IR 05000302/1976010

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-302/76-10 on 760526-28.No Noncompliance Noted.Major Areas Inspected:Qc of Analytical Measurements & Confirmatory Measurements
ML19308D363
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/19/1976
From: Britz W, Jape F, Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19308D353 List:
References
50-302-76-10, NUDOCS 8002270818
Download: ML19308D363 (3)


Text

=

.

  1. "%

UNITED STATES f

-

f4 l4 NUCLEAR REGULATORY COMMISSION

['-

g

$..

, j REGION 11

,

230 PEACHTREE STREET, N. W.

SulTE SIS

.

ATl.ANTA. G EO R GI A 30303

%

.

.....

IE Inspec. tion Report No. 50-302/76-10 Licensee:

Florida Power Corporation 3201 34th Street, South P. O. Box 14042 St. Petersburg, Florida 33733 i

Facility Name:

Crystal River 3 Docket No.:

50-302 License No.:

CPPR-51 Category:

B1

Location:

Crystal River, Florida

.

Type of License:

B&W, PWR, 2452, Mwt Type of Inspection:

Routine,

'nounced Dates of Inspection: May 26-28, 1976 Dates of Previous Inspection: May 11-14, 1976 Principal Inspector:

F. Jape, Reactor Inspector Reactor Projects Section No. 2

.

Reactor Operations and Nuclear Support Branch Inspectors:

W. L. Britz, Radiation Specialist Environmental and Special Projects Section Fuel Facility and Material Safety Branch Other Accompanying Personnel:

W. W. Peery, Radiation Specialist, Region II

/? 75 A c A _.

Principal Inspector:

Id4L

/

f F. Jape, Reactor Inspector Date Reactor Projects Section No. 2 Reactor Operations and Nuclear Support Branch

/

e

'

I// O/:

Reviewed by: /.'

/-

-

/

R. C. Lewis, Chief Date Reactor Projects Section No. 2 Reactor Operations and Nuclear Support Branch 8002270h,

.

..

.

.

-

.-.

.. -.

-

..

.

..

..

.--

.-

..

.

-

.

,

..

-

,

.

IE Rpt. No. 50-302/76-10-2--

.

SUMMARY OF-FINDINGS

Is Enfor ement Items

J None II.

Licensee Action on Previously Identified Enforcement Matters

None i

III. New Unresolved Items None i

IV.

Status of Previously Reported Unresolved Items j

'

None V.

Unusual Occurrences

,

None VI.,

Other Significa.t Findings

'

None

VII. Management Interview

.

A management interview was held on May 28, 1976 with G. P. Beatty, Plant Superintendent anJ. his staff.

Items covered by the inspection

!

were discussed.

<

.

i e

.

I i

',

/

'

.-- - -

- -.

..

.

.

..

_... _ _ _ _ _., _ _ _

.

__

.

.

-

.

,.. -

..

,'

,g%

-

-

.

IE Rpt. No. 50-302/76-10 I-2 O

.

.

r eports to the licensee containing environmental data.from the

-

ilniversity and State. The University provides all of the input to

he licensee's environmental reports and the St. Petersburg office assures compliance with the Technical Specifications.

4.

Quality Control of Analytical Measurements Quality Assurance for the radiation chemistry laboratory was reviewed and the inspector had no further questions. A licensee representative stated that audits of the radiation chemistry laboratory will address Technical' Specification requirements, the plant operation quality assurance manual and the administrative procedures for the laboratory. The exhaust hoods were not completed. A licensee representative stated that the hoods will be made operational in time for their use in the analytical program in advance of fuel loading.

...

Y f

,

'~

5.

Confirmatory Measurements

,.

I

,

The licensee had not analyzed tests stands.rds, previously provided, for comparison with the NRC reference laboratory. Licensee repre-

,

sentatives were informed of the need to provide the NRC with their analysis results adequately in advance of fuel loading to allow a determination of agreements of the results. Licensee representatives

!

agreed.

t A.

,

,

l

,

i

-_

,

._

.-

_

_

. _..

_. _ _ _ _ _ _

.

_