FINAL SALP REPORT U.S.
NUCLEAR REGULATORY COMMISSION
REGION III
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE Inspection Report Nos. 50-315/93001; 50-316/93001 Indiana Michigan Power Company Donald C.
Cook Nuclear Plant January 1,
1992, through April 30, 1993 9308090097 930730 PDR ADOCK 050003l5
Enclosure
Donald C.
Cook Nuclear Plant A.
Summar of Meetin with Indiana Michi an Power Com an on Jul
1993 The findings and conclusions of the SALP Board are documented in Report Nos.
50-315/93001; 50-316/93001 and were discussed with the licensee on July 20, 1993, at the Donald C.
Cook Visitors Center.
While the meeting was primarily a discussion between the licensee and NRC, it was open to members of the public as observers.
The following licensee and NRC personnel were in attendance, as well as the noted observers.
Indiana Michi an Power Com an E.
L. Draper, Jr.,
Chairman
& CEO American Electric Power Company E.
E. Fitzpatrick, Vice President A. A. Blind, Plant Manager Others Nuclear Re ulator Commission H. J. Miller, Deputy Regional Administrator W.
D. Shafer, Chief, Branch 2, Division of Reactor Projects (DRP)
J.
A. Isom, Senior Resident Inspector, D.
C.
Cook D. J. Hartland, Resident Inspector, D.
C, Cook B.
C.
McCabe, Acting Section Chief, Section 2A (DRP)
R. A. Paul, Senior Radiation Specialist, Division of Radiation Safety and Safeguards B. A. Wetzel, Project Manager, Project Directorate III-l, Office of Nuclear Reactor Regulation Other D.
R.
Hahn, Michigan Department Public Health E. Curtis, Private Citizen B.
Comments Received from Licensee On July 27, 1993, Indiana Michigan Power'ompany responded to the Donald C.
Cook Nuclear Plant Initial SALP ll Report dated July 2, 1993.
The NRC has considered all of your comments, and the following relates to the Engineering and Technical Support area.
At the time of the Electrical Distribution System Functional Inspection (EDSFI), February
through March 6, 1992, the conditions were as noted in the Initial SALP Report.
NRC acknowledges your actions taken as a result of the EDSFI, and they will be reviewed in subsequent inspections.
NRC's evaluation of your comments determined that none required revision to the specific content of the report.
Because there is no revision, the Initial SALP Report is considered the Final SALP Report.