MONTHYEARML23342A0942024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML23320A2592023-11-17017 November 2023 STC-23 077 Notification of the Crystal River Unit 3 Generating Plant License Termination Plan Public Meeting and Federal Register Notice ML23313A1322023-11-15015 November 2023 Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant ML23310A0712023-11-0707 November 2023 Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP ML23187A1112023-07-25025 July 2023 Acceptance of Requested Licensing Action License Request to Add License Condition to Include License Termination Plan Requirements ML23107A2722023-06-13013 June 2023 Letter Transmitting NRC Survey Results for East Settling Pond ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 IR 05000302/20220032023-05-25025 May 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2022003 ML23103A1902023-04-19019 April 2023 Request for Supplemental Information Cover Letter ML23058A2532023-03-22022 March 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River, Unit 3 - NRC Inspection Report No. 05000302/2022003 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22265A0192022-09-26026 September 2022 Nuclear Generating Plant - U.S. Nuclear Regulatory Commission'S Analysis of ADP CR3, Llc'S Decommissioning Funding Status Report (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20220022022-08-0909 August 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022002 IR 05000302/20220012022-05-0303 May 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022001 ML22116A1752022-04-27027 April 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3- Independent Spent Fuel Storage Installation Security Inspection Report 07201035/2022401 ML22105A3992022-04-18018 April 2022 Nuclear Generating Plant - Change in NRC Project Manager ML22011A1362022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan IR 05000302/20210042022-01-24024 January 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2021004 ML22024A2142022-01-24024 January 2022 Nuclear Generating Plant - NMFS NRC Letter - Crystal River Energy Complex Biological Opinion Status (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21351A0052021-12-20020 December 2021 NRC Analysis of ADP CR3, LLC Decommissioning Funding Status Report for the Crystal River Unit 3 Nuclear Generating Plant (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21322A2702021-11-24024 November 2021 Nuclear Generating Plant - Issuance of Amendment No. 260 Approving the Independent Spent Fuel Storage Installation Only Security Plan, Rev 3 IR 05000302/20210032021-11-0909 November 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021003 and 07201035/2021001 ML21288A4292021-10-18018 October 2021 Letter - Crystal River Unit 3 Nuclear Generating Plant - Correction to Safety Evaluation Related to the Issuance of Amendment No. 259 Approving the Independent Spent Fuel Storage Installation Only Emergency Plan ML21238A0952021-10-13013 October 2021 Issuance of Amendment No. 259 Approving the ISFSI-Only Emergency Plan, Revision Draft a IR 05000302/20210012021-08-12012 August 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021001 and 05000302/2021002 ML21182A1032021-07-0606 July 2021 Request for Additional Information (RAI) Related to the ISFSI-Only Emergency Plan ML21159A0422021-06-28028 June 2021 VY and CR Indirect License Transfer Package ML21060B4142021-04-12012 April 2021 U.S. Nuclear Regulatory Commission Analysis of Duke Energy Florida, Llc'S Initial Decommissioning Funding Plan for the Crystal River Independent Spent Fuel Storage Installation ML21028A5912021-03-0202 March 2021 Letter to Reid Forwarding Exemption from 10 CFR Part 20, Appendix G, Section Iii.E ML21055A7832021-02-25025 February 2021 Letter to Reid, Change in NRC Staff Project Management for Crystal River Unit 3 Nuclear Generating Plant ML21012A3142021-01-13013 January 2021 Independent Spent Fuel Storage Installation Security Inspection Plan IR 05000302/20200012020-11-19019 November 2020 NRC Inspection Report No. 05000302/2020001, Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3, Crystal River, Florida ML20269A2922020-10-0707 October 2020 NRC Form 311 QA Program Approval Revision 10 Related to Crystal River 3 ML20101G5822020-04-10010 April 2020 CR-3 License Transfer SE Corrected Cover Letter ML20069A0232020-04-0101 April 2020 Order Approving Transfer of Licensed Authority from Duke Energy Florida, LLC, to ADP CR3, LLC, and Draft Conforming Administrative License Amendment ML20050D0142020-02-19019 February 2020 NRC Independent Spent Fuel Storage Installation Inspection Report No. 07201035/2020001, Duke Energy Florida, LLC, Crystal River Unit 3, Crystal River, Florida ML20050F7702020-02-14014 February 2020 30-Day Notice of Payment from the City of Tallahassee Trust Fund Non-Qualified Nuclear Decommissioning Trust Fund for Crystal River Unit 3 ML20015A5672020-01-15015 January 2020 Independent Spent Fuel Storage Installation Security Inspection Plan ML20009D0432020-01-10010 January 2020 Letter to Hobbs, Crystal River Unit 3 Nuclear Generating Plant - Corrected Safety Evaluation for Approval of Partial Site Release for Facility Operating License No. DPR-72 ML19339G5092020-01-0202 January 2020 Letter to Hobbs, Crystal River Unit 3 Nuclear Generating Plant - Approval of Partial Site Release for Facility Operating License No. DPR-72 ML19343A8252019-12-0606 December 2019 Letter from Erika Bailey, Oak Ridge Institute for Science and Education, to John Hickman, NRC, Forwarding Independent Confirmatory Survey Summary and Results for the 3,854-Acre Area Partial Site Release at the Crystal River Energy Complex IR 05000302/20190022019-11-20020 November 2019 NRC Inspection Report No. 05000302/2019002 and Independent Spent Fuel Storage Installation Inspection Report No. 07201035/2019002, Duke Energy Florida, LLC, Crystal River Unit 3, Crystal River, Florida ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19261A0702019-09-19019 September 2019 VEGP U3 Proficiency Watches Prior to Fuel Load ML19177A0802019-06-26026 June 2019 Nuclear Generating Plant (CR-3) - Notification of Revised Post-Shutdown Decommissioning Activities Report (Revised PSDAR) ML19170A1942019-06-14014 June 2019 Application for Order Consenting to Direct Transfer of Control of Licenses and Approving Conforming License Amendment ML19129A1402019-05-15015 May 2019 Letter to Hobbs, Correction to Amendment No. 257 Approving Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Revision 1 2024-01-09
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000302/20113012011-10-24024 October 2011 Er 05000302-11-301; Operating Test September 12 - 16 & Written Exam September 22, 2011; Crystal River Unit 3; Operator License Examinations IR 05000302/20093012009-11-0303 November 2009 Er 05000302/09-301 on August 31 - September 3 and September 14 - 16, 2009 for Crystal River, Unit 3 IR 05000302/20083012008-02-22022 February 2008 NRC Examination Report 05000302-08-301 ML0733707592007-12-0303 December 2007 Er 05000302-07-301; Progress Energy Florida; 10/22-25/2007 & 10/30/2007; Crystal River Unit 3, NRC Examination Report IR 05000302/20063012006-07-18018 July 2006 Senior Reactor Operator Initial Retake Examination - Crystal River Unit 3 - NRC Examination Report 05000302/2006301 2011-10-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
ary 22, 2008
SUBJECT:
CRYSTAL RIVER UNIT 3 - NRC EXAMINATION REPORT 05000302/2008301
Dear Mr. Young:
On February 14, 2008, the Nuclear Regulatory Commission (NRC) administered the administrative topics portion of the operating test to two employees of your company who had reapplied for licenses to operate your Crystal River Unit 3. At the conclusion of the examination, the examiner discussed the examination questions and preliminary findings with those members of your staff identified in the enclosed report.
Both Senior Reactor Operator (SRO) applicants passed the retake examination. There were no post examination comments.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
FPC 2 Should you have any questions concerning this letter, please contact me at (404) 562-4550.
Sincerely,
/RA/
Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Docket No.: 50-302 License No.: DPR-72 cc: (See page 3)
Enclosure:
Report Details
FPC 3
REGION II==
Docket No.: 50-302 License No.: DPR-72 Report No.: 05000302/2008301 Licensee: Progress Energy Florida (Florida Power Corporation)
Facility: Crystal River Unit 3 Location: 15760 Power Line Street Crystal River, FL 34428 Dates: Operating Test (Administrative Portion) - February 14, 2008 Examiners: F. Ehrhardt, Chief, Senior Operations Engineer Approved by: Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Enclosure
SUMMARY OF FINDINGS ER 05000302/2008301, 02/14/2008; Crystal River Unit 3; Licensed Operator Examinations.
The NRC examiner conducted an operator licensing initial retake examination in accordance with the guidance in NUREG-1021, Revision 9, Operator Licensing Examination Standards for Power Reactors. This examination implemented the operator licensing requirements of 10 CFR §55.41, §55.43, and §55.45.
The NRC administered the administrative topics portion of the operating test on February 14, 2008. The retake test was developed by the Crystal River Training Staff.
Two SRO applicants passed the retake test. Both SRO applicants were issued operating licenses. There were no post examination comments.
No findings of significance were identified.
Enclosure
Report Details 2. OTHER ACTIVITIES 4OA5 Operator Licensing Initial Examinations a. Inspection Scope The Crystal River Unit 3 Training Staff developed the administrative portion of the retake operating test in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9. Examination changes agreed upon between the NRC and the licensee were made according to NUREG-1021 and incorporated into the final version of the examination materials.
The examiner reviewed the licensees examination security measures while preparing and administering the examinations to ensure examination security and integrity complied with 10 CFR 55.49, Integrity of Examinations and Tests.
The examiner evaluated two SRO applicants who were being assessed under the guidelines specified in NUREG-1021. The examiner administered the administrative topics portion of the operating test on February 14, 2008. The evaluations of the applicants and review of documentation were performed to determine if the applicants, who applied for licenses to operate the Crystal River Unit 3, met requirements specified in 10 CFR 55, Operators Licenses.
b. Findings No findings of significance were identified.
The NRC determined that the quality of the submitted examination material provided by the licensee for the retake test was within the range of acceptability expected for the proposed examination. Two SRO applicants passed the retake examination.
The licensee did not submit any post examination comments.
Copies of all individual examination reports were sent to the facility Training Manager for evaluation and determination of appropriate remedial training.
Enclosure
4OA6 Meetings Exit Meeting Summary On February 14, 2008, the examiner discussed generic issues with Mr. J. Franke and members of the Crystal River Unit 3 staff. The examiner asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
PARTIAL LIST OF PERSONS CONTACTED Licensee personnel J. Franke, Director Site Operations R. Hons, Training Manager M. Van Sicklen, Superintendent Operations Training M. Broussard, Operations Requalification Instructor D. Herrin, Licensing F. Lawrence, Supervisor Operations Initial Training, Acting F. Dola, Training A. Kennedy, Initial Operations Instructor Enclosure