~,c
,
'~
>
NOV 2 21993
Docket Nos: 50-317
50-318
Mr. Robert E. Denton
Vice President - Nuclear Energy
Baltimore Gas and Electric Company
Calvert Cliffs Nuclear Power Plant
1650 Calvert Cliffs Parkway
Lusby, Maryland 20657-4702
Dear Mr. Denton:
g
SUBJECT:
REQUALIFICATION AND INITIAL EXAMINATION REPORT NOS.
-
50-317/93-20(OL) AND 50-318/93-20(OL)
-
In October 1993, the NRC administered requalification and initial license examinations at the
j
Calvert Cliffs Nuclear Power Plant, Units 1 and 2. All operators and candidates passed their
(
examinations.
From October 4-7,1993, the NRC reviewed with the Calvert Cliffs Training Department
both the proposed operator requalification examination and the proposed initial examination.
The facility incorporated the NRC comments into the requalification examination. Problems
identified with the proposed initial examination were resolved satisfactorily prior to the
examiners leaving the site.
From October 12-13,1993, the NRC administered requalification examinations to two
reactor operators and two senior reactor operators. Because only four operators were
evaluated, the NRC was not able to evaluate your requalification program in accordance with
the criteria of NUREG-1021, ES-601. The four operators passed the written, walk-through,
and simulator portions of the examination based on NRC's grading of the examination.
The requalification examination was conducted in accordance with Revision 7 to NUREG-
1021, " Operator Licensing Examiner Standards," ES-601. The purpose of this examination
was to examine the four individual operators to determine if they would satisfy the regulatory
requirement of passing an NRC- administered examination prior to license renewal. At the
conclusion of the examination, generic findings regarding improved Job Performance
Measures, minor procedural problems and overall improved written and simulator
examinations were discussed with Mr. % nderlich, Mr. Millis, and members of your staff.
9312030156 931122
ADOCK 0500 3
OFFICIAL RECORD COPY
G:CC932020.ER
ff(fin
l
"
-
. ...
_ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _
"
,
.
.
Mr. Robert E. Denton
2
NOV 2 21993
From October 25-29,1993, the NRC administered examinations to eight reactor operator
candidates and two senior reactor operator candidates who had applied for licenses to operate
the Calvert Cliffs Nuclear Power Plant, Units 1 and 2, facility. All ten candidates passed
their examinations and were issued licenses. On October 29,1993, the examination
observations were discussed with Mr. Wenderlich, Mr. Hill, Mr. Millis, and those members
of your staff identified in the enclosed examination report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and
the enclosure.s will be place in the NRC Public Document Room. Should you have any
questions ;orxrnir.g these examinations, please contact Mr. Glern Meyer, Chief, PWR
Section, at (215) 337-5211.
Sincerely,
Lee H. Bettenhausen, Chief
Operations Branch
Division of Reac.;r Safety
Enclosure:
Operator Licensing Examination Report Nos.
50-317/93-20(OL) and 50-318/93-20(OL) with
Attachments 1,2, and 3
Attac_.ments:
1. SRO Master Written Exam and Answer Sheet
2. RO Master Written Exam and Ansvier Sheet
3. Simulation Facility Report
cc w/ encl; w/o Attachments 1,2, and 3:
G. Detter, Director, Nuclear Regulatory Matters (CCNPP)
R. McLean, Administrator, Nuclear Evaluations
J. Walter, Engineering Division, Public Service Commission of Maryland
K. Burger, Esquire, Maryland People's Counsel
R. Ochs, Maryland Safe Energy Coalition
NRC Resident Inspector
State of Maryland (2)
1
OFFICIAL RECORD COPY
G:CC932020.ER
1
1
-
- - - - -
_---
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ . _
_ _ _ _ _
_
_________________________________j
___
-
--- -
____ -_____ _ ____- ____
_ __________ _
_ _ _
~
,
.
.
Mr. Robert E. Denton
3
NOV 2 21993
cc w/ encl and Attachments 1,2, and 3:
J. Hill, General Supervisor - Nuclear Plant Operations
N. L. hullis, General Supervisor, Nuclear Training
D. Holm, Assistant General Supervisor - Operations Training
Public Document Room (PDR)
Locs1 Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
bec w/ encl; w/o Attachments 1,2, and 3:
R. Gallo, Chief, OLB, NRR
V. McCree, OEDO
R. Capra, NRR
D. Mcdonald, NRR
C. Cowgill, DRP
R. Fuhrmeister, DRP
L. Nicholson, DRP
P. Wilson - Calvert Cliffs
J. Prell, DRS
P. Isaksen, EG&G
M. Jones, EG&G
OL Facility File
bec w/ encl and Attachment",1,2, and 3:
Master Exam File
bec w/ encl; w/o Attachments 1,2, and 3:
Region I Docket Room (w/ concurrences)
(VIA E-MAIL)
L. Briggs, DRP
R. Temps, DRP
(VIA E-MAIL AND NO ATTACIIMENTS)
L. Bettenhausen, DRS
G. Meyer, DRS
J. Prell, DRS
RI:DR
RI:DRS
RI:DRS
'
Pr,11
Meyer
Bettenhausen
'
S
f/GC>
/18/93
11/9/93
11E193
OFFICIAL RECORD COPY
G:CC932020.ER
.-
____
_ _ _ _ _