Text
=
.
- "%
UNITED STATES f
-
f4 l4 NUCLEAR REGULATORY COMMISSION
['-
g
$..
, j REGION 11
,
230 PEACHTREE STREET, N. W.
SulTE SIS
.
%
.
.....
IE Inspec. tion Report No. 50-302/76-10 Licensee:
Florida Power Corporation 3201 34th Street, South P. O. Box 14042 St. Petersburg, Florida 33733 i
Facility Name:
Crystal River 3 Docket No.:
50-302 License No.:
CPPR-51 Category:
B1
Location:
Crystal River, Florida
.
Type of License:
B&W, PWR, 2452, Mwt Type of Inspection:
Routine,
'nounced Dates of Inspection: May 26-28, 1976 Dates of Previous Inspection: May 11-14, 1976 Principal Inspector:
F. Jape, Reactor Inspector Reactor Projects Section No. 2
.
Reactor Operations and Nuclear Support Branch Inspectors:
W. L. Britz, Radiation Specialist Environmental and Special Projects Section Fuel Facility and Material Safety Branch Other Accompanying Personnel:
W. W. Peery, Radiation Specialist, Region II
/? 75 A c A _.
Principal Inspector:
Id4L
/
f F. Jape, Reactor Inspector Date Reactor Projects Section No. 2 Reactor Operations and Nuclear Support Branch
/
e
'
I// O/:
Reviewed by: /.'
/-
-
/
R. C. Lewis, Chief Date Reactor Projects Section No. 2 Reactor Operations and Nuclear Support Branch 8002270h,
.
..
.
.
-
.-.
.. -.
-
..
.
..
..
.--
.-
..
.
-
.
,
..
-
,
.
IE Rpt. No. 50-302/76-10-2--
.
SUMMARY OF-FINDINGS
Is Enfor ement Items
J None II.
Licensee Action on Previously Identified Enforcement Matters
None i
III. New Unresolved Items None i
IV.
Status of Previously Reported Unresolved Items j
'
None V.
Unusual Occurrences
,
None VI.,
Other Significa.t Findings
'
None
VII. Management Interview
.
A management interview was held on May 28, 1976 with G. P. Beatty, Plant Superintendent anJ. his staff.
Items covered by the inspection
!
were discussed.
<
.
i e
.
I i
',
/
'
.-- - -
- -.
..
.
.
..
_... _ _ _ _ _., _ _ _
.
__
.
.
-
.
,.. -
..
,'
,g%
-
-
.
IE Rpt. No. 50-302/76-10 I-2 O
.
.
r eports to the licensee containing environmental data.from the
-
ilniversity and State. The University provides all of the input to
- he licensee's environmental reports and the St. Petersburg office assures compliance with the Technical Specifications.
4.
Quality Control of Analytical Measurements Quality Assurance for the radiation chemistry laboratory was reviewed and the inspector had no further questions. A licensee representative stated that audits of the radiation chemistry laboratory will address Technical' Specification requirements, the plant operation quality assurance manual and the administrative procedures for the laboratory. The exhaust hoods were not completed. A licensee representative stated that the hoods will be made operational in time for their use in the analytical program in advance of fuel loading.
...
Y f
,
'~
5.
Confirmatory Measurements
,.
I
,
The licensee had not analyzed tests stands.rds, previously provided, for comparison with the NRC reference laboratory. Licensee repre-
,
sentatives were informed of the need to provide the NRC with their analysis results adequately in advance of fuel loading to allow a determination of agreements of the results. Licensee representatives
!
agreed.
t A.
,
,