (1.00)
,
C REFERENCE:
OI-1A, Rev 14, p 6.
,
t
[2.7/3.1]
003000A203
..(KA's)
ANSWER:
020 (1.00)
C
REFERENCE:
LP #CRO-107-1-3, Step L.2, p 56 LO 2.15.2
[2.9/3.1]
i 004000K201
..(KA's)
,
ANSWER:
021 (1.00)
l B
REFERENCE:
LP #CRO-107-1-3, Step 6.d, p 60 LO 2.17.1 t
EB# CRO-107-1-3-36 modified
[3.5/3.9)
i 004000K519
..(KA's)
t
,
-
,
.
,
I
'
REACTOR OPERATOR Paga 54
"
!
i
'
ANSWER:
022 (1.00)
D REFERENCE:
,
SD 6 CVCS, p 11;LP #CRO-107-1-3 LO 2.1
[3.6/3.1]
,
004010A402
..(KA's)
,
i i
ANSWER:
023 (1.00)
B REFERENCE:
.
t SD 6, p 12.
[3.3/3.3]
004000G007
..(KA's)
t
!
ANSWER:
024 (1.00)
,
A REFERENCE:
e SD 63 Figs 63-14 and 15; LP #CRO-63-1-4 LO 1.2.1.
f EB# CRO-63-1-3-6 modified
,
[4.5/4.7]
,
t 013000A403
..(KA's)
l t
,
?
ANSWER:
025 (1.00)
!
A i
i b
b h
a
-
.
- REACTOR OPERATOR Page 55
.
REFERENCE:
SD 63 Fig 63-7; LP #CRO-63-1-4 LO 1.2.
EB# CRO-63-1-3-16 modified
[3.9/3.8]
013000G009
..(KA's)
ANSWER:
026 (1.00)
D REFERENCE:
OI-30, Rev 11, Appendix B; LP #CRO-57-1-7, p 36 LO 6.4
[3.5/3.8]
015000A101
..(KA's)
ANSWER:
027 (1.00)
B REFERENCE:
SD 57, Section 3.3.2.8, p 38; LP #CRO-57-1-7, LO 4.5, 4.7
[3.1/3.2]
015000K604
..(KA's)
ANSWER:
028 (1.00)
C REFERENCE:
LP #CRO-57-1-7, Step F.3, p 22, 25 LO 2.4
[3.4/3.3]
015000G009
..(KA's)
l l
.
' REACTOR OPERATOR Page 56 i
,
ANSWER:
029 (1.00)
C
!
REFERENCE:
,
l LP #CRO-64-1-5, Section 3, pp 21&22 LO 4.3 EB #CRO-64-1-4-18, modified
[3.3/3.5]
l 017020K102
..(KA's)
'
l ANSWER:
030 (1.00)
t A
l REFERENCE:
LP #CRO-64-1-5, Section E, p 17 LO 3.0a
.
!
[3.6/3.8)
017020A301
..(KA's)
ANSWER:
031 (1.00)
B REFERENCE:
)
SD 63, p 100; LP #CRO-7-1-5, Step C, p 57.
LO 10.0 i
[3.6/3.8)
j 022000A102
..(KA's)
ANSWER:
032 (1.00)
C I
i
!
. _.
-,
_ - -
.
_
-
- _..
_
,
..-.,
.. -
--
- _ - - __ __________-__-_______
- _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _.
_
_
_
'
.
' REACTOR OPERATOR Page 57
.
REFERENCE:
LP #CRO-103-1-3, Section B.1.c.1, p9 LO 1.3
[3.1/3.4]
059000A212
..(KA's)
ANSWER:
033 (1.00)
B REFERENCE:
LP #CRO-103-1-3, Section d.2, p 23 LO 1.6
[3.0/2.9]
059000A408
..(KA's)
ANSWER:
034 (1.00)
D REFERENCE:
LP #CRO-34-1-5, Section G.3, p 17 LO 3.3
[4.2/4.2]
I 061000A301
..(KA's)
ANSWER:
035 (1.00)
I f
C REFERENCE:
LP #CRO-34-2-3,Section IV.A.2, p 12 LO 8.0; SD 34, p 63 q
[3.6/3.7]
061000G007
..(KA's)
I i
-
--
..
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
'
.
' REACTOR OPERATOR Page 58
.
ANSWER:
036 (1.00)
D REFERDICE:
LP #CRO-219-1-1, Section B.4, p9 LO 1.0; SD-14A,.p 5.
[2.6/3.0]
071000K401
..(KA's)
ANSWER:
037 (1.00)
A REFERDiCE:
LP #CRO-122-1-3, Section 10.e, p 12 LO 3.0; SD 15, p 11.
[3.5/3.9]
072000K102
..(KA's)
l ANSWER:
038 (1.00)
A REFERENCE:
i l
l LP #CRO-122-1-3, p 27 LO 1.3; SD 15, p 6.
{3.6/?.9]
073000K101
..(KA's)
!
ANSWER:
039 (1.00)
l
,
C
!
l i
I
-_
_
. _ _ _
. _ _ - _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _
.
..
...
.
.
.......
_..
- - _ - _ - _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ - - - _ _ _ _ _ _ _ __.
.
' REACTOR OPERATOR Page 59 l *
REFERENCE:
LP #CRO-122-1-3, p 30 LO 4.3a EB #CRO-122-1-3-31 modified
[3.1/3.2]
073000A403
..(KA's)
l ANSWER:
040 (1.00)
A REFERENCE:
(
LP #CRO-5-2-5, Section E.1.b, p 10 LO 4.2
[3.5/3.7]
002000K107
..(KA's)
ANSWER:
041 (1.00)
D REFERENCE:
LP #CRO-63-1-4, OH-32, LO 1.7.4; SD 63, pp 170, 171.
[3.9/4.2]
006020A302
..(KA's)
ANSWER:
042 (1.00)
D REFERENCE:
LP #CRO-7-1-5, Step 6.a.3, p 51 LO 7. 0
[3.5/3.7]
006020A107
..(KA's)
l
,
I l
..
.
____
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
__
.
' REACTOR OPERATOR Page 60
.
J t
ANSWER:
043 (1.00)
.
D i
l REFERENCE:
i
!
i LP #CRO-7-1-5, LO 8.1; SD 7, p 25.
'
?
[3.2/3.5]
i i
006000K412
..(KA's)
(
'
i ANSWER:
044 (1.00)
!
!
A
,
d REFERENCE:
.
LP #CRO-7-1-5, Step 4.a, p 58 LO 14.1
,
s i
[4.3/4.5]
'
026000A301
..(KA's)
i t
ANSWER:
045 (1.00)
B
,
REFERENCE:
,
LP #CRO-7-1-5, Step G.2, p 62 LO 28.14; SD 7, p 49
[3.1/3.6]
026000K402
..(KA's)
i ANSWER:
046 (1. 00)
!
B i
,
l
!
-
-.
.
.
.
,
.
,
' REACTOR OPERATOR Pago 61
.
REFERENCE:
f LP #CRO-59-1-7, Step H.1, p 22 LO 1.02A
[4.4/4.7]
012000A206
..(KA's)
i ANSWER:
047 (1.00)
A REFERENCE:
LP #CRO-59-1-7, Step H.3, p 22 LO 4.01
>
[3.3/3.4]
012000A402
..(KA's)
ANSWER:
048 (1.00)
.
D REFERENCE:
LP #CRO-59-1-7, Section O, pp 30,31 LO 8.02 EB #CRO-59-1-5-49
[3.1/3.5]
012000K603
..(KA's)
ANSWER:
049 (1.00)
C REFERENCE:
Steam Tables
[3.4/3.7)
010000A109
..(KA's)
i
!
\\
'l
.
~
.
REACTOR OPERATOR Page 62
.
ANSWER:
050 (1.00)
C REFERENCE:
LP #CRO-62-1-5, Section 8.b, pp 16,17 LO 5.0
[3.5/3.7]
011000K302
..(KA's)
ANSWER:
051 (1.00)
D REFERENCE:
LP #CRO-48-1-2, Step c, p 19 LO 5.2; SD-48, p 155.
[3.9/4.2]
064000K402
..(KA's)
ANSWER:
052 (1.00)
B REFERENCE:
LP #CRO-48-1-2, Step 4, p 21 LO 3.0,6.0 EB #CRO-48-1-2-06 modified
[4.0/4.3]
064000A401
..(KA's)
ANSWER:
053 (1.00)
A
..
!
.
l
' REACTOR OPERATOR Page 63
- REFERENCE:
'
i
.
r l
[3.5/3.9]
i
062000K301
..(KA's)
J
!,
I ANSWER:
054 (1.00)
,
,
C
REFERENCE:
!
!
SD 19, Section 3.1.3, p 10.
[3.7/3.7)
-
039000K405
..(KA's)
!
!
ANSWER:
055 (1.00)
C
'
l
REFERENCE:
LP #CRO-134-1-5, Section K.b, p 18 LO 2.3b
I
[2.7/3.1]
i 029000A203
..(KA's)
ANSWER:
056 (1.00)
D REFERENCE:
OI-20, Rev 14, Section B.4, p 6.
[2.9/3.3]
.
086000A301
..(KA's)
.
?
!
.
.
_.
-
.
_
__
.
' REACTOR OPERATOR Page 64
'O F
ANSWER:
057 (1.00)
B REFERENCE:
LP #CRO-7-1-5, Section.12.e (SOER 85-4 and 88-3), p 80 LO 16.10 t
[3.5/3.7)
005000A202
..(KA's)
ANSWER:
058 (1.00)
B
.
REFERENCE:
LP #CRO-7-1-5, Step 10, p 79 LO 16.8
[3.3/3.5]
,
005000G010
..(KA's)
i
'
I ANSWER:
059 (1.00)
l A
,
!
l REFERENCE:
LP #CRO-113-5-5, Section D.h, p 20 LO 5.0; SD 40, pp 53,62
[3.6/3.7]
l 008030A304
..(KA's)
l ANSWER:
060 (1.00)
D
,
I i
i
!
- -.
-
.
- REACTOR OPERATOR Pags 65
.
REFERENCE *
t LP /CRO-113-3-6*, Section 6.b.2, p 20, LO 7; SD 39, p 13 i
[3.6/3.8)
076000K116
..(KA's)
i ANSWER:
061 (1.00)
C REFERENCE:
SD-19, p 18
[3.0/3.1)
041020A408
..(KA's)
ANSWER:
062 (1.00)
D REFERENCE:
SD-19, p 16; Alarm Manual ICO3, p 25; AOP-7J, p 44.
[2.7/2.9]
041020K603
..(KA's)
ANSWER:
063 (1.00)
B REFERENCE:
LP #CRO-113-7-1, Section B.1, p 10, LO 2.0,3.0; SD 41, pp 68,69
[3.1/3.3]
078000K403
..(KA's)
.
- REACTOR OPERATOR Page 66
.
ANSWER:
064 (1.00)
B REFERENCE:
LP #CRO-113-7-1, Step 4, p 12, LO 3.0; SD 41, pp 68,69
[3.4/3.6]
078000K302
..(KA's)
ANSWER:
065 (1.00)
A REFERENCE:
TS 3.1.3.6 Action a, p 3/4 1-34; EB #CRO-202-1A-90-001 EO 2.3
[3.3/3.9]
000001G003
..(KA's)
ANSWER:
066 (1.00)
D REFERENCE:
LP iSRO-206-2-1, LO 9.0; TS 3.1.1.1; EB# SRO-206-1-1-4
[3.1/3.9]
000003K107
..(KA's)
ANSWER:
067 (1.00)
C
,
j
,
i REACTOR OPERATOR Page 67 Q
!
REFERENCE:
AOP-1B, Rev 22, Section B, p 6.
[3.6/3.4]
000005A101
..(KA's)
ANSWER:
068 (1.00)
C i
REFERENCE:
AOP-1B, Rev 22, Step B.3.a.2, p 13; LOR-202-1B-90 EO 2.1
'
TS 3.1.3.1, Action a; EB #CRO-202-1B-0-0001
[3.1/3.3]
000005G012
..(KA's)
!
ANSWER:
069 (1.00)
D REFERENCE:
LP #SRO-201-5-1, Section Z, p 28. LO 8;EOP-5 Basis Document, Rev 2, p 71
[3.8/4.2]
000011K313
..(KA's)
.
ANSWER:
070 (1.00)
.
B
,
REFERENCE:
LP #SRO-201-5-1, Step 4, p 23 LO 6
[4.4/4.5]
000009K326
..(KA's)
l l
l
,
i (
.
_
.
-
-
-
..
REACTOR OPERATOR Pago 68
'-
i ANSWER:
071 (1.00)
,
D l
REFERENCE:
LP-301-17-2, Step C, p 76 i
[3.7/3.7]
j 000011A213
..(KA's)
,
,
I ANSWER:
072 (1.00)
I
,
C l
l REFERENCE:
!
!
LP #CRO-106-1-6, LO 8.0; OI-1A, Rev 14, p 14.
l
[3.1/3.2]
l 000015A123
..(KA's)
i
!
!
ANSWER:
073 (1.00)
C REFERENCE:
'
LP #CRO-106-1-6, Step 1.c, p 22 LO 3.0 EB #CRO-106-1-2-11
,
[3.1/3.2]
000015G007
..(KA's)
.
i
!
ANSWER:
074 (1.00)
D i
$
%
,
...,
.
- REACTOR OPERATOR Page 69
.
REFERENCE:
EOP-O, Rev 2, Step A.3.1.b RNO, p8
[3.3/3.9]
000024A205
..(KA's)
ANSWER:
075 (1.00)
C REFERENCE:
OI-2B, Rev 10, p 33
[3.9/3.9]
000024A117
..(KA's)
-ANSWER:
076 (1.00)
A REFERENCE:
LP #CRO-113-5-5, Step 6.d, p 17 LO 1.4,2.1
[2.9/3.0]
000026A107
..(KA's)
ANSWER:
077 (1.00)
A REFERENCE:
LP #CRO-113-5-5, Section 8.a.2, p 23 LO 11.0 AOP-7C, Rev 8, Step B.1, p 9.
[3.6/3.5]
000026c010
..(KA's)
..
I i-
.
REACTOR OPERATOR Page 70 i
,
- .
a
ANSWER:
078 (1.00)
.
A REFERENCE:
EOP Basis Document, Reactivity Control, FRP-RC, Rev 2, p6 j
[4.4/4.7]
I 000029K312
..(KA's)
!
t i
.
ANSWER:
079 (1.00)
B
.
,
f
)
REFERENCE:
i LP #CRO-34-1-5 LO 3.2; SD 34 EB #CRO-34-1-3-12
+
[4.5/4.5]
000040A102
..(KA's)
i i
ANSWER:
080 (2.00)
-,
a.
b.
c.
'
d.
[0.5 each]
!
REFERENCE:
AOP-7G, p 5; LP #CRO-102-1-3, LO 4.0
[3.9/4.1, 2.7/2.9]
000051G011 000051A202
..(KA's)
ANSWER:
081 (1.00)
.
B
!
h
,
.
.
-.
-
,,
i
e
' REACTOR OPERATOR Page 71 p
i REFERENCE:
EOP-7, Rev 2, Step E.2.d, p 9; LP #SRO-201-7-1, Step 2.e, p 14 LO 6.3 I
[3.8/4.1]
!
000055G006
..(KA's)
.
ANSWER:
082 (1.00)
!
l C
l REFERENCE:
l
!
EOP-7, Basis Document, Rev 2, Step L, p 32.
LP #SRO-201-7-1, Step L, p 19 LO 8.0
[4.3/4.6]
i 000055K302
..(KA's)
ANSWER:
083 (1.00)
A REFERENCE:
AOP-7J, Rev 0, p 9.
[3.4/3.4]
,
000057G007
..(KA's)
i ANSWER:
084 (1.00)
'
B
>
REFERENCE:
.
LP #CRO-202-9A-3, Step L, p 14 LO 11.1A/B
[4.3/4.5]
i 000068A101
..(KA's)
b I
i i
- s
' REACTOR OPERATOR Page 72
.
ANSWER:
085 (1.00)
C REFERENCE:
LP #SRO-201-3-2, Step G, p 15 LO 4.0
[4.0/4.4]
000074K311
..(KA's)
ANSWER:
086 (1.00)
D REFERENCE:
LP #SRO-201-0-3, Section E, p 17 LO 10; EOP-0, Rev 2, Step D.1.b, p-13.
[4.3/4.6]
000007A202
..(KA's)
ANSWER:
087 (1.00)
B REFERENCE:
EOP-5 Basis Document, p 13.
[3.4/3.7)
'
000008A212
..(KA's)
'
.
i
.
ANSWER:
088 (1.00)
A
.
l
.
-
.
- REACTOR OPERATOR Page 73
'
.
!
REFERENCE:
,
OI-2A, Rev 24, Step C, p 7.
,
,
'
[3.0/3.1]
i'
000022G007
..(KA's)
P ANSWER:
089 (1.00)
l B
REFERENCE:
AOP-3B, Rev 8, Caution, p 18.
[3.4/3.3]
000025A103
..(KA's)
i ANSWER:
090 (1.00)
A REFERENCE:
CCI 302 Panel 1C05 Window D-33: EB #57-1-5-15 r
!
[2.8/2.9)
j 000032G009
..(KA's)
l ANSWER:
091 (1.00)
l l
D REFERENCE:
j SD 17, p 61; AOP-2A, Rev 9, p9 i
[4.3/4.5]
000037A206
..(KA's)
'
>
l l
<
'
.
__
_-.
.-
.
..
r
.
- REACTOR OPERATOR Paga 74
,
l ANSWER:
092 (1.00)
{
B REFERENCE:
!
LP #SRO-201-6-1, Step 2.a, p8 LO 2.0; EOP-6 Basis, Rev 2, p 24 l
[4.2/4.5]
,
000038K306
..(KA's)
,
ANSWER:
093 (1.00)
,
C REFERENCE:
LP #SRO-201-6-1, Step 6.a, p 20 LO 7.0; EOP-6 Basis, Rev 2, p 37.
[4.1/4.3]
,
000038A105
..(KA's)
.
L r
ANSWER:
094 (1.00)
,
A REFERENCE:
LP #SRO-201-3-2, Step 3, pp 21,22, LO 11.0 t
EOP-3 Basis Document, Rev 2, p 32
[4.4/4.6]
000054K304
..(KA's)
ANSWER:
095 (1.00)
D t
,
.
-
.. -. -
-
=
_
.
REACTOR OPERATOR Page 75
r REFERENCE:
LP #CRO-54-1-2, Step J.4.a, pp 17,18 LO 6.1 EB #CRO-54-1-1-07 Modified
[3.5/3.9]
000058A203
..(KA's)
ANSWER:
096 (1.00)
A REFERENCE:
LP #CRO-64-1-5, Section C.2.3, p 15 LO 3.1.1
[4.3/4.4]
000056A248
..(KA's)
ANSWER:
097 (1.00)
A REFERENCE:
LP #CRO-34-2-1, Step I.4, p 11 LO 5.0
.
[2.9/3.3]
000065A208
..(KA's)
ANSWER:
098 (1.00)
D REFERENCE:
LP #CRO-122-1-3, e.2.a.i, p 14 LO 2.5
[3.1/3.5]
000061A204
..(KA's)
.
- REACTOR OPERATOR Pags 76
.
ANSWER:
099 (1.00)
C REFERENCE:
LP #CRO-113-6-4, Section E, p 31 LO S.8 EB #-113-6-4-04
[2.9/3.5]
000036K201
..(KA's)
l
)
,
'
(********** END OF EXAMINATION **********)
i
!
.
-
,
!
,
j REACTOR OPERATOR Page
- a f
ANSWER F EY
?
!
i I
MULTIPLE CHOICE 02:.
B
,
s 001 D
021 A
l
!
002 B
025-A 003 C
0:!6 D
.
004 D
027 B
!
005 A
028 C
006 B
029 C
007 C
030 A
008 A
031'
B
.
009 C
032 C
'
010 C
033 B
t 011 A
034 D
j 012 B
035 C
.;
013 A
036 D
,
+
014 B
037 A
,
015 A
038 A
i
!
016 C
039 C
!
017 D
040 A
,
018 C-041 D
019 C
042 D
020 C
043 D
t
,
021 B
044 A
022 D
045 B
>
h
,
_ _..
t
,
i*
f
.,
REACTOR OPERATOR Page
,
a ANSWER KEY l
.
I
!
>
,
i 046 B
068 C
MULTIPLE CHOICE 069 D
<
,
047 A
070 B
048 D
071 D
049 C
072 C
r 050 C
073 C
,
t 051 D
074 D
052 B
075 C
053 A
076 A
054 C
077 A
,
t 055 C
078 A
'
056 D
079 B
057 B
080 MATCHING
-
OSS B
a
,
.
059 A
b
060 D
c
,
i 061 C
d
062 D
MULTIPLE CHOICE 063 B
081 B
064 B
082 C
065 A
083 A
'
066 D
084 B
I 067 C
085 C
a
!
,
~
REACTOR OPERATOR Page
<
ANSWER KEY l
.
!
'
086 D
MULTIPLE CHOICE
.
>
!
087 B
.
!
'
088 A
089 B
!
090 A
>
091 D
,
092 B
093 C
094 A
095 D
096 A
097 A
098 D
r 099 C
-
t L
,
(********** END OF EXAMINATION **********)
i
.
"
.
ATTACHMENT 3 Simulation Facility Report Facility Licensee: Calvert Cliffs. Units 1 and 2 Facility Docket Nos:
50-317 and 50-318 Operating Tests Administered from: October 25-29.1993 This form is used only to report simulator observations. These observations do not constitute audit or inspection findings and are not, without further verification and review, indicative of noncompliance with 10 CFR 55.45(b). These observations do not affect NRC certification or approval of the simulation facility other than to provide information that may be used in future evaluations. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating test, there was one simulator fidelity problem noted. During the administration of a steam generator tube rupture event, the channel X digital display for Pressurizer level started indicating 60 inches lower than channel
"
Y. The operators responded as if this was a normal malfunction that had been programmed into the scenario. The facility initiated a simulator work repair order after the scenario was completed.
The licensee is planning to upgrade the simulator computer in the near future. This upgrade will allow the training staff to simulate a larger number of potential plant incidents that should be useful for operator training and engineering purposes.
i